Drawings - Carolyn Creek Trail Bridge Final 8-02-24 - Signed.pdf

PDF 17 MB Posted

Attached to
Carolyn Creek Trail Bridge Project (GAOA)
Solicitation number
1240LT24R0017
Issued by

About this file

This document is a Solicitation for the Carolyn Creek Trail Bridge Project (GAOA) in the Humboldt-Toiyabe National Forest. The Forest Service is seeking a contractor to provide all materials, labor, equipment, and other necessary components to design, purchase, deliver, and install a 27-foot span glulam timber trail bridge with metal railing. The existing bridge will be removed and disposed of. The project is a total small business set-aside with an estimated value between $50,000 to $110,000. The site is located approximately 1 mile up a hiking trail, potentially requiring helicopter transport. Proposals are due by 08/06/2024 at 12:00 PM PT. A site visit is scheduled for 07/30/2024 at 11:00 AM PT, but is not mandatory. Contractor questions are due by 08/02/2024 at 12:00 PM PT. All work must be completed by 09/30/2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOSHUA NICHOLES

Digitally signed by JOSHUA

NICHOLES

Date: 2023.04.28 10:25:06 -07'00'

KEVIN WILMOT Digitally signed by KEVIN WILMOT Date: 2023.04.25 07:19:17 -07'00'

CHAD PORTER Digitally signed by CHAD PORTER Date: 2023.04.24 17:05:39 -06'00'

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

8/5 /24

:5

4 D

AK

OT

AK

RI

ST

C :\U

SE

RS

\D

AK

OT

AK

RI

ST

\B

OX

\H T

EN

GI

NE

ER

IN

G

AC

TI

VE

P

RO

JE

CT

S\

RM

MC

J\2

2.R

MM

CJ

.G

AO

AC

AR

OL

YN

BR

ID

GE

\D

ES

IG

NW

OR

K\

CD

_D

ES

IG

N2

2.D W

G;

R4 Intermountain Region

Carolyn Creek Trail Bridge

HUMBOLDT-TOIYABE

NATIONAL FOREST

RUBY MOUNTAINS DISTRICT

GENERAL NOTES

C.PORTER

C.DEDMORE

C.PORTER

G-081

WEARING SURFACE TREATMENT 08/02/24

I F---3 10 20 ,-I ------<I Feet

SITE PLAN

FINISHED

MAXIMUM

ABUTMENT 1 27.0v ABUTMENT 2

STA. 0+22.40;'

:STA. 0+49.21'

ELEV. 9303.51' ELEV. 9304.64'

3.50

\ I rsl

NISHED

URFACE

TRAIL SURFACE

�� 9" STEP UP ALLOWED \ I

I\ j

:h, /� \/ ::c

�J� � / ---'-,f-'- '--EXISTING

' i--5.00- / g GROUND

0+20 0+30 0+40 0+50 O+

*EXISTING STACKED ROCK ABUTMENTS.

**IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY EXISTING ABUTMENT ELEVATIONS. CHANGES

TO THE ELEVATIONS SHALL BE COORDINATED WITH THE COR.

PROFILE

NOTES:

1. CONTRACTOR SHALL SUBMIT AN ERECTION/REMOVAL PLAN FOR TRANSPORTING

EQUIPMENT AND MATERIALS, ERECTING NEW BRIDGE, AND REMOVING EXISTING

BRIDGE, FOR REVIEW AND APPROVAL BY THE CO 30 DAYS PRIOR TO CONSTRUCTION. IF

HELICOPTER IS USED FOR TRANSPORT, INSTALLATION AND REMOVAL WORK, BRIDGE

ERECTION/REMOVAL PLAN SHALL CLEARLY SPECIFY NUMBER OF FLIGHTS AND FLIGHT

DAYS. CONTRACTOR SHALL MINIMIZE NUMBER OF FLIGHTS AND NOT EXCEED THE

ALLOWED FLIGHTS AND FLIGHT DAYS AS DESCRIBED IN THE MINIMUM REQUIREMENTS

ANALYSIS (MRA) THAT IS INCLUDED IN THE SOLICITATION.

2. EXISTING BRIDGE SHALL BE REMOVED FROM THE HUMBOLDT-TOIYABE N.F. AND

DISPOSED OF. EXISTING BRIDGE IS 27'x6' NAIL-LAMINATED STRUCTURE WITH A TIMBER

RAILING AND (12)2"X12"X6' TIMBER SILL BOARDS.

3. EXISTING ROCK/CONCRETE ABUTMENTS WILL REMAIN IN PLACE AND BE USED AS

ABUTMENTS FOR NEW BRIDGE.

United States Department of Agriculture

Forest Service

R4 lntermountain Region

NO. REVISION/ ISSUE

PROJECT NAME

Carolyn Creek Trail Bridge

DATE

HUMBOLDT-TOIYABE

NATIONAL FOREST

RUBY MOUNTAINS DISTRICT

DRA\/\INGTITLE

SITE PLAN AND PROFILE

DATE

ARCHIVE NO.

04/21/2023

DESIGNER DRAWNG SHEET NO.

C.PORTER

DRAWN S-02C.DEDMORE

CHECKED

C.PORTER

PROJECT NO. SHEET 3 OF 8

G-081

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

8/5 /24

:5

4 D

AK

OT

AK

RI

ST

C :\U

SE

RS

\D

AK

OT

AK

RI

ST

\B

OX

\H T

EN

GI

NE

ER

IN

G

AC

TI

VE

P

RO

JE

CT

S\

RM

MC

J\2

2.R

MM

CJ

.G

AO

AC

AR

OL

YN

BR

ID

GE

\D

ES

IG

NW

OR

K\

CD

_D

ES

IG

N2

2.D W

G;

R4 Intermountain Region

Carolyn Creek Trail Bridge

HUMBOLDT-TOIYABE

NATIONAL FOREST

RUBY MOUNTAINS DISTRICT

DETAILS: DECK PANEL

AND ABUTMENT

CONNECTIONS

C.PORTER

C.DEDMORE

C.PORTER

G-081

SILL DETAIL. SILL LENGTH 6'

CORRECTION: 6 GLULAM PANELS 08/02/24

08/02/24

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

8/5 /24

:5

4 D

AK

OT

AK

RI

ST

C :\U

SE

RS

\D

AK

OT

AK

RI

ST

\B

OX

\H T

EN

GI

NE

ER

IN

G

AC

TI

VE

P

RO

JE

CT

S\

RM

MC

J\2

2.R

MM

CJ

.G

AO

AC

AR

OL

YN

BR

ID

GE

\D

ES

IG

NW

OR

K\

CD

_D

ES

IG

N2

2.D W

G;

R4 Intermountain Region

Carolyn Creek Trail Bridge

HUMBOLDT-TOIYABE

NATIONAL FOREST

RUBY MOUNTAINS DISTRICT

DETAILS: DECK PANEL

AND ABUTMENT

CONNECTIONS

C.PORTER

C.DEDMORE

C.PORTER

G-081

SILL DETAIL. SILL LENGTH 6'

CORRECTION: 6 GLULAM PANELS 08/02/24

08/02/24

File details come from the government source that posted it. Updated .