This is Amendment 0001 to solicitation 1240LT26Q0187 for exterior restoration work on the Lone Cone Cabin located in the Gunnison/Grand Uncompahgre (GMUG) National Forest near Norwood Road, Colorado. The amendment, issued by USDA Forest Service CSA Intermountain on October 14, 2026, consolidates 21 contractor questions and answers and adds Attachment 6 (Site Plan Dimensions) to the solicitation documents. The period of performance runs from November 5, 2026, through June 30, 2027.
The amendment addresses critical project specifications including removal and replacement of all existing chinking on log joints, power washing or media blasting to remove old stain and prepare surfaces, application of borate wood preservative to the entire exterior, and application of exterior log stain color-matched to existing finishes. Window sills/sub-sills measuring approximately 42 inches each require repair or replacement of rotted portions only. The contractor must use industry-standard, high-quality products for chinking, backing rod, borate preservative, and exterior stain, submitted as part of the proposal for evaluation. The contractor is responsible for site security, has access to on-site water, restrooms, electricity, and cabin accommodations during the work period. The cabin will remain unoccupied during exterior work. Any unforeseen rotten logs discovered during performance require formal Contracting Officer approval and contract modification; bidders must price strictly per the Schedule of Items provided. Prospective bidders are encouraged to attend a site visit to take precise measurements, as linear footage of joints requiring chinking is not specified. Extensions to the period of performance require Contracting Officer approval through contract modification. The point of contact is Contract Specialist Holly Hlavac at Holly.Hlavac@usda.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att.6 - Site Plan Dimensions.pdf | ||
| Att.4-C04-Lone Cone House Pictures.pdf | ||
| Att.5-C04-DBA Wage Determination.pdf | ||
| Att.2-C04-Schedule of Items.xlsx | XLSX spreadsheet | |
| C04-Solicitation 1240LT26Q0187.pdf | ||
| Att.3-C04-Location Map.pdf | ||
| Att.1-C04-Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LT26Q0187
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LT
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 8
10/14/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/14/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project Title: Lone Cone Chinking, GMUG NF, Norwood Road, Colorado
The purpose of this amendment is the following:
1. Consolidated questions and answers, the site visit sign-in sheet is incorporated into the amendment.
2. Addition of Attachment 6 - Site Plan Dimensions (Att.6-Site Plan Dimensions).
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
LUCAS J. DAHLMAN
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Point of contact for this amendment is Contract Specialist, Holly Hlavac at Holly.Hlavac@usda.gov.
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 7CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LT26Q0187/0001
Period of Performance: 11/05/2026 to 06/30/2027
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Date: 10/14/2026
SUBJECT: Summary of Changes, Amendment 0001, Consolidated Questions and Answers, 1240LT26Q0187_Lone Cone Chinking, GMUG NF, Norwood Road, Colorado
Contractor Questions:
1. Please confirm whether all existing stain/paint must be removed from the exterior logs, or only deteriorated areas.
U.S. Forest Service Response:
Only deteriorated areas, the new stain is to be a color match.
2. Please confirm whether only deteriorated window sills/sub-sills are to be repaired/replaced, or if the complete windows must also be replaced.
U.S. Forest Service Response:
Only 2 sills are mentioned to be vertically flush cut to remove the rotted portion.
3. Please provide available drawings or exterior dimensions of the cabin along with elevations.
U.S. Forest Service Response:
See addition of Att.6 Site Plan Dimensions Lone Cone Cabin and Att. 4-C04-Lone Cone House Picture that was published at time of Solicitation in SAM.gov. under attachments and links.
4. Please provide the dimensions of the window sills/sub-sills requiring repair or replacement.
U.S. Forest Service Response:
42”+/- each
5. Please confirm whether the exterior stain is also required on windows, doors, and wood trim.
U.S. Forest Service Response:
All of the exterior wood.
6. Please confirm whether all existing chinking must be removed, or only loose, damaged, or deteriorated material.
U.S. Forest Service Response:
Replace all chinking.
7. Please provide the approximate total linear footage of joints requiring chinking, if available.
U.S. Forest Service Response:
Prospective bidders are highly encouraged to attend the site visit to take precise measurements and fully assess the project conditions.
8. Please confirm whether the borate preservative and exterior stain are required on the entire exterior or only repaired areas.
U.S. Forest Service Response:
Entire exterior.
9. Please provide the required exterior stain color and product specifications U.S. Forest Service Response:
Color match is required, specific products that will achieve the desired results, are to be recommended by the bidder.
10. Has the existing stain/paint been tested for lead or other hazardous materials?
If so, please provide the results.
U.S. Forest Service Response:
No
11. Please confirm whether on-site water, restrooms, and electricity will be available for Contractor use.
U.S. Forest Service Response:
Yes, facilities will be available for use by the contractor during the work period.
12. Please confirm whether the cabin will remain unoccupied during the exterior work.
U.S. Forest Service Response:
Yes, unoccupied.
13. If rotted logs are found during abrasive cleaning, will we replace them and should that be bid?
U.S. Forest Service Response:
Offerors shall submit pricing strictly in accordance with the Schedule of Items provided in the solicitation documents (Att. 2-C04-Schedule of Items). Any unforeseen rotten or non-structurally sound logs identified during performance will be evaluated through discussions, and any additional work must be formally approved by the Contracting Officer and executed via a contract modification.
The Government cannot quantify or evaluate items outside the scope of the current solicitation.
14. The Period of Performance ends 06/30/2027. What happens if we have an extended winter and the project cannot be completed?
U.S. Forest Service Response:
Any extension to the period of performance must be approved by the Contracting Officer and, if authorized, formalized through a contract modification. Weather and working conditions will be documented and evaluated upon the commencement of performance and throughout the progress of the work.
15. Do some or any of the varmint and bird pecked holes extend thru the walls of the structure, are the walls finished inside the structure?
U.S. Forest Service Response:
An inspection of the interior walls confirmed that they are completely finished.
Regarding penetrations through the log exterior, the contractor is responsible for mitigating any infiltration into the living space while preparing the building exterior, in accordance with Item 0002 of the Schedule of Items. Additionally, under Item 0003 (Install chinking material and other fillers), the contractor shall provide and install all necessary backing material required for proper chinking application.
16. Will Cabin be available stay in while performing work?
U.S. Forest Service Response:
The cabin will be available for the contractor to stay in while performing work under the contract.
17. Can the purchaser please clarify if exterior media blasting and restaining of the entire cabin log wood exterior is being requested in addition to horizontal and vertical log joint chinking?
U.S. Forest Service Response:
The Statement of Work (Att.1-C04-Statement of Work) 3.0 Technical Requirements Tasks explicitly states that the “Contractor should prep building exterior by power washing or media blasting to remove old stain/paint and surface wrought.
Clean all voids in the exterior (including upward facing checks 3/8” or greater).
The exterior surface must be clean and free of all contaminants, including dust, dirt, loose wood fibers, and uncured oils”.
Apply a heavy coat of borate wood preservative to protect against decay and carpenter bees, then apply a high-quality exterior log stain, colored like the existing color.
18. Please confirm the average and maximum joint width/depth.
See Question 7
19. Please confirm whether all existing chinking must be removed.
See Question 6
20. Please confirm whether scaffolding/lifts and full vehicle access are permitted.
U.S. Forest Service Response:
Scaffolding or lifts are acceptable for the contractor to employ, as long as no damage is done to surrounding and adjacent resources. Full-sized vehicle access is also available. Contractor shall be responsible for security of the site while under its control.
21. Please confirm whether specific chinking or borate products are required.
U.S. Forest Service Response:
Per Section 3, Contractor Requirements, Attachment 1-C04 – Statement of Work:
• Fill with an appropriate chinking product or wood filler that is appropriate for each specific location. After the voids are filled, chink all log joints with a high-quality product.
• Apply a heavy coat of borate wood preservative to protect against decay and carpenter bees, then apply a high- quality exterior log stain, colored like the existing color.
High quality would be defined as an industry standard, recognized product that the contractor will submit as part of their proposal. Evaluation of products would include applicability, components, durability, suitability, function, warranty, etc.
This shall apply to Chinking, Calking, Backing Rod, Borate Wood Preservative and Exterior Log Stain.
The government is soliciting for a knowledgeable, quality contractor who has the knowledge, skills and abilities to extend the life of the historic Lone Cone Cabin using industry standard methods and materials.
File details come from the government source that posted it. Updated .