This document contains questions and answers from a pre-bid meeting for the Stanley Lake and Alturas Lake Road Asphalt Maintenance Project. The Forest Service is seeking proposals to conduct asphalt repair and patching on Stanley Lake Road, with quantities adjusted from 15 tons to 70 tons for a 170 foot by 24 foot patch requiring 3 inches of asphalt. Alternative methods such as scrub coating or microsurfacing will be considered. A location for stockpiling chips halfway along Stanley Lake Road is specified. The attached table replaces spread rate specifications in the project documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stanley Lake and Alturas Lake Road Asphalt Maintenance Project Pre-Bid Questions and Answers
Attendees:
Kevin Duchow, USFS COR John Kloepfer, Kloepfer Concrete and Paving
Questions and Answers:
1. Where is a good stockpile location at Stanley Lake for chips?
a. There is an old gravel pit about halfway along the Stanley Lake Road on the west side of the road. There is a large flat area that can be flagged off to be used for a stockpile.
2. Can the contractor propose to scrub coat, micro surface, or use another method for the asphalt repair and patching on Stanley Lake Road?
a. The Forest Service is willing to consider alternative methods of achieving the same goal. Preference would be given to cut, over excavation, compaction and patching.
3. For Stanley Lake patching, the quantities did not include a patch, roughly 170’x24’x3inches.
a. The quantity should be changed from 15 Tons, to 70 Tons.
4. The Table with the spread rates for the chips does not go all the way to 100 lb/sy?
a. Replace table 407.09-1 in the specifications with this attached table.
Table 407.09-1 Approximate Spread Rates
| Unit Weight lbs/ft3 |
| Application Rate lbs/yd2 |
| 70 -75 |
| 18 - 24 |
| 75 – 80 |
| 19 - 25 |
| 80 – 85 |
| 20 - 26 |
| 85 – 90 |
| 21 - 27 |
| 90 – 95 |
| 22 - 28 |
| 95 – 100 |
| 23 - 29 |
Note: Contractor shall provide proposed chip spread rates for approval