J.3 - Drawings - Updated Final.pdf
PDF 17 MB Posted
- Attached to
- Carolyn Creek Trail Bridge Project (GAOA)
- Solicitation number
- 1240LT25Q0003
- Issued by
-
Department of Agriculture Forest Service
About this file
These are detailed engineering drawings and specifications for the Carolyn Creek Trail Bridge Replacement project in the Ruby Mountains District of Humboldt-Toiyabe National Forest, Nevada. The drawings include a full set of engineering plans dated April 21, 2023, with specifications for a 27-foot long, 6-foot wide pedestrian trail bridge.
The drawings detail a glulam deck panel bridge with steel cable railing system, including specific requirements for materials and construction methods. Key specifications include: Douglas Fir wet condition lumber for deck panels, stainless steel cable railings, hot-dipped galvanized hardware, and weathering steel posts. The bridge must support a 90 psf pedestrian load and 190 psf ground snow load. The existing stacked rock abutments will be reused, with new timber sills and connection details provided. The bridge location is accessed via a hiking trail with no vehicle access, requiring all materials to be transported without vehicles. The drawings include site plans, elevation views, connection details, and photos of the existing bridge to be replaced.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 1240LT25Q0003 - Updated.pdf | ||
| SF30 1240LT25Q003 0001.pdf | ||
| J.3 - Drawings - Updated.pdf | ||
| Carolyn Creek Project - Contractor Questions and Answers.pdf | ||
| J.2 - WD NV20240015.pdf | ||
| J.4 - Contractor Experience Questionaire.docx | DOCX document | |
| J.5 - Contractor Questions and Answers Template.doc | DOC document | |
| J.3 - Drawings.pdf | ||
| J.1 - Specifications.docx | DOCX document | |
| RFQ 1240LT25Q0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOSHUA NICHOLES
Digitally signed by JOSHUA
NICHOLES
Date: 2023.04.28 10:25:06 -07'00'
KEVIN WILMOT Digitally signed by KEVIN WILMOT Date: 2023.04.25 07:19:17 -07'00'
CHAD PORTER Digitally signed by CHAD PORTER Date: 2023.04.24 17:05:39 -06'00'
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /24
:5
4 D
AK
OT
AK
RI
ST
C :\U
SE
RS
\D
AK
OT
AK
RI
ST
\B
OX
\H T
EN
GI
NE
ER
IN
G
AC
TI
VE
P
RO
JE
CT
S\
RM
MC
J\2
2.R
MM
CJ
.G
AO
AC
AR
OL
YN
BR
ID
GE
\D
ES
IG
NW
OR
K\
CD
_D
ES
IG
N2
2.D W
G;
R4 Intermountain Region
Carolyn Creek Trail Bridge
HUMBOLDT-TOIYABE
NATIONAL FOREST
RUBY MOUNTAINS DISTRICT
GENERAL NOTES
C.PORTER
C.DEDMORE
C.PORTER
G-081
WEARING SURFACE TREATMENT 08/02/24
I F---3 10 20 ,-I ------<I Feet
SITE PLAN
FINISHED
MAXIMUM
ABUTMENT 1 27.0v ABUTMENT 2
STA. 0+22.40;'
:STA. 0+49.21'
ELEV. 9303.51' ELEV. 9304.64'
3.50
\ I rsl
NISHED
URFACE
TRAIL SURFACE
�� 9" STEP UP ALLOWED \ I
I\ j
:h, /� \/ ::c
�J� � / ---'-,f-'- '--EXISTING
' i--5.00- / g GROUND
0+20 0+30 0+40 0+50 O+
*EXISTING STACKED ROCK ABUTMENTS.
**IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY EXISTING ABUTMENT ELEVATIONS. CHANGES
TO THE ELEVATIONS SHALL BE COORDINATED WITH THE COR.
PROFILE
NOTES:
1. CONTRACTOR SHALL SUBMIT AN ERECTION/REMOVAL PLAN FOR TRANSPORTING
EQUIPMENT AND MATERIALS, ERECTING NEW BRIDGE, AND REMOVING EXISTING
BRIDGE, FOR REVIEW AND APPROVAL BY THE CO 30 DAYS PRIOR TO CONSTRUCTION. IF
HELICOPTER IS USED FOR TRANSPORT, INSTALLATION AND REMOVAL WORK, BRIDGE
ERECTION/REMOVAL PLAN SHALL CLEARLY SPECIFY NUMBER OF FLIGHTS AND FLIGHT
DAYS. CONTRACTOR SHALL MINIMIZE NUMBER OF FLIGHTS AND NOT EXCEED THE
ALLOWED FLIGHTS AND FLIGHT DAYS AS DESCRIBED IN THE MINIMUM REQUIREMENTS
ANALYSIS (MRA) THAT IS INCLUDED IN THE SOLICITATION.
2. EXISTING BRIDGE SHALL BE REMOVED FROM THE HUMBOLDT-TOIYABE N.F. AND
DISPOSED OF. EXISTING BRIDGE IS 27'x6' NAIL-LAMINATED STRUCTURE WITH A TIMBER
RAILING AND (12)2"X12"X6' TIMBER SILL BOARDS.
3. EXISTING ROCK/CONCRETE ABUTMENTS WILL REMAIN IN PLACE AND BE USED AS
ABUTMENTS FOR NEW BRIDGE.
United States Department of Agriculture
Forest Service
R4 lntermountain Region
NO. REVISION/ ISSUE
PROJECT NAME
Carolyn Creek Trail Bridge
DATE
HUMBOLDT-TOIYABE
NATIONAL FOREST
RUBY MOUNTAINS DISTRICT
DRA\/\INGTITLE
SITE PLAN AND PROFILE
DATE
ARCHIVE NO.
04/21/2023
DESIGNER DRAWNG SHEET NO.
C.PORTER
DRAWN S-02C.DEDMORE
CHECKED
C.PORTER
PROJECT NO. SHEET 3 OF 8
G-081
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /24
:5
4 D
AK
OT
AK
RI
ST
C :\U
SE
RS
\D
AK
OT
AK
RI
ST
\B
OX
\H T
EN
GI
NE
ER
IN
G
AC
TI
VE
P
RO
JE
CT
S\
RM
MC
J\2
2.R
MM
CJ
.G
AO
AC
AR
OL
YN
BR
ID
GE
\D
ES
IG
NW
OR
K\
CD
_D
ES
IG
N2
2.D W
G;
R4 Intermountain Region
Carolyn Creek Trail Bridge
HUMBOLDT-TOIYABE
NATIONAL FOREST
RUBY MOUNTAINS DISTRICT
DETAILS: DECK PANEL
AND ABUTMENT
CONNECTIONS
C.PORTER
C.DEDMORE
C.PORTER
G-081
SILL DETAIL. SILL LENGTH 6'
CORRECTION: 6 GLULAM PANELS 08/02/24
08/02/24
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /24
:5
4 D
AK
OT
AK
RI
ST
C :\U
SE
RS
\D
AK
OT
AK
RI
ST
\B
OX
\H T
EN
GI
NE
ER
IN
G
AC
TI
VE
P
RO
JE
CT
S\
RM
MC
J\2
2.R
MM
CJ
.G
AO
AC
AR
OL
YN
BR
ID
GE
\D
ES
IG
NW
OR
K\
CD
_D
ES
IG
N2
2.D W
G;
R4 Intermountain Region
Carolyn Creek Trail Bridge
HUMBOLDT-TOIYABE
NATIONAL FOREST
RUBY MOUNTAINS DISTRICT
DETAILS: DECK PANEL
AND ABUTMENT
CONNECTIONS
C.PORTER
C.DEDMORE
C.PORTER
G-081
SILL DETAIL. SILL LENGTH 6'
CORRECTION: 6 GLULAM PANELS 08/02/24
08/02/24
File details come from the government source that posted it. Updated .