Attachment 9 Seeley Campground Plans.pdf
PDF 2 MB Posted
- Attached to
- GAOA Lolo Recreation Site Water System Replacements Federal contract opportunity
- Solicitation number
- 1240LU24B0002
- Issued by
- Department of Agriculture Forest Service
About this file
This document includes engineering plans and specifications for water system improvements at Seeley Lake and Riverpoint Campgrounds on the Lolo National Forest. The plans call for replacing an existing pump house and water mains with new infrastructure, including a 2-inch diameter polyethylene water main throughout the campground, new water services connecting to existing lines, hydrant replacements, and abandoning existing pipes in place. The related federal contract opportunity is a solicitation from the U.S. Department of Agriculture Forest Service seeking to replace water systems at multiple Lolo National Forest recreation sites. Questions regarding the solicitation are due by February 29, 2024 and shall be directed to the point of contact listed. The solicitation does not include information on pricing, set asides, incumbent contractors, or award dates.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONNECT TO EXISTING
HYDRANT SERVICE
C TO EXISTIN
RT STATION
E
0 50 100 ------ - Scale in Feet
FULLSIZE SCALE: 1"=100'
HALFSIZE SCALE: 1 "=200'
F:I1-08101-Lolo NF Seeley Lake Campground
NEW PUMP HOUSE
SEE TYPICAL TRENCH/ROAD
CROSSING DETAILffi
EXISTING PUMP HOUSE TO BE REMOVED
AND REPLACED AT NEW LOCATION.
SEE SHEET 5 FOR DETAILS.
STING WATER MAIN IN-PLACE
CL.ASS 200, POLYETHYLENE
SEE TYPICAL TRENCH DETAILffi
CONNECT TO EXISTING
HYDRANT SERVICE
CONNECT TO EXISTING
HYDRANT SERVICE
CONNECT TO EXISTING FACILITY
CONNECT O EXISTING
SERVICE
LEGEND
EXISTING CHIP SEAL ROAD
EXISTING CHIP SEAL ROAD (LOCATION APPROXIMATE)
-998- EXISTING CONTOURS
--w-- EXISTING WATER MAIN
1:8:J EXISTING PICINIC TABLE
-- ,. -- EXISTING SEWER FORCE MAIN
1%1 EXISTING SEWER COMPONENT
G, EXISTING 36" OR LARGER TREE
e EXISTING 24" OR SMALLER TREE
[ID EXISTING BUILDING
II) EXISTING POWER BOX
-w-- NEW 2" DIA. WATER MAIN
-•- NEW WATER SERVICE (CONNECT TO EXISTING)
~ NEW CONTROL POINT
EXISTING PIPE TO BE
ABANDONED IN-PLACE
Prepared By:
engineering
2501 IE.T \1EW DRIVE (408)448--M27
1-E.ENA. MONTANA 58001 REGION ONE
OVERALL SITE PLAN - SEELEY LAKE
SEELEY LAKE & RIVERPOINT CAMPGROUNDS
WATER SYSTEM IMPROVEMENTS
LOLO NATIONAL FOREST
Designed_....fl.f:.S...._Design Checked_JK. __
Drawn__}..MME...~Drawing Checked __ _ SHEET 3 of 13
Date APRIL 2008
REPLACE
REPLACE
REPLACE
REPLACE
REPLACE
CONNECTION AT
------------------- REPLACE 2" DIA. WATER MAIN
nkegel Highlight nkegel Highlight
File details come from the government source that posted it. Updated .