Drawings - Carolyn Creek Trail Bridge Final 8-02-24 - Signed.pdf
PDF 17 MB Posted
- Attached to
- Carolyn Creek Trail Bridge Project (GAOA)
- Solicitation number
- 1240LT24R0017
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Solicitation for the Carolyn Creek Trail Bridge Project (GAOA) in the Humboldt-Toiyabe National Forest. The Forest Service is seeking a contractor to provide all materials, labor, equipment, and other necessary components to design, purchase, deliver, and install a 27-foot span glulam timber trail bridge with metal railing. The existing bridge will be removed and disposed of. The project is a total small business set-aside with an estimated value between $50,000 to $110,000. The site is located approximately 1 mile up a hiking trail, potentially requiring helicopter transport. Proposals are due by 08/06/2024 at 12:00 PM PT. A site visit is scheduled for 07/30/2024 at 11:00 AM PT, but is not mandatory. Contractor questions are due by 08/02/2024 at 12:00 PM PT. All work must be completed by 09/30/2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOSHUA NICHOLES
Digitally signed by JOSHUA
NICHOLES
Date: 2023.04.28 10:25:06 -07'00'
KEVIN WILMOT Digitally signed by KEVIN WILMOT Date: 2023.04.25 07:19:17 -07'00'
CHAD PORTER Digitally signed by CHAD PORTER Date: 2023.04.24 17:05:39 -06'00'
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /24
:5
4 D
AK
OT
AK
RI
ST
C :\U
SE
RS
\D
AK
OT
AK
RI
ST
\B
OX
\H T
EN
GI
NE
ER
IN
G
AC
TI
VE
P
RO
JE
CT
S\
RM
MC
J\2
2.R
MM
CJ
.G
AO
AC
AR
OL
YN
BR
ID
GE
\D
ES
IG
NW
OR
K\
CD
_D
ES
IG
N2
2.D W
G;
R4 Intermountain Region
Carolyn Creek Trail Bridge
HUMBOLDT-TOIYABE
NATIONAL FOREST
RUBY MOUNTAINS DISTRICT
GENERAL NOTES
C.PORTER
C.DEDMORE
C.PORTER
G-081
WEARING SURFACE TREATMENT 08/02/24
I F---3 10 20 ,-I ------<I Feet
SITE PLAN
FINISHED
MAXIMUM
ABUTMENT 1 27.0v ABUTMENT 2
STA. 0+22.40;'
:STA. 0+49.21'
ELEV. 9303.51' ELEV. 9304.64'
3.50
\ I rsl
NISHED
URFACE
TRAIL SURFACE
�� 9" STEP UP ALLOWED \ I
I\ j
:h, /� \/ ::c
�J� � / ---'-,f-'- '--EXISTING
' i--5.00- / g GROUND
0+20 0+30 0+40 0+50 O+
*EXISTING STACKED ROCK ABUTMENTS.
**IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY EXISTING ABUTMENT ELEVATIONS. CHANGES
TO THE ELEVATIONS SHALL BE COORDINATED WITH THE COR.
PROFILE
NOTES:
1. CONTRACTOR SHALL SUBMIT AN ERECTION/REMOVAL PLAN FOR TRANSPORTING
EQUIPMENT AND MATERIALS, ERECTING NEW BRIDGE, AND REMOVING EXISTING
BRIDGE, FOR REVIEW AND APPROVAL BY THE CO 30 DAYS PRIOR TO CONSTRUCTION. IF
HELICOPTER IS USED FOR TRANSPORT, INSTALLATION AND REMOVAL WORK, BRIDGE
ERECTION/REMOVAL PLAN SHALL CLEARLY SPECIFY NUMBER OF FLIGHTS AND FLIGHT
DAYS. CONTRACTOR SHALL MINIMIZE NUMBER OF FLIGHTS AND NOT EXCEED THE
ALLOWED FLIGHTS AND FLIGHT DAYS AS DESCRIBED IN THE MINIMUM REQUIREMENTS
ANALYSIS (MRA) THAT IS INCLUDED IN THE SOLICITATION.
2. EXISTING BRIDGE SHALL BE REMOVED FROM THE HUMBOLDT-TOIYABE N.F. AND
DISPOSED OF. EXISTING BRIDGE IS 27'x6' NAIL-LAMINATED STRUCTURE WITH A TIMBER
RAILING AND (12)2"X12"X6' TIMBER SILL BOARDS.
3. EXISTING ROCK/CONCRETE ABUTMENTS WILL REMAIN IN PLACE AND BE USED AS
ABUTMENTS FOR NEW BRIDGE.
United States Department of Agriculture
Forest Service
R4 lntermountain Region
NO. REVISION/ ISSUE
PROJECT NAME
Carolyn Creek Trail Bridge
DATE
HUMBOLDT-TOIYABE
NATIONAL FOREST
RUBY MOUNTAINS DISTRICT
DRA\/\INGTITLE
SITE PLAN AND PROFILE
DATE
ARCHIVE NO.
04/21/2023
DESIGNER DRAWNG SHEET NO.
C.PORTER
DRAWN S-02C.DEDMORE
CHECKED
C.PORTER
PROJECT NO. SHEET 3 OF 8
G-081
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /24
:5
4 D
AK
OT
AK
RI
ST
C :\U
SE
RS
\D
AK
OT
AK
RI
ST
\B
OX
\H T
EN
GI
NE
ER
IN
G
AC
TI
VE
P
RO
JE
CT
S\
RM
MC
J\2
2.R
MM
CJ
.G
AO
AC
AR
OL
YN
BR
ID
GE
\D
ES
IG
NW
OR
K\
CD
_D
ES
IG
N2
2.D W
G;
R4 Intermountain Region
Carolyn Creek Trail Bridge
HUMBOLDT-TOIYABE
NATIONAL FOREST
RUBY MOUNTAINS DISTRICT
DETAILS: DECK PANEL
AND ABUTMENT
CONNECTIONS
C.PORTER
C.DEDMORE
C.PORTER
G-081
SILL DETAIL. SILL LENGTH 6'
CORRECTION: 6 GLULAM PANELS 08/02/24
08/02/24
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /24
:5
4 D
AK
OT
AK
RI
ST
C :\U
SE
RS
\D
AK
OT
AK
RI
ST
\B
OX
\H T
EN
GI
NE
ER
IN
G
AC
TI
VE
P
RO
JE
CT
S\
RM
MC
J\2
2.R
MM
CJ
.G
AO
AC
AR
OL
YN
BR
ID
GE
\D
ES
IG
NW
OR
K\
CD
_D
ES
IG
N2
2.D W
G;
R4 Intermountain Region
Carolyn Creek Trail Bridge
HUMBOLDT-TOIYABE
NATIONAL FOREST
RUBY MOUNTAINS DISTRICT
DETAILS: DECK PANEL
AND ABUTMENT
CONNECTIONS
C.PORTER
C.DEDMORE
C.PORTER
G-081
SILL DETAIL. SILL LENGTH 6'
CORRECTION: 6 GLULAM PANELS 08/02/24
08/02/24
File details come from the government source that posted it. Updated .