This is Amendment 0001 to Solicitation 1240LT26Q0094 for the Palisades Lagoon Liner & Effluent Sprinkler System Replacement on the Coronado National Forest, issued by USDA Forest Service, CSA Intermountain Region 8, located in Ogden, Utah. The amendment, effective September 2, 2026, extends the offer receipt deadline from September 9, 2026 at 5:00 p.m. to September 17, 2026 at 5:00 p.m. MDT. The contract period of performance is October 1, 2026 through December 1, 2026.
The amendment provides site visit contact information for seven representatives from various construction companies and includes thirteen questions and answers addressing key contract requirements. Critical responses clarify that the access road must be 14 feet wide with 3-inch compacted surface course and FSSS Section 204.11 compaction standards; potable water is available at the administrative site with 48 hours' notice required for hauling; only authorized vegetation removal is permitted, specifically trees between the lagoon and perimeter fence; the temporary wastewater system must be sized for approximately 1,770 gallons per day with contractor-submitted pumping calculations; ditch construction must follow plan dimensions without reduction for encountered rock; all cleared vegetation must be removed and disposed of off-site with no on-site burning permitted; the temporary tank area is approximately 18 feet by 58 feet along the service road access; contaminated material discovery requires immediate CO notification; winter access restrictions apply December through February with possible snow closures; wildlife breeding restrictions prohibit work March 1 through August 31; temporary tank rental is estimated at five weeks with additional weeks compensable based on actual conditions; and use of the existing sprinkler system for effluent disposal requires ADEQ Aquifer Protection Permit compliance and CO/COR approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LT26Q0094
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LT
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 8
09/02/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/12/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation 1240LT26Q0094, Palisades Lagoon Liner & Effluent Sprinkler System Replacement, Coronado National Forest, is amended as follows:
See Attachment 1 - Solicitation, SF-1442, 13. ADDITIONAL SOLICITATION REQUIREMENTS, change due date and time from September 9, 2026 at 5:00 p.m. to September 17, 2026 at 5:00 p.m.
MDT.
See Attachment 3 - Specifications, delete in their entirety and replace with the attached revised specifications.
See attached for Site Visit information and Questions/Answers.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
KELLIE J. SHAW
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 6CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LT26Q0094/0001
Another Amendment will be posted in the near future with additional questions and answers.
All other terms and conditions remain unchanged.
Period of Performance: 10/01/2026 to 12/01/2026
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment 01 Palisades Lagoon Liner & Effluent Sprinkler System Replacement
1240LT26Q0094
September 2, 2026
Solicitation 1240LT26Q0094, Palisades Lagoon Liner & Effluent Sprinkler System Replacement, Coronado National Forest, is amended as follows:
See below for Site Visit information and Questions/Answers.
Name Company Email Phone
Javier Arias FNR Service Javier@fnrservice.com 520-600-8216
Bernie Colonna FNR Service Bernie@fnrservice.com 520-979-2140
Trent Wilson ASR twilson@asr-cc.com 480-698-2591
Eric Ramirez Marsh Development eric@marsh-development.com 602-739-2886
Mike Semps Gunner Const. mike@gunner-contracting.net 623-687-5229
Tom Gilliam Blue World T.Gilliam@Bluwrld.com 928-553-6474
Robert Kramme Kramme Const. Kramme.robert@gmail.com 520-507-1305
Q1: What is the required access road width, and what compaction requirements apply?
A: The road typical section on Sheet C-11 shows a 14-foot maximum roadway width within a 22-foot clearing width. The typical section also shows a 3-inch compacted-in-place surface course.
Applicable roadway excavation and embankment are to be compacted in accordance with FSSS Section 204.11.
Reference: Plans Sheet C-11; FSSS 204.11; Section 31 22 00, 3.1(F).
Q2: What water source is available for construction, and how is its use coordinated?
A: Potable water is available at the administrative site. Provide the COR at least 48 hours' notice before hauling water from the Forest Service water supply. The contract does not identify a specific hydrant or connection point, so the actual withdrawal location will be coordinated with the COR/CO in the field.
Reference: Section 01 11 00, Existing Facilities, Item L(2)-(3).
Q3: May trees along the access road be removed if they interfere with the work?
A: Only trees and vegetation within the authorized clearing/work limits, or specifically required to be removed by the contract, may be removed. The specifications specifically require removal of trees between the lagoon and the chain-link perimeter fence and trimming of branches extending into the lagoon area. Any additional tree removal along the access road that is not
P a g e 3 | 6
1240LT26Q0094
September 2, 2026
P a g e 4 | 6 clearly within the approved clearing limits should be identified in the field and approved by the COR before removal.
Reference: Section 01 11 00, Selective Demolition; Section 31 11 00, 3.2.
Q4: What wastewater flow should be used to size the temporary collection and pumping system?
A: The specifications identify an estimated wastewater flow of approximately 1,770 gallons per day during the anticipated construction period. The temporary pumping system must have sufficient capacity for the applicable design flow. The Contractor is required to submit pumping calculations addressing pump capacity, static lift, friction losses, flow velocity, and pump curves.
A separate numerical peak-flow value is not identified in the reviewed contract language.
Reference: Section 01 51 20, Existing System Components and Temporary Pumping System requirements.
Q5: If rock is encountered while constructing the ditch along the lagoon liner, may the ditch dimensions be reduced?
A: No. Encountering rock does not by itself authorize reducing the plan dimensions, ditch section, or required elevations. The work should be constructed to the lines and grades shown on the plans. If rock prevents construction as designed, notify the COR/CO before changing the ditch geometry. Any proposed reduction or other deviation from the contract design requires Government approval before proceeding.
Reference: Contract plans - required lines and grades; applicable excavation requirements. No contract provision was identified that automatically permits reducing the ditch because rock is encountered.
Q6: Must all cleared vegetation be removed from the site?
A: Yes, for vegetation and debris required to be removed under the contract. Vegetation within 8 feet of the keyed-in lagoon perimeter edges is to be removed and disposed of. Clearing and grubbing also requires brush, branches, and trees to be chipped and disposed of off-site, and waste material is to be disposed of off Government property. Burning on site is not permitted.
Reference: Section 01 11 00, Selective Demolition; Section 31 11 00, 3.2.
Q7. Where will the temporary wastewater collection tanks be located?
A: The contract drawings identify the temporary wastewater collection use area along the left side of the service access road and require an approximately 18-foot by 58-foot clear area. The COR will delineate/confirm the final location in the field consistent with the contract drawings before installation.
1240LT26Q0094
September 2, 2026
Reference: Section 01 11 00, Temporary Wastewater Collection Use Area; Section 31 22 00, 1.1(B); contract drawings.
Q8: What is the procedure if suspect waste or contaminated material is encountered beneath the existing lagoon liner?
A: Stop work in the affected area, do not disturb the suspect material, and immediately notify the CO. The CO will determine whether testing is required. If the material is determined to be contaminated, the specifications state that it will be properly removed and disposed of by the contractor through a modification. The Contractor should not treat suspect contaminated material as ordinary excavation or dispose of it without CO direction.
Reference: Section 01 11 00, Maintenance Improvement Work - unacceptable/contaminated soil.
Q9. How should excess excavation generated while preparing the temporary wastewater tank area be handled?
A: Use suitable excavated material as backfill where required. Excavated material that is not required or is unsuitable for backfill is to be used on site or removed to a waste area as directed by the COR. Excess material should not be stockpiled where it interferes with the temporary wastewater collection system, drainage, access, or other contract work.
Reference: Section 31 22 00, 3.1(C), and temporary wastewater collection use-area requirements.
Q10. How should the existing leaking pumphouse roof be addressed?
A: Roof replacement or repair is not identified as part of the lagoon/effluent sprinkler contract scope reviewed.
Reference: Section 01 11 00 project scope; Plans C-03/C-08.
Q11. Are there seasonal restrictions?
A: The specifications do identify winter access conditions, including possible snow-related closures and chain/4WD requirements from December through February. There is a wildlife breeding restriction timeframe of March 1 through August 31. Work shall not be completed during this timeframe. If other environmental concerns are encountered during construction, stop or avoid work in the affected area and coordinate with the COR before proceeding.
Reference: Section 01 11 00, Project Location.
P a g e 5 | 6
1240LT26Q0094
September 2, 2026
P a g e 6 | 6
Q12: The bid schedule includes five weeks of temporary effluent pumping/tank rental. What happens if the temporary system is required longer than five weeks?
A: The temporary wastewater collection and pumping system must remain operational for the duration required to perform the contract work and maintain wastewater service. The bid schedule pays for temporary tank and pump system rental by the week. Five weeks appears to be the estimated bid quantity, not a contractual authorization to stop temporary service after five weeks. If additional weeks are required, payment responsibility should be administered under the contract based on the actual quantity and the reason for the additional duration. Time attributable solely to the Contractor should not automatically be treated the same as additional time caused by a Government-directed change or other compensable condition.
Reference: Section 01 51 20; Bid Item 015120(03), Temporary Tank & Pump System Rental - Week.
Q13: Is the Government opposed to temporarily using the existing sprinkler system to dispose of effluent during construction?
A: The Government is not categorically opposed to the Contractor proposing use of the existing sprinkler system; however, it may only be used if the proposed operation complies with the applicable ADEQ Aquifer Protection Permit and is approved by the COR/CO. Effluent application must remain within the permitted daily/operational limits. The Contractor should submit the proposed pumping and disposal method, anticipated daily volume, and operating controls before use.
Reference: Section 01 51 20, Existing Effluent Sprinkler Disposal Area; Section 01 11 00, Selective Demolition; applicable ADEQ permit requirements.
| C05 Amendment 01.pdf |
| Amendment Q & A |