Amendment 2_J4 - East Leesburg Pit Expansion.docx

DOCX document 558 KB Posted

Attached to
Williams and Deep Creek Surfacing
Solicitation number
1240LT25R0003
Issued by

About this file

This document appears to be an amendment related to the East Leesburg Pit boundary expansion for a federal contract opportunity with the Department of Agriculture Forest Service. The amendment indicates that the East Leesburg Pit has expanded its boundary, with an estimated volume sufficient to generate material for the entire contract, including base and option items. The document references Figure 1 showing the pit expansion and notes that survey boundary limit points will be provided after contract award. The specific solicitation is numbered 1240LT25R0003 for the Williams and Deep Creek Surfacing project, though limited details are provided about the precise scope of work beyond the pit expansion information.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J4 – East Leesburg Pit boundary expansion

Figure 1 - East Leesburg Pit Expansion East Leesburg Pit has had its boundary expanded and it is estimated that it should have enough volume to generate enough material for the entire contract (base plus option items).

Points shall be provided to survey boundary limits after award.

image1.jpeg

File details come from the government source that posted it. Updated .