This is a set of engineering drawings and specifications for the Carolyn Creek Trail Bridge Replacement project in the Ruby Mountains District of the Humboldt-Toiyabe National Forest in Elko County, Nevada. The drawings detail the construction of a 27-foot long, 6-foot wide pedestrian trail bridge with a glulam deck panel system and steel cable railing.

The technical specifications include detailed requirements for the bridge components, including glulam deck panels made from Douglas Fir with a minimum of 6 laminations per panel, stainless steel cables for the railing system, weathering steel posts and rails, and preservative treatment requirements. The existing stacked rock abutments will be reused for the new bridge. The drawings provide comprehensive details for the deck panel construction, abutment connections, railing system, and hardware specifications. The project location is accessed via a 1.4-mile hike on the Island Lake Trail from the Lamoille Canyon Road parking lot, with no vehicle access to the construction site. The drawings are dated April 21, 2023 and include site plans, elevations, cross-sections, connection details, and photos of the existing bridge to be replaced.

View the file

Other files

File Type Posted
RFQ 1240LT25Q0003 - Updated.pdf PDF
SF30 1240LT25Q003 0001.pdf PDF
Carolyn Creek Project - Contractor Questions and Answers.pdf PDF
J.3 - Drawings - Updated Final.pdf PDF
J.2 - WD NV20240015.pdf PDF
J.4 - Contractor Experience Questionaire.docx DOCX document
J.5 - Contractor Questions and Answers Template.doc DOC document
J.3 - Drawings.pdf PDF
J.1 - Specifications.docx DOCX document
RFQ 1240LT25Q0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOSHUA NICHOLES

Digitally signed by JOSHUA

NICHOLES

Date: 2023.04.28 10:25:06 -07'00'

KEVIN WILMOT Digitally signed by KEVIN WILMOT Date: 2023.04.25 07:19:17 -07'00'

CHAD PORTER Digitally signed by CHAD PORTER Date: 2023.04.24 17:05:39 -06'00'

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

8/5 /24

:5

4 D

AK

OT

AK

RI

ST

C :\U

SE

RS

\D

AK

OT

AK

RI

ST

\B

OX

\H T

EN

GI

NE

ER

IN

G

AC

TI

VE

P

RO

JE

CT

S\

RM

MC

J\2

2.R

MM

CJ

.G

AO

AC

AR

OL

YN

BR

ID

GE

\D

ES

IG

NW

OR

K\

CD

_D

ES

IG

N2

2.D W

G;

R4 Intermountain Region

Carolyn Creek Trail Bridge

HUMBOLDT-TOIYABE

NATIONAL FOREST

RUBY MOUNTAINS DISTRICT

GENERAL NOTES

C.PORTER

C.DEDMORE

C.PORTER

G-081

WEARING SURFACE TREATMENT 08/02/24

I F---3 10 20 ,-I ------<I Feet

SITE PLAN

FINISHED

MAXIMUM

ABUTMENT 1 27.0v ABUTMENT 2

STA. 0+22.40;'

:STA. 0+49.21'

ELEV. 9303.51' ELEV. 9304.64'

3.50

\ I rsl

NISHED

URFACE

TRAIL SURFACE

�� 9" STEP UP ALLOWED \ I

I\ j

:h, /� \/ ::c

�J� � / ---'-,f-'- '--EXISTING

' i--5.00- / g GROUND

0+20 0+30 0+40 0+50 O+

*EXISTING STACKED ROCK ABUTMENTS.

**IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY EXISTING ABUTMENT ELEVATIONS. CHANGES

TO THE ELEVATIONS SHALL BE COORDINATED WITH THE COR.

PROFILE

NOTES:

1. CONTRACTOR SHALL SUBMIT AN ERECTION/REMOVAL PLAN FOR TRANSPORTING

EQUIPMENT AND MATERIALS, ERECTING NEW BRIDGE, AND REMOVING EXISTING

BRIDGE, FOR REVIEW AND APPROVAL BY THE CO 30 DAYS PRIOR TO CONSTRUCTION. IF

HELICOPTER IS USED FOR TRANSPORT, INSTALLATION AND REMOVAL WORK, BRIDGE

ERECTION/REMOVAL PLAN SHALL CLEARLY SPECIFY NUMBER OF FLIGHTS AND FLIGHT

DAYS. CONTRACTOR SHALL MINIMIZE NUMBER OF FLIGHTS AND NOT EXCEED THE

ALLOWED FLIGHTS AND FLIGHT DAYS AS DESCRIBED IN THE MINIMUM REQUIREMENTS

ANALYSIS (MRA) THAT IS INCLUDED IN THE SOLICITATION.

2. EXISTING BRIDGE SHALL BE REMOVED FROM THE HUMBOLDT-TOIYABE N.F. AND

DISPOSED OF. EXISTING BRIDGE IS 27'x6' NAIL-LAMINATED STRUCTURE WITH A TIMBER

RAILING AND (12)2"X12"X6' TIMBER SILL BOARDS.

3. EXISTING ROCK/CONCRETE ABUTMENTS WILL REMAIN IN PLACE AND BE USED AS

ABUTMENTS FOR NEW BRIDGE.

United States Department of Agriculture

Forest Service

R4 lntermountain Region

NO. REVISION/ ISSUE

PROJECT NAME

Carolyn Creek Trail Bridge

DATE

HUMBOLDT-TOIYABE

NATIONAL FOREST

RUBY MOUNTAINS DISTRICT

DRA\/\INGTITLE

SITE PLAN AND PROFILE

DATE

ARCHIVE NO.

04/21/2023

DESIGNER DRAWNG SHEET NO.

C.PORTER

DRAWN S-02C.DEDMORE

CHECKED

C.PORTER

PROJECT NO. SHEET 3 OF 8

G-081

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

8/5 /24

:5

4 D

AK

OT

AK

RI

ST

C :\U

SE

RS

\D

AK

OT

AK

RI

ST

\B

OX

\H T

EN

GI

NE

ER

IN

G

AC

TI

VE

P

RO

JE

CT

S\

RM

MC

J\2

2.R

MM

CJ

.G

AO

AC

AR

OL

YN

BR

ID

GE

\D

ES

IG

NW

OR

K\

CD

_D

ES

IG

N2

2.D W

G;

R4 Intermountain Region

Carolyn Creek Trail Bridge

HUMBOLDT-TOIYABE

NATIONAL FOREST

RUBY MOUNTAINS DISTRICT

DETAILS: DECK PANEL

AND ABUTMENT

CONNECTIONS

C.PORTER

C.DEDMORE

C.PORTER

G-081

SILL DETAIL. SILL LENGTH 6'

CORRECTION: 6 GLULAM PANELS 08/02/24

08/02/24

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

8/5 /24

:5

4 D

AK

OT

AK

RI

ST

C :\U

SE

RS

\D

AK

OT

AK

RI

ST

\B

OX

\H T

EN

GI

NE

ER

IN

G

AC

TI

VE

P

RO

JE

CT

S\

RM

MC

J\2

2.R

MM

CJ

.G

AO

AC

AR

OL

YN

BR

ID

GE

\D

ES

IG

NW

OR

K\

CD

_D

ES

IG

N2

2.D W

G;

R4 Intermountain Region

Carolyn Creek Trail Bridge

HUMBOLDT-TOIYABE

NATIONAL FOREST

RUBY MOUNTAINS DISTRICT

DETAILS: DECK PANEL

AND ABUTMENT

CONNECTIONS

C.PORTER

C.DEDMORE

C.PORTER

G-081

SILL DETAIL. SILL LENGTH 6'

CORRECTION: 6 GLULAM PANELS 08/02/24