A02_PSICC-MonWC-DWG100.pdf

PDF 4 MB Posted

Attached to
Monument Fire Center Telecom Upgrade Federal contract opportunity
Solicitation number
1240LT24R0039
Issued by
Department of Agriculture Forest Service

About this file

This document is a set of construction plans and specifications for the Monument Work Center Telecom Upgrade project for the United States Department of Agriculture Forest Service. The project scope includes removing, replacing, and relocating copper and fiber optic cabling and associated equipment, relocating communication equipment to a new telecommunications room, removing and installing new electrical panels and conductors, and trenching, backfilling, and installing underground conduit and conductors. The work also involves coordinating with telecommunication and electric providers, and performing construction quality control. The specifications and plans provide detailed requirements for the telecom upgrade, including drawings, schedules, and site details. This document does not contain pricing terms, set-asides, award dates, or information on incumbents.

View the file

Other files for this federal contract opportunity

Other files attached to Monument Fire Center Telecom Upgrade, newest first.
File Type Posted
MFC Telecomm_Site Visit Sign in.pdf PDF
0.1 1240LT24R0039 - Amendment 001 Questions and Answers.pdf PDF
A01_PSICC-MonWC-SOI.pdf PDF
A03_PSICC-MonWC-Specs100.pdf PDF
0. 1240LT24R0039 - Solicitation.pdf PDF
A04_Davis-Bacon Act WD - CO20240022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

ROCKY MOUNTAIN REGION

MONUMENT WORK CENTER

TELECOM UPGRADE

PIKE AND SAN ISABEL NATIONAL FORESTS

CIMARRON AND COMANCHE NATIONAL GRASSLANDS

PIKES PEAK RANGER DISTRICT

EL PASO COUNTY,

COLORADO

PROJECT LOCATION

PROJECT

LOCATION

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

DATENO.

REVISION / ISSUE

MONUMENT WORK

CENTER TELECOM

UPGRADE

PIKE AND SAN ISABEL

NATIONAL FORESTS

CIMARRON AND COMANCHE

NATIONAL GRASSLANDS

PIKES PEAK RANGER DISTRICT

MONUMENT WORK CENTER

R2

ROCKY MOUNTAIN REGION

02/2020 10

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

TITLE SHEET

AND INDEX

T.MICHAEL

L.CARROLL

T1.1

PROJECT ADDRESS

MONUMENT, COLORADO 80132

INDEX

SHEET SHEET

SUB

TITLE OF SHEET

1. T1.1 TITLE SHEET AND INDEX GENERAL

2. G1.1 SITE LEGEND, DETAILS, AND GENERAL

ABBREVIATIONS

3. U1.0 OVERALL SITE PLAN SITE

4. U1.1 ENLARGED SITE PLAN A SITE

5. U1.2 ENLARGED SITE PLAN B SITE

6. U2.1 CLASSROOM, BUNKHOUSE A AND SITE

PULL BOX SCHEDULES

7. U3.1 PHOTOGRAPHS SITE

8. M1.1 MECHANICAL PLAN, LEGEND, AND CLASSROOM

EQUIPMENT SCHEDULE

9. E1.1 ELECTRICAL AND TELECOMMUNICATION CLASSROOM

PLAN, LEGEND, AND PHOTOGRAPHS

10. E2.1 ELECTRICAL AND TELECOMMUNICATION BUNKHOUSE A

PLAN

BUILDING/LOCATION

AutoCAD SHX Text 2/3/20 08:53 TCMICHAEL C:\USERS\TCMICHAEL\BOX\CDI\PKSI\SITES\MONUMENTWC\2017 SITE TELECOM\DWGS\T1-0-T1-1_TITLE-SHT.DWG; 08:53 TCMICHAEL C:\USERS\TCMICHAEL\BOX\CDI\PKSI\SITES\MONUMENTWC\2017 SITE TELECOM\DWGS\T1-0-T1-1_TITLE-SHT.DWG;08:53 TCMICHAEL C:\USERS\TCMICHAEL\BOX\CDI\PKSI\SITES\MONUMENTWC\2017 SITE TELECOM\DWGS\T1-0-T1-1_TITLE-SHT.DWG; TCMICHAEL C:\USERS\TCMICHAEL\BOX\CDI\PKSI\SITES\MONUMENTWC\2017 SITE TELECOM\DWGS\T1-0-T1-1_TITLE-SHT.DWG;TCMICHAEL C:\USERS\TCMICHAEL\BOX\CDI\PKSI\SITES\MONUMENTWC\2017 SITE TELECOM\DWGS\T1-0-T1-1_TITLE-SHT.DWG; C:\USERS\TCMICHAEL\BOX\CDI\PKSI\SITES\MONUMENTWC\2017 SITE TELECOM\DWGS\T1-0-T1-1_TITLE-SHT.DWG;C:\USERS\TCMICHAEL\BOX\CDI\PKSI\SITES\MONUMENTWC\2017 SITE TELECOM\DWGS\T1-0-T1-1_TITLE-SHT.DWG;;

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

D

D

6" MIN. BEDDING

INITIAL

BACKFILL

DETECTABLE WARNING

TAPE, 12" ABOVE TOP OF

UTILITY PIPE OR CONDUIT

SUBSEQUENT

BACKFILL

D + 2'-0"

MAX.

WIDEN TRENCH

AS NEEDED

ABOVE PIPE FOR

WORKER SAFETY

UTILITY PIPE OR

CONDUIT

6" LOOSE

TOPSOIL

MEET EXISTING GRADE AND MATCH EXISTING

SURFACE IN AREAS OF ROAD CROSSINGS.

IN NON-ROAD AREAS MOUND BACKFILL 3" ABOVE

FINISH GRADE

INSTALL TRACER WIRE

WHEN FIBER OPTIC IS

ONLY UTILITY IN TRENCH

TRENCH DETAIL

NO SCALE

3/4" X 10'-0" GROUND ROD.

GROUND ROD CAN BE

INSTALLED ADJACENT TO

PULL BOX

PULL BOX DETAIL

NO SCALE

3/4" TO 1" AGGREGATE

PULL BOX WITH GROUNDING

RIBBON AND 12" CABLE RACKS,

2 ON EACH SIDE

CONDUIT PLUG, TYPICAL

CONDUIT, SEAL CONDUIT

PENETRATION, TYPICAL

BACKFILL, PLACE

IN 6" LAYERS

INSTALL CABLE AND FIBER OPTICS WITH

MINIMUM 20'-0" SERVICE LOOPS. SECURE

TO CABLE RACKS

RESTORE SURFACE

TO MATCH EXISTING

SURFACE

#6 BARE STRANDED

COPPER GROUND WIRE

FIBER OPTIC OR

COPPER CABLE

NOTES:

1. INSTALL PULL ROPE IN EACH CONDUIT AND

INNERDUCT. TIE TO GROUND ROD.

2. SEE PULL BOX SCHEDULE ON U2.1 FOR

NUMBER OF CONDUITS AND SIZES.

3. INSTALL WEATHERPROOF TAGS ON CABLES

AND FIBER OPTICS IN EACH POLE BOX. SEE

DETAIL ON THIS SHEET.

CABLE AND FIBER OPTIC TAG DETAIL

NO SCALE

· DIRECTION OF CABLE OR FIBER OPTIC RUN

· DEVICE ATTACHED

· FOOTAGE MEASUREMENT AT PULL BOX

· TYPE OF CABLE

· FIBER MANUFACTURER

· NUMBER OF FIBERS IN CABLE

· DATE OF INSTALLATION

ATTACH TAG TO EACH CABLE AND FIBER

OPTIC CABLE IN EACH PULL BOX

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

DATENO.

REVISION / ISSUE

MONUMENT WORK

CENTER TELECOM

UPGRADE

PIKE AND SAN ISABEL

NATIONAL FORESTS

CIMARRON AND COMANCHE

NATIONAL GRASSLANDS

PIKES PEAK RANGER DISTRICT

MONUMENT WORK CENTER

R2

ROCKY MOUNTAIN REGION

02/2020 10

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

SITE LEGEND, DETAILS,

AND

ABBREVIATIONS

CDI

L.CARROLL

G1.1

ABBREVIATIONS

AB ANCHOR BOLT

AD ALGEBRAIC DIFFERENCE

ADJ ADJACENT

AFF ABOVE FINISHED FLOOR

APPROX APPROXIMATE (LY)

BLDG BUILDING

BOL BEGINNING OF LINE

BOW BOTTOM OF WALL

BRG BEARING

BS BOTH SIDES

BW BOTH WAYS

CB CATCH BASIN

CL CENTERLINE

CMP CORRUGATED METAL PIPE

CP CONTROL POINT

CO CLEAN OUT

CO CONTRACTING OFFICER

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

CY CUBIC YARD

DBL DOUBLE

DIA. DIAMETER

DTL DETAIL

E EAST

EG EXISTING GRADE

EL ELEVATION

EOL END OF LINE

E OR EX EXISTING

EW EACH WAY

FIN FINISHED

FES FLARED END SECTION

FFE FINISH FLOOR ELEVATION

FG FINISHED GRADE

FRP FIBERGLASS REINFORCED PLASTIC

FT FOOT, FEET

FTG FOOTING

GA GAUGE

GALV GALVANIZED

GF GOVERNMENT FURNISHED

GOVT GOVERNMENT

GS GALVANIZED STEEL

GSP GALVANIZED STEEL PIPE

HDPE HIGH DENSITY POLYETHYLENE

HORIZ HORIZONTAL

HP HIGH POINT

HYD HYDRANT

ID INSIDE DIAMETER

IN INCH (ES)

INV INVERT

JT JOINT

L LENGTH

LB POUNDS

LF LINEAL, LINEAR FOOT

MAX MAXIMUM

MIN MINIMUM

N NORTH

NIC NOT IN CONTRACT

NO NUMBER

NPT NATIONAL PIPE THREAD

NTS NOT TO SCALE

OI OPTIONAL ITEM

OC ON CENTER

OCEW ON CENTER EACH WAY

OD OUTSIDE DIAMETER

PC POINT OF CURVATURE

PL PLATE

PT POINT OF TANGENCY

PVC POLYVINYL CHLORIDE

QTY QUANTITY

RAD RADIUS

REQ REQUIRE (D)

ROW RIGHT OF WAY

S SOUTH

SIM SIMILIAR

SEC SECTION

SF SQUARE FOOT

SPEC SPECIFICATION(S)

STA STATION

STD STANDARD

STL STEEL

SY SQUARE YARD

TOW TOP OF WALL

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

VC VERTICAL CURVE

VERT VERTICAL

W WEST

W/ WITH

WWF WELDED WIRE FABRIC

GENERAL SYMBOLS

@ AT

℄ CENTER LINE

° DEGREES

Ø DIAMETER

ɸ ELECTRICAL PHASE

LIMITS OF CONSTRUCTION

EDGE OF EXISTING GRAVEL ROAD

EXISTING 1 FT. INTERVAL CONTOURS

EXISTING INDEX CONTOURS

PROPERTY LINE

SITE LEGEND

WATER LINE

W

EXISTING DITCH CENTER LINE

SEWER LINE

S

OVERHEAD ELECTRIC LINE

UNDERGROUND TELECOMMUNICATION

OE

UT

GAS LINE

GAS

UNDERGROUND ELECTRIC LINE

UE

W

SLOPE TO DRAIN

CURB STOP

METERM

SANITARY YARD HYDRANTY

SEWER MANHOLE

SEWER CLEANOUT

C.O.

WATER HYDRANTH

AIR RELEASE VALVEA

TRANSFORMERT

UTILITY SYMBOLS

WELL

CULVERT

INFORMATIONAL SINGLE POST SIGN

INFORMATIONAL DOUBLE POST SIGN

SURVEYED SPOT ELEVATION

EXISTING UTILITY LINE, ABANDON

IN PLACE

CHAIN LINK FENCE

SIDEWALK

ROAD, COMPACTED SURFACE

LARGE PINE TREE

U T

U

T

U

T

U T

U

T

U

T

BUNKHOUSE A

LIBRARY

KITCHEN

CLASSROOM

3-STORY

HOTSHOTS

CACHE

F O

F O

F O

F O

F O

F O

F O

FO

FO

F O

F O

F

O

F

O

U

T

U

T

U

T

PB-D

PB-A

PB-B

PB-C

PB-X

U

T

U

T

U T

U T

U T

U T

U

T

U

T

U

T

U

T

U

T

U

T

U

T

UT

UT

U T

U T

U

T

U

T

U

T

U

T

T

PB-T1

20 0 20 40

SCALE OF FEET

PH1

U3.1

C M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I P

K S

I S

I T

E S

M

O N

U M

E N

T W

C

S

I T

E

T

E L E

C O

M D

W G

S U

V

E R

H E

A D

S

I T

E P

L A

N D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

DATENO.

REVISION / ISSUE

MONUMENT WORK

CENTER TELECOM

UPGRADE

PIKE AND SAN ISABEL

NATIONAL FORESTS

CIMARRON AND COMANCHE

NATIONAL GRASSLANDS

PIKES PEAK RANGER DISTRICT

MONUMENT WORK CENTER

R2

ROCKY MOUNTAIN REGION

02/2020 10

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

ENLARGED SITE

PLAN

A

T.MICHAEL

L.CARROLL

U1.1

2. SEE TRENCH DETAIL AND PULL BOX DETAIL ON G1.1.

3. CONTACT 811 BEFORE YOU DIG. LOCATE BOTH UTILITY OWNED AND GOVERNMENT OWNED UTILITIES.

PH2

U3.1

PH3

U3.1

KEY NOTES

INSTALL 4" CONDUIT ON EXISTING POWER POLE. OVERHEAD FIBER INSTALLED BY UTILITY COMPANY. SEE U1.0 FOR OVERHEAD

FIBER CONTINUATION.

INSTALL PULL BOX, SEE PULL BOX SCHEDULE ON U2.1 FOR CONDUIT AND CABLING REQUIREMENTS, TYPICAL.

INSTALL UNDERGROUND 4" CONDUIT WITH TWO 1-1/4" INNERDUCT AND INSTALL TRACER WIRE. UTILITY COMPANY TO PROVIDE

AND INSTALL 6 PAIR FIBER OPTIC FROM POLE TO DEMARC IN CLASSROOM BUILDING.

SEE U1.2 FOR CONTINUATION, TYPICAL.

ABANDON EXISTING DIRECT BURY TELECOMMUNICATION CABLING AND FIBER OPTICS AFTER SWITCH OVER, TYPICAL.

COORDINATE REMOVAL OF MPOP OUTDOOR TERMINAL AND ASSOCIATED EQUIPMENT WITH UTILITY COMPANY AFTER SWITCH

OVER. SWITCH OVER OCCURS AFTER CLASSROOM, BUNKHOUSE A, KITCHEN, AND HELITACK SYSTEMS ARE COMPLETE AND

ACCEPTED.

COORDINATE MPOP/APOP INSTALLATION WITH UTILITY COMPANY. SEE CLASSROOM SCHEDULE ON U2.1 FOR CONDUIT SIZES.

SEE E1.1 FOR WORK INSIDE BUILDING AND CONTINUATION.

INSTALL CONDUIT AND CABLE INTO BUNKHOUSE A, SEE E2.1 FOR WORK INSIDE BUILDING AND CONTINUATION.

EXISTING PULL BOX, CONNECT NEW FIBER TO EXISTING FIBER. FIELD VERIFY, COORDINATE, AND MATCH NEW FIBER WITH

EXISTING FIBER. EXISTING FIBER ASSUMED TO BE 62.5 MULTIMODE.

INSTALL 2" CONDUIT AND 6 PAIR COPPER TO KITCHEN. INSTALL BUILDING ENTRANCE PROTECTOR, GROUND BUS BAR AND

GROUND ROD. ROUTE #6 COPPER GROUND TO BUS BAR. CONNECT TO EXISTING 66 BLOCKS.

INSTALL 2" CONDUIT AND 6 PAIR COPPER TO STORAGE BUILDING. INSTALL BUILDING ENTRANCE PROTECTOR, GROUND BUS

BAR, AND GROUND ROD. ROUTE #6 GROUND TO BUS BAR. TERMINATE EXISTING SINGLE PHONE ON NEW EQUIPMENT.

INSTALL UNDERGROUND CONDUIT AND CABLING. SEE U2.1 FOR FIBER OPTIC, COPPER, AND CONDUIT SIZES. TYPICAL.

REMOVE TELCOM EQUIPMENT AND CABLING INSIDE LIBRARY AFTER SWITCH OVER. SEE PHOTOGRAPHS PH7 AND PH8 ON U3.1

FOR EQUIPMENT.

DWELLING CABLING. HAND DIG AND EXPOSE

ENOUGH CABLING TO ROUTE INTO PULL BOX

PB-D. INSTALL WATER PROOF SPLICE

CHAMBER. SPLICE DWELLING TO NEW 6 PAIR

COPPER IN 2" CONDUIT FROM 3-STORY.

REMOVE CONCRETE SIDEWALK TO PERMIT

CONDUIT INSTALLATION. INSTALL NEW

CONCRETE SIDEWALK TO MATCH EXISTING.

COORDINATE CONDUIT DEPTH WITH ROAD BED

OVER EXISTING CULVERT TO PREVENT

CULVERT DAMAGE.

ROUTE CONDUIT BELOW CULVERT.

COORDINATE CONDUIT INSTALLATION WITH

DITCH CROSSING. MAINTAIN BURIAL DEPTH.

INSTALL 2" CONDUIT WITH TWO-3/4"

INNERDUCTS AND TRACER WIRE. ROUTE 3 PAIR

FIBER OPTIC IN ONE INNERDUCT AND INSTALL

PULL STRING IN THE OTHER.

INSTALL UNDERGROUND 3" CONDUIT WITH TWO 1-1/4" INNERDUCT WITH PULL STRINGS FROM EXISTING

TELECOM BOX TO CLASSROOM. UTILITY COMPANY TO PROVIDE AND INSTALL 25 PAIR COPPER.

UNDER BASE ITEM, STUB CONDUIT TO BASE OF BUILDING. UNDER OPTION ITEM, REMOVE EXISTING JUNCTION

BOX AND EXTERIOR CONDUIT AT BUILDING ENTRANCE. INSTALL NEW JUNCTION BOX. EXTEND CONDUIT FROM

STUB OUT. INSTALL FIBER AND CABLE INSIDE BUILDING TO 2ND FLOOR COMM CLOSET. TERMINATE FIBER AND

CABLE AT EXISTING EQUIPMENT. INSTALL BUILDING ENTRANCE PROTECTOR AND GROUND BUS BAR ON

EXISTING BACKBOARD. INSTALL GROUND ROD AND ROUTE #1 COPPER GROUND TO GROUND BUS BAR.

REMOVE EXISTING JUNCTION BOX AND EXTERIOR CONDUIT AT BUILDING ENTRANCE. INSTALL NEW JUNCTION

BOX. EXTEND CONDUIT INSIDE BUILDING. MOUNT 6'-0" BY 4'-0" BACKBOARD ON INSIDE WALL. TERMINATE FIBER

AND CABLE AT BACKBOARD. INSTALL FIBER OPTIC JUNCTION BOX, BUILDING ENTRANCE PROTECTOR, 15 U

SWING OUT CABINET WITH 24 PORT PATCH PANEL, AND GROUND BUS BAR. INSTALL GROUND ROD AND ROUTE

#6 COPPER GROUND TO BUS BAR. SEE DETAIL ON U2.1.

ROUTE 2" CONDUIT WITH 6 PAIR COPPER FROM 2ND FLOOR COMM CLOSET TO PULL BOX PD-D. SURFACE MOUNT

CONDUIT INSIDE BUILDING.

EXISTING 100 PAIR COPPER TO HELITACK. HAND DIG AND EXPOSE ENOUGH CABLING AND REINSTALL IN NEW

TRENCH TO PULL BOX PB-C. INSTALL WATER PROOF SPLICE CHAMBER. SPLICE EXISTING 100 PAIR TO

REMAINING 19 PAIR COPPER.

EXISTING UTILITY COMPANY TELECOM BOX TO REMAIN.

PH8

U3.1

PH4

U3.1

PH9

U3.1

PH5

U3.1

PH7

U3.1

PH6

U3.1

BUNKHOUSE B

BUNKHOUSE C

U

T

U

T

U

T

U

T

U

T

U

T

U

T

PB-E

T

T

T

T

T

T

T

T

T

T

T

T

T

T

20 0 20 40

SCALE OF FEET

M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I P

K S

I S

I T

E S

M

O N

U M

E N

T W

C

S

I T

E

T

E L E

C O

M D

W G

S U

V

E R

H E

T

E P

L A

N D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

DATENO.

REVISION / ISSUE

MONUMENT WORK

CENTER TELECOM

UPGRADE

PIKE AND SAN ISABEL

NATIONAL FORESTS

CIMARRON AND COMANCHE

NATIONAL GRASSLANDS

PIKES PEAK RANGER DISTRICT

MONUMENT WORK CENTER

R2

ROCKY MOUNTAIN REGION

02/2020 10

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

ENLARGED SITE

PLAN

B

T.MICHAEL

L.CARROLL

U1.2

KEY NOTES

INSTALL 2" CONDUIT WITH 25 PAIR.

INSTALL PULL BOX. SEE PULL BOX SCHEDULE ON U2.1 FOR CONDUIT AND CABLING

REQUIREMENTS. INSTALL WATER PROOF SPLICE CHAMBER. ROUTE 6 PAIR

COPPER IN 2" CONDUIT TO PUMP HOUSE. CONNECT 25 PAIR TO REMAINING 19 PAIR AND

LABEL. ROUTE 25 PAIR TO BUNKHOUSES.

MOUNT BUILDING ENTRANCE PROTECTOR, GROUND BUS BAR, GROUND ROD, AND #6

COPPER GROUND. CORE THROUGH SIDE OF CONCRETE PUMP BUILDING. TERMINATE

CABLE FOR FUTURE CONNECTION INSIDE BUILDING.

INSTALL EXTERIOR BUILDING ENTRANCE PROTECTOR. RECONNECT EXISTING 100 PAIR.

MOUNT ENTRANCE PANEL NEAR EXISTING CROSS CONNECT POINT OF BUILDING CABLES

LOCATED IN MECHANICAL ROOM.

EXISTING 100 PAIR TO BUNKHOUSE C TO REMAIN.

ABANDON EXISTING DIRECT BURY TELECOMMUNICATION CABLING AFTER SWITCH OVER,

TYPICAL.

SEE U1.1 FOR CONTINUATION.

OVERHEAD FIBER OPTICS ON EXISTING POWER POLES INSTALLED BY UTILITY COMPANY.

SEE U1.0 FOR CONTINUATION.

INSTALL 2" CONDUIT WITH 25PAIR.

3. CONTACT 811 BEFORE YOU DIG. LOCATE BOTH UTILITY OWNED AND GOVERNMENT OWNED

UTILITIES.

COPPER

4-

FIBER

FINAL LOCATION

POWER POLE

TO

CONDUIT

(IN) (PAIRS) (PAIRS)

REMARKS

KITCHEN

UTILITY COMPANY TO INSTALL FIBER

PB-A

BUNKHOUSE A25

HOTSHOTS CACHE

COPPERFIBER

TO

CONDUIT

(IN) (PAIRS) (PAIRS)

REMARKS

HOTSHOTS

CACHE

COPPERFIBER

TO

CONDUIT

(IN) (PAIRS) (PAIRS)

REMARKS

COPPERFIBER

TO

CONDUIT

(IN) (PAIRS) (PAIRS)

REMARKS

COPPERFIBER

REMARKS

TO

CONDUIT

(IN) (PAIRS) (PAIRS)

REMARKS

2 -

COPPERFIBER

TO

CONDUIT

(IN) (PAIRS) (PAIRS)

4 6

CONDUIT IN. UTILITY COMPANY TO INSTALL FIBER

FROM

3-STORY

FROM

HOTSHOT CACHE

FROM

PB-A

FROM

PB-B

FROM

POLE

COPPERFIBER

TO

CONDUIT

(IN) (PAIRS) (PAIRS)

REMARKS

FROM

CLASSROOM

TELECOM BOX

UTILITY COMPANY TO INSTALL CABLES

- PUMPHOUSE

CONDUIT OUT

HELITACK

252 -- BUNKHOUSE B/C

CONDUIT IN

CONDUIT OUT, SPLICE 6 PAIR IN PULL BOX

CONDUIT OUT, SPLICE 19 PAIR IN PULL BOX

DWELLING

CONDUIT OUT. REROUTE EXISTING DWELLING PAIRS INTO PB-D AND

SPLICE TO 6 PAIR IN PULL BOX

CONDUIT IN

-2

PB-X

KITCHEN

CONDUIT IN

CONDUIT IN

CONDUIT OUT

CONDUIT OUT

PB-C

PB-B

CONDUIT OUT

3-STORY

3 CONDUIT OUT

CONDUIT IN

CLASSROOM

CONDUIT OUT. UTILITY COMPANY TO INSTALL FIBER

4 SETS

OF 25

3 SETS

OF 25

3 SETS

OF 25

2 SETS

OF 25

2 SETS

OF 25

BUNKHOUSE A

CONDUIT OUT. REROUTE EXISTING 100 PAIR INTO

PB-C AND SPLICE TO 25 PAIR IN PULL BOX

CONDUIT OUT

COPPERFIBER

TO

CONDUIT

(IN) (PAIRS) (PAIRS)

REMARKS

2 3

FROM

PB-C - CONDUIT IN

HELITECK

3-STORY

STORAGE

INNERDUCT

(# / SIZE)

2 / 1-1/4

3 / 1-1/4

INNERDUCT

(# / SIZE)

3 / 1-1/4

3 / 1-1/4

INNERDUCT

(# / SIZE)

3 / 1-1/4

3 / 1-1/4

3 / 1-1/4

INNERDUCT

(# / SIZE)

3 / 1-1/4

3 / 1-1/4

3 / 1-1/4

INNERDUCT

(# / SIZE)

3 / 1-1/4

3 / 1-1/4

2 / 3/4

INNERDUCT

(# / SIZE)

2 / 3/4

3 SETS OF 3

1 SET OF 6

2 SETS OF 3

1 SET OF 6

2 SETS OF 3

1 SET OF 6

1 SET OF 3

1 SET OF 6

1 SET OF 3

1 SET OF 6

CONDUIT OUT. SPLICE TO 25 PAIR IN PULL BOX

M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I P

K S

I S

I T

E S

M

O N

U M

E N

T W

C

S

I T

E

T

E L E

C O

M D

W G

S U

V

E R

H E

T

E P

L A

N D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

DATENO.

REVISION / ISSUE

MONUMENT WORK

CENTER TELECOM

UPGRADE

PIKE AND SAN ISABEL

NATIONAL FORESTS

CIMARRON AND COMANCHE

NATIONAL GRASSLANDS

PIKES PEAK RANGER DISTRICT

MONUMENT WORK CENTER

R2

ROCKY MOUNTAIN REGION

02/2020 10

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

CLASSROOM,

BUNKHOUSE A, AND

PULL BOX

SCHEDULES

T.MICHAEL

L.CARROLL

U2.1

T

C M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L

B

O X

C

D I P

K S

I S

I T

E S

M

O N

U M

E N

T W

C

S

I T

E

T

E L

E C

O M

D

W G

S U

V E

R H

E A

D

S

I T

E P

L A

N D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

DATENO.

REVISION / ISSUE

MONUMENT WORK

CENTER TELECOM

UPGRADE

PIKE AND SAN ISABEL

NATIONAL FORESTS

CIMARRON AND COMANCHE

NATIONAL GRASSLANDS

PIKES PEAK RANGER DISTRICT

MONUMENT WORK CENTER

R2

ROCKY MOUNTAIN REGION

07/2019 10

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

PHOTOGRAPHS

T.MICHAEL

L.CARROLL

U3.1

PH1

U1.1

PH2

U1.1

PH3

U1.1

KEY NOTES

COORDINATE WITH UTILITY COMPANY TO REMOVE EXISTING MPOP OUTDOOR TERMINAL AND ASSOCIATED TELECOM

EQUIPMENT AFTER SERVICE SWITCHOVER IS COMPLETE.

REMOVE EXISTING JUNCTION BOX AND EXTERIOR CONDUIT AT BUILDING ENTRANCE. INSTALL NEW JUNCTION BOX, CONDUIT, FIBER AND COPPER PAIRS.

OVERHEAD ELECTRICAL SERVICE. UTILITY COMPANY TO INSTALL OVERHEAD FIBER. INSTALL 4" CONDUIT AND

WEATHERHEAD ON POWER POLE. INSTALL PULL BOX NEAR POLE BASE AND EXTEND CONDUIT FROM POLE TO NEW

DEMARC IN CLASSROOM TELECOM ROOM.

COORDINATE CONDUIT DEPTH WITH ROAD BED OVER EXISTING CULVERT.

TELECOM PEDESTAL. INSTALL 3" CONDUIT WITH TWO 1-1/4" INNERDUCT WITH PULL STRINGS TO CLASSROOM

DEMARK. UTILITY COMPANY TO PROVIDE AND INSTALL 25 PAIR COPPER.

REMOVE TELECOM CONDUIT, CABLING, AND EQUIPMENT AFTER SWITCH OVER.

INSTALL 2" CONDUIT AND COPPER PAIRS. CONNECT TO EXISTING.

PH8

U1.1

PH4

U1.1

PH5

U1.1

PH6

U1.1

PH9

U1.1

PH7

U1.1

INSTALL FUNNEL DRAIN WITH P-TRAP INSIDE BUILDING, ROUTE 1" DRAIN TO BUILDING

EXTERIOR. TERMINATE WITH ELBOW.

WALL MOUNT TEMPERATURE CONTROLLER.

DATENO.

REVISION / ISSUE

MONUMENT WORK

CENTER TELECOM

UPGRADE

PIKE AND SAN ISABEL

NATIONAL FORESTS

CIMARRON AND COMANCHE

NATIONAL GRASSLANDS

PIKES PEAK RANGER DISTRICT

MONUMENT WORK CENTER

R2

ROCKY MOUNTAIN REGION

02/2020 10

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MECHANICAL PLAN,

LEGEND, AND

EQUIPMENT SCHEDULE

CLASSROOM

T.MICHAEL

L.CARROLL

M1.1

DATENO.

REVISION / ISSUE

MONUMENT WORK

CENTER TELECOM

UPGRADE

PIKE AND SAN ISABEL

NATIONAL FORESTS

CIMARRON AND COMANCHE

NATIONAL GRASSLANDS

PIKES PEAK RANGER DISTRICT

MONUMENT WORK CENTER

R2

ROCKY MOUNTAIN REGION

02/2020 10

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

ELECTRICAL AND

TELECOMMUNICATION

PLAN, LEGEND, AND

PHOTOGRAPHS

CLASSROOM

T.MICHAEL

L.CARROLL

E1.1

CORRIDOR

PANEL A

TB

WOMENS SHWR

MEN'S SHWR

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

MECH ROOM

LAUNDRY

BEDROOM

BEDROOM

A15,17

A16

GFI

GFI+46"

GFI+46"

GFI+46"

GFI+46"

A1

GFI

WP

GFI

WP

A4

A6

A8

A9

A11

A13

A20

A19

A3

A5

A10

A7

A26,28

EH

A14

54"

J

A21

A22,24

J

A18

A12

GFI

GFI

GFI

GFI

EH

A23,25

TB

JK-34

JK-33

JK-FIRE

JK-32

JK-35

JK-36

JK-FAX

NOT TO SCALE

KEY NOTES

ELECTRICAL AND TELECOMMUNICATION PLAN

GENERAL NOTES

1. ROUTE CABLING ABOVE ACCESSIBLE SUSPENDED CEILING USING BRIDAL RINGS OR SIMILAR

SUPPORT SYSTEM.

2. FIRE SEAL CONDUIT PENETRATIONS IN CORRIDOR/MECHANICAL ROOM WALL.

REMOVE EXISTING TELEPHONE BOARD AND COMMUNICATION COMPANY DEMARC AFTER

SWITCHOVER.

INSTALL ONE 4" CONDUIT WITH 25 PAIR COPPER AND 6 PAIR FIBER OPTIC TO CLASSROOM.

TERMINATE CONDUITS 3" ABOVE FINISH FLOOR, EXTEND FIBER AND COPPER TO TELECOM

BACKBOARD. SEE U1.1 FOR CONTINUATION

MOUNT 3'-0" X 6'-0" TELECOM BACKBOARD. MOUNT GROUND BUS BAR ON BACKBOARD AND

ROUTE #1 GROUND CONDUCTOR TO ELECTRICAL GROUNDING ELECTRODE. MOUNT

BUILDING ENTRANCE PROTECTOR, FIBER OPTIC JUNCTION BOX, AND 15U SWING

OUTCABINET. INSTALL 24 PORT PATCH PANEL. SEE DETAIL ON THIS SHEET.

EXISTING FIRE ALARM COMMUNICATION BOX WITH TWO EXISTING CABLING PAIRS. REMOVE

EXISTING PAIRS. ROUTE NEW PAIRS TO NEW PATCH PANEL AND CONNECT.

EXISTING PHONE OUTLET. REMOVE EXISTING PAIRS. ROUTE NEW PAIRS TO NEW PATCH

PANEL AND CONNECT.

EXISTING COMMUNICATION BOX WITH JACKS AND CABLING. REMOVE JACKS AND CABLING.

INSTALL BLANK COVER PLATE.

EXISTING COMMUNICATION BOX WITH COVER PLATE AND CONDUIT TO REMAIN.

SCALE OF FEET

1/4" = 1'-0"

T

C M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L

B

O X

C

D I P

K S

I B

L D

G S

M

O N

U M

E N

T H

I S

T O

R

B

N

K H

O U

S E

T

E L

E C

O M

P G

R A

D E

D

W G

S M

O N

B

U N

K

M E

P

T

E L

E C

O M

A

L T

D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

DATENO.

REVISION / ISSUE

MONUMENT WORK

CENTER TELECOM

UPGRADE

PIKE AND SAN ISABEL

NATIONAL FORESTS

CIMARRON AND COMANCHE

NATIONAL GRASSLANDS

PIKES PEAK RANGER DISTRICT

MONUMENT WORK CENTER

R2

ROCKY MOUNTAIN REGION

02/2020 10

F

O

R

E

S T

SE

R

V

I

C

E

D E

P

A

R

T M

E N

T OF AGR

I C

U

L

T

U R

E

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

ELECTRICAL AND

TELECOMMUNICATION

PLAN

BUNKHOUSE A

T.MICHAEL

L.CARROLL

E2.1

T1
Sheets and Views
T1.0
G11
Sheets and Views
G1.1
U10
U11
Sheets and Views
U1.1
U12
Sheets and Views
U1.2
U21
Sheets and Views
U2.1
U31
Sheets and Views
U31
M11
Sheets and Views
M11 FLOOR
PLOT
E11
Sheets and Views
E11 FLOOR
PLOT
E21
Sheets and Views
E2.1 FLOOR
PLOT
T1.pdf
Sheets and Views
T1.0

File details come from the government source that posted it. Updated .