The file's text, extracted by GovTribe without its formatting.
Attachment 2, Schedule of Items/Price Schedule Baker Site DM
1240LT26R0006
| Item Number |
| Description |
| Unit |
| Quantity |
| Unit Price |
| Total |
| 002AA |
| Remove/Replace Asphalt Shingles |
| SQ |
| 15 |
| 0002AB |
| Remove/Replace Siding |
| SQ |
| 17 |
| $ |
| $ |
| 0002AC |
| Remove/Replace Gutters/Downspouts |
| LF |
| 160 |
| $ |
| $ |
| 0002AD |
| Remove/Replace Sidewalk |
| LF |
| 50 |
| $ |
| $ |
| 0002AE |
| Remove/Replace Interior Doors |
| EA |
| 10 |
| $ |
| $ |
| 0002AF |
| Parking lot Repair/Resurface |
| SF |
| 4000 |
| $ |
| $ |
| 0002AG |
| Concrete Foundation Repair |
| SF |
| 30 |
| $ |
| $ |
| 0002AH |
| Remove/Replace Exterior Steps |
| EA, Step |
| 3 |
| $ |
| $ |
| 0002AI |
| Remove/Replace Damaged Drywall |
| SF |
| 2400 |
| $ |
| $ |
| 0002AJ |
| Remove/Replace Cabinets |
| LF |
| 20 |
| $ |
| $ |
| 0002AK |
| Remove/Replace Counter tops |
| LF |
| 15 |
| $ |
| $ |
| 0002AL |
| Remove/Replace Windows |
| EA |
| 16 |
| $ |
| $ |
| 0002AM |
| Refinish Flooring |
| SF |
| 315 |
| $ |
| $ |
| 0002AN |
| Remove and Replace Carpet/Vinyl |
| SF |
| 900 |
| $ |
| $ |
| 0002AO |
| Interior Painting |
| SF |
| 4250 |
| $ |
| $ |
| Item Number |
| Description |
| Unit |
| Quantity |
| Unit Price |
| Total |
| 0002AP |
| Concrete Epoxy Paint |
| SF |
| 750 |
| $ |
| $ |
| 0002AQ |
| Floor Drain Replacement |
| EA |
| 1 |
| $ |
| $ |
| 0002AR |
| Install Built in Storage shelving |
| EA |
| 1 |
| $ |
| $ |
| 0002AS |
| Remove/Replace Ceiling Tiles |
| SF |
| 12 |
| $ |
| $ |
| 0002AT |
| Remove/Replace Tub/Shower/Vanity/Sin |
| EA |
| 2 |
| $ |
| $ |
| 0002AU |
| Remove/Replace Furnace |
| EA |
| 1 |
| $ |
| $ |
| 0002AV |
| Remove/Replace Main Service Switchgear |
| EA |
| 1 |
| $ |
| $ |
| 0002AW |
| Remove/Replace Circuit Breakers |
| EA |
| 1 |
| $ |
| $ |
| 0002AX |
| Remove/Replace Electrical Panel |
| EA |
| 1 |
| $ |
| $ |
| 0002AY |
| Remove/Replace Light Fixtures |
| EA |
| 20 |
| $ |
| $ |
| 0002AZ |
| Replace Smoke Detectors |
| EA |
| 8 |
| $ |
| $ |
| 0002BA |
| Lead Paint/Asbestos Mitigation |
| LS |
| 1 |
| $ |
| $ |
| 0002BB |
| Remove/Replace Exterior Door |
| EA |
| 2 |
| $ |
| $ |
| 0002BC |
| Remove/Replace Fridge |
| EA |
| 1 |
| $ |
| $ |
| 0002BD |
| Remove/Replace Stove |
| EA |
| 1 |
| $ |
| $ |
| 0002BE |
| Remove/Replace Sink/Faucet |
| EA |
| 1 |
| $ |
| $ |
| Item Number |
| Description |
| Unit |
| Quantity |
| Unit Price |
| Total |
| 0003AA |
| Remove/Replace Concrete |
| LF |
| 60 |
| $ |
| $ |
| 0003AB |
| Remove/Replace Gutters/Downspouts |
| LF |
| 175 |
| $ |
| $ |
| 0003AC |
| Remove/Replace Siding |
| SQ |
| 16 |
| $ |
| $ |
| 0003AD |
| Remove/Replace Exterior Door |
| EA |
| 3 |
| $ |
| $ |
| 0003AE |
| Remove/Replace Cabinets |
| LF |
| 50 |
| $ |
| $ |
| 0003AF |
| Remove/Replace Counter Tops |
| LF |
| 50 |
| $ |
| $ |
| 0003AG |
| Remove/Replace Windows |
| EA |
| 10 |
| $ |
| $ |
| 0003AH |
| Remove/Replace Vinyl Flooring |
| SF |
| 3000 |
| $ |
| $ |
| 0003AI |
| Remove/Replace Toilet/Urinal |
| EA |
| 2 |
| $ |
| $ |
| 0003AJ |
| Remove/Replace Shower/Tub |
| EA |
| 2 |
| $ |
| $ |
| 0003AK |
| Remove/Replace Water Heater |
| EA |
| 1 |
| $ |
| $ |
| 0003AL |
| Remove/Replace Industrial Stove |
| EA |
| 2 |
| $ |
| $ |
| 0003AM |
| Remove/Replace Light Fixtures |
| EA |
| 10 |
| $ |
| $ |
| 0003AN |
| Remove/Replace Sink and Faucet |
| EA |
| 2 |
| $ |
| $ |
| 0003AO |
| Remove/Replace Bathroom Cabinet/Sink/Faucet |
| EA |
| 2 |
| $ |
| $ |
| 0003AP |
| Remove/Replace Refrigerators |
| EA |
| 4 |
| $ |
| $ |
| 0003AQ |
| Remove/Replace Damaged Drywall |
| SF |
| 150 |
| $ |
| $ |
| 0003AR |
| Interior Painting |
| SF |
| 7500 |
| $ |
| $ |
| Item Number |
| Description |
| Unit |
| Quantity |
| Unit Price |
| Total |
| 0003AS |
| Exterior Lighting |
| EA |
| 3 |
| $ |
| $ |
Optional Items
| Item Number |
| Description |
| Unit |
| Quantity |
| Unit Price |
| Total |
| 0004AA |
| Remove/Replace Fiberglass Shingles |
| SQ |
| 5 |
| $ |
| $ |
| 0004AB |
| Remove/Replace Window |
| EA |
| 4 |
| $ |
| $ |
| 0004AC |
| Concrete Landing Replacement |
| SF |
| 9 |
| $ |
| $ |
| 0004AD |
| Exterior Painting |
| SF |
| 700 |
| $ |
| $ |
| 0004AE |
| Replace/Repair Sliding Door Column |
| EA |
| 1 |
| $ |
| $ |
| 0004AF |
| Repair/Replace Roof Vent |
| EA |
| 1 |
| $ |
| $ |
| 0004AG |
| Remove/Replace Broken Siding |
| SQ |
| 2 |
| $ |
| $ |
EA = Each, LF = Linear Foot, LS = Lump Sum; SF = Square Foot, SQ = Square
Schedule Notes:
1. The proposer must bid on all items. Round to the nearest cent.
2. In the event of an error in extending the item prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations.
3. Offers for Quantities less than those listed in the numbered items may be rejected.
4. Payment for bond premiums in accordance with FAR 52.232-5. Payments under Fixed-Price Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.
5. The pay items in the Schedule of Items may have suffixes that do not appear on the pay items in the specifications. The suffixes pertain only to sizes, classes, and/or types indicated in the item ‘Descriptions,’ and are used by the Government for computer tabulation of price schedules. For the abbreviations in the schedule descriptions, see Special Project Specification, SPS 101 (07/07/1997).
6. One contract will be awarded to the responsive and responsible proposer offering the best value to the Government.
7. The successful Contractor must be registered in the System for Award Management (SAM) data base before an award is issued.
8. This is a Request for Quote (RFQ); no public opening will be held. Results will not be made public prior to award. Proposals submitted in response to this TOPR will not be returned and will be retained by the U.S. Forest Service for official record purposes. This TOPR does not commit the Government to pay any costs incurred in the preparation or the submission of a proposal, or to make any award.
9. Proposals received after the stated closing date and time for submission will be deemed late and will not be considered for award. Contractors are urged to thoroughly read the solicitation and to review all attachments prior to preparing and submitting a proposal.
Price quotation furnished by:
| Name: | | _____________________________________ |
| Phone: | ________________________________ | |