Amendment 2_J4 - East Leesburg Pit Expansion.docx
DOCX document 558 KB Posted
- Attached to
- Williams and Deep Creek Surfacing Federal contract opportunity
- Solicitation number
- 1240LT25R0003
- Issued by
- Department of Agriculture Forest Service
About this file
This document appears to be an amendment related to the East Leesburg Pit boundary expansion for a federal contract opportunity with the Department of Agriculture Forest Service. The amendment indicates that the East Leesburg Pit has expanded its boundary, with an estimated volume sufficient to generate material for the entire contract, including base and option items. The document references Figure 1 showing the pit expansion and notes that survey boundary limit points will be provided after contract award. The specific solicitation is numbered 1240LT25R0003 for the Williams and Deep Creek Surfacing project, though limited details are provided about the precise scope of work beyond the pit expansion information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 3_SF30.pdf | ||
| Amendment 3_Section K updated NAICS and Size Standard.pdf | ||
| Q and A.docx | DOCX document | |
| Amendment 2_Aggregate Data Sheet 2008.pdf | ||
| Amendment 2_J1 - WilliamsDeep Plans.pdf | ||
| Amendment 2_SF30.pdf | ||
| Amendment 2_C - WilliamsDeep - SOW.docx | DOCX document | |
| Amendment 2_ELP-Expanded Boundary.pdf | ||
| Amendment 2_ELP-Sample Data 1988.pdf | ||
| Attachment 2_B - WilliamsDeep - SOI.docx | DOCX document | |
| Amendment 1.pdf | ||
| J.4 Attachment_WilliamsDeep - Photos.pdf | ||
| 1240LT25R0003.pdf | ||
| J.2 Attachement_Williams and Deep Specifications.pdf | ||
| J.5 Attachment_ Bridge_Overload_Permit_Form.pdf | ||
| J.3 Attachment_Wage Determination.pdf | ||
| J.1 Attachment_ WilliamsDeep Plans.pdf | ||
| J.6 Attachment_WilliamsPreSolSignIn.pdf | ||
| J.7 Attachment_Determination of Responsibility.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J4 – East Leesburg Pit boundary expansion
Figure 1 - East Leesburg Pit Expansion East Leesburg Pit has had its boundary expanded and it is estimated that it should have enough volume to generate enough material for the entire contract (base plus option items).
Points shall be provided to survey boundary limits after award.
image1.jpeg
File details come from the government source that posted it. Updated .