This document is an amendment to a solicitation for the GAOA Escalante Ranger District Housing Upgrade project. The key details are:

The amendment attaches the site visit questions and answers, an estimate from Garkane Energy on electrical work, and corrects the bid bond guarantee requirement. The last date to submit questions is September 4, 2024, and all proposals are due by September 9, 2024 at 5:00 PM EST. The contract has a period of performance from September 30, 2024 to September 29, 2025. The project is a 100% Small Business Set-Aside with an estimated magnitude between $500,000 and $1,000,000. The solicitation will be evaluated using the Tradeoff Process, allowing for consideration of both price and non-price factors. The contracting agency is the USDA Forest Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240LT24R0061

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40LT

OGDEN UT 84401-2310

324 25TH ST

USDA-FS CSA INTERMOUNTAIN 8

GAOA08/19/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/19/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of amendment 0001 is as follows:

1. Attach the site visit questions, answers, and sign-in sheet.

2. Attach estimate from Garkane energy on electrical work.

3. Correct block 13b of the SF 1442 to state that a bid bond guarantee IS REQUIRED.

4. Last date to submit questions is Sep 4, 2024.

The closing date remains unchanged. All proposals shall be emailed to brenda.simmons@usda.com no later than Sep 9, 2024, at 5:00 PM EST. Late proposals will not be accepted.

Period of Performance: 09/30/2024 to 09/29/2025

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

LONNIE D. ROOT

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

GAOA Escalante 8/27/24 12:00

SITE VISIT Q&A SHEET

QUESTION ANSWER

Can the work be completed during the winter months?

Yes, we don’t have any desire to delay the start of this project. Some things will have to be completed prior to hard freeze, but we see no issues with working throughout the winter

Is there a bid bond?

Required Amendment to follow

Are there going to be people living in the houses while the work is completed?

The Bunkhouse will be empty during construction (current tenants moving out next month sometime).

Dwelling units (both units) will have tenants living upstairs. Basements will be empty of tenants

Where can we put our staging area?

On the south end of the property between the fence and the road next to the power pole. There is limited room on the north end of the property. Can discuss other locations if needed.

Is the funding secured? Are we planning to have awarded by end of fiscal year?

Yes, funding is secured, and we are also planning to have awarded by the end of the fiscal year.

Do we have to replaster all the walls in the Bunkhouse?

Pg 9 Note 10- No, any wall space that does not receive any damage during demo will not have to be replastered. However, all walls and ceilings must be prepped and painted.

What material would you like us to use on the exterior when patching holes in the wall from door and window work?

Pg 9 Note 3- Match existing as best as possible. This is a historic building, so it’s important it looks the same/similar.

Are there any gas lines or sprinkler systems at the Lower and Upper Housing sites?

Neither site has gas lines. The Lower Housing does have sprinkler systems. I only have old drawing of utility locations, so drawings are only semi-accurate.

What size of window needs to be installed?

Pg 26 on plans shows a 4040 opening. Goal is to add another means of egress for the tenants in the basements

Are hookup fees contractors’ responsibility or governments?

Asked me to share 4-month-old estimate from Garkane energy on electrical work for new transformers at site

See spec 12500- Fee’s are Contractors responsibility. Contractor is to be our agent when dealing with utility companies

Estimate is approximate and subject to change.

Amendment to follow

Would we consider using modular tiny homes instead of stick built?

We considered modular homes and decided to go another way. You are welcome to include this as an alternative option in your proposals. We would have to talk to other Forest Service employees before we decide to accept or not.

Can we share the sign-up sheet?

Will be posted via amendment.

Are we awarding based on best value or lowest bid?

See Section M in Solicitation- Proposals will be evaluated using the Tradeoff Process. This process permits tradeoffs among price and non-price factors which allows the Government to accept other than the lowest priced proposal.

Will there be new electrical transformers needed at the warehouse site?

Sheet 7 Note 4- No, our electrical engineer believes we have enough capacity at this site;

however, they did NOT have work capacity to design the electrical hook up. This will need to be completed prior to any work being done at the warehouse site.

Where are the locations of tiny homes for optional bid items 3 & 4? Different locations will result in different amounts of earthwork.

We are very flexible on exact locations of the tiny homes. The general location is shown on the drawings.

Can the warehouse be a potential staging location?

Yes

When is our last chance to submit more questions?

September 4th Amendment to follow

Is there a posted estimate range?

C.3 in Solicitation- Magnitude of Construction Project is between $500,000 and $1,000,000

24-173

Name:

Address:

Phone:

Email:

District

Service Location

Permanent

Indeterminate

Temporary

Seasonal

Project Description:

ITEM DESCRIPTION Qty Labor Cost Material Cost Total

1 $8,606.00

$1,301.41

A5.1 SINGLE DEADEND 1 $266.71 $88.70 $355.42

H1.1 GROUNDING ASSEMBLY - GROUND ROD TYPE 1 $92.46 $56.99 $149.45

POLE 40-4 POLE, 40' CLASS 4 1 $643.67 $1,989.74 $2,633.41

UA1 1 PH 15 KV CABLE TERMINAL POLE 1 $1,201.99 $886.77 $2,088.76

UG7B 1 PH PAD MT TRANSFORMER LOOP FEED 2 $711.24 $0.00 $711.24

UJ2-6 SECONDARY CONNECTOR BLOCK 6 $266.71 $106.00 $372.71

UM1-7NC SECTIONALIZER/TRANSFORMER GROUND SLEEVE 2 $711.24 $1,579.47 $2,290.71

UM48-1 GROUND ASSEMBLY FOR PAD MOUNT TRANS. 2 $177.81 $76.65 $254.46

UM6-1 LOADBREAK ELBOW, 15 KV 3 $266.71 $181.34 $448.05

UM6-10 15 KV DEADEND RECEPTACLE 2 $35.56 $83.49 $119.05

UM6-15 15 KV PARKING STAND 2 $35.56 $124.61 $160.17

UM6-34 15 KV ELBOW SURGE ARRESTER 1 $88.90 $128.18 $217.09

WIRE-1/0URD15EPR WIRE- 1/0 15 KV PRIMARY EPR DBC 262 $762.42 $1,283.80 $2,046.22

WIRE-4/0URDTPLX WIRE- 4/0 URD TRIPLEX 70 $199.15 $271.04 $470.19

WIRE-4ACSR-7/1 WIRE-4ACSR-7/1 134 $119.13 $54.54 $173.67

ZZ200 METER, 1 PH SELF CONTAINED FORM 1S/2S 1 $88.90 $0.00 $88.90

RETIRED UNITS

POLE 30-6 POLE, 30' CLASS 6 1 $202.70 $0.00 $202.70

UM5 SECONDARY CABLE TERMINAL POLE 1 $88.90 $0.00 $88.90

WIRE-4/0TPLXACSR WIRE - 4/0 TRIPLEX ACSR 67 $142.96 $0.00 $142.96

$6,102.75 $6,911.30 $13,014.05

Remarks: The consumer is responsible for all trenching and back filling. $22,921.46

The consumer must pay all of the Garkane Energy's aid in construction 390.00$ costs and meet the requirements of Garkane Energy and any applicable state and local codes and regulations before construction $22,531.46 and connection is made.

Date: 2-May-24

34.226

TRANSFORMER FEES 2 25 KVA PAD MOUNT

ESTIMATED PROJECT COST:

This estimate is based on today's material and labor costs and are subject to change. Cost estimates are valid for 30 days. It is the consumer's responsibility to contact Garkane after 30 days for an updated estimate. If the job is not progressing after 6 months from the date of the original estimate, the consumer will need to reapply.

500.00$

INSTALL 200 AMP METER

Other Credit

Fees Paid

Estimated By:

$23,031.46

BEGINS.

CONSTRUCTION

AMOUNT DUE BEFOREinspections:

Kaden Pollock

Toll-Free (888)644-5026

ENGINEERING FEES

435-704-1289

KEELEY.NELSON@USDA.GOV

HATCH Send Payment To:

UTAH WORK ORDER#

Security Deposit

Investment Fee

Contact your local building inspector for applicable codes and

Subtotal

200-Amp Plant

Subtotal

Labor & Material Subtotal

30 DAY ESTIMATE

1802 South Hwy 89A

Kanab, Utah 84741

Phone: (435) 644-5026

820 SOUTH MAIN

DIXIE NATIONAL FOREST

CEDAR CITY UTAH 84721

mailto:KEELEY.NELSON@USDA.GOV

24-172

Address:

Phone:

Email:

District

Service Location

Permanent

Indeterminate

Temporary

Seasonal

Project Description:

ITEM DESCRIPTION Qty Labor Cost Material Cost Total

1 $0.00

$390.00

WIRE-4/0URDTPLX WIRE- 4/0 URD TRIPLEX 150 $426.74 $580.80 $1,007.54

ZZ200 METER, 1 PH SELF CONTAINED FORM 1S/2S 1 $88.90 $0.00 $88.90

$515.65 $580.80 $1,096.45

Remarks: The consumer is responsible for all trenching and back filling. $1,486.45

The consumer must pay all of the Garkane Energy's aid in construction 390.00$ costs and meet the requirements of Garkane Energy and any applicable state and local codes and regulations before construction $1,096.45 and connection is made.

Date: 2-May-24

2.9

TRANSFORMER & METERING FEE (UNDERGROUND)

ESTIMATED PROJECT COST:

This estimate is based on today's material and labor costs and are subject to change. Cost estimates are valid for 30 days. It is the consumer's responsibility to contact Garkane after 30 days for an updated estimate. If the job is not progressing after 6 months from the date of the original estimate, the consumer will need to reapply.

500.00$

INSTALL 200 AMP METER

Other Credit

Fees Paid

Estimated By:

$1,596.45

BEGINS.

CONSTRUCTION

AMOUNT DUE BEFOREinspections:

Kaden Pollock

Toll-Free (888)644-5026

ENGINEERING FEES

435-704-1289

KEELEY.NELSON@USDA.GOV

HATCH Send Payment To:

UTAH WORK ORDER#

Security Deposit

Investment Fee

Contact your local building inspector for applicable codes and

Subtotal

200-Amp Plant

Subtotal

Labor & Material Subtotal

30 DAY ESTIMATE

1802 South Hwy 89A

Kanab, Utah 84741

Phone: (435) 644-5026

820 NORTH MAIN ST

DIXIE NATIONAL FOREST

CEDAR CITY UTAH 84721

24-171

Address:

Phone:

Email:

District

Service Location

Permanent

Indeterminate

Temporary

Seasonal

Project Description:

ITEM DESCRIPTION Qty Labor Cost Material Cost Total

1 $0.00

$390.00

WIRE-4/0URDTPLX WIRE- 4/0 URD TRIPLEX 130 $369.84 $503.36 $873.20

ZZ200 METER, 1 PH SELF CONTAINED FORM 1S/2S 1 $88.90 $0.00 $88.90

$458.75 $503.36 $962.11

Remarks: The consumer is responsible for all trenching and back filling. $1,352.11

The consumer must pay all of the Garkane Energy's aid in construction 390.00$ costs and meet the requirements of Garkane Energy and any applicable state and local codes and regulations before construction $962.11 and connection is made.

Date: 2-May-24

2.58

TRANSFORMER & METERING FEE (UNDERGROUND)

ESTIMATED PROJECT COST:

This estimate is based on today's material and labor costs and are subject to change. Cost estimates are valid for 30 days. It is the consumer's responsibility to contact Garkane after 30 days for an updated estimate. If the job is not progressing after 6 months from the date of the original estimate, the consumer will need to reapply.

500.00$

INSTALL 200 AMP METER

Other Credit

Fees Paid

Estimated By:

$1,462.11

BEGINS.

CONSTRUCTION

AMOUNT DUE BEFOREinspections:

Kaden Pollock

Toll-Free (888)644-5026

ENGINEERING FEES

435-704-1289

KEELEY.NELSON@USDA.GOV

HATCH Send Payment To:

UTAH WORK ORDER#

Security Deposit

Investment Fee

Contact your local building inspector for applicable codes and

Subtotal

200-Amp Plant

Subtotal

Labor & Material Subtotal

30 DAY ESTIMATE

1802 South Hwy 89A

Kanab, Utah 84741

Phone: (435) 644-5026

820 NORTH MAIN ST.

DIXIE NATIONAL FOREST

CEDAR CITY UTAH 84721

SITE VISIT QA SHEET
Garkane-estimates
ESCALANTE;DIXIENATIONALFORESTLAUNDRY;24173;MAY24 (003).pdf
ESCALANTE;DIXIENATIONALFORESTTINYHOME2;24172;MAY24.pdf
ESCALANTE;DIXIENATIONALFORESTTINYHOME1;24171;MAY24.pdf

GAOA-sign in sheet

File details come from the government source that posted it. Updated .