This federal contract opportunity notice solicits bids for the Redfish Lake Outlet Trail Bridge Construction Project 2021. The project involves removing an existing 30-foot-wide, 88-foot-long creosote-treated vehicle bridge and constructing a new 13-foot-wide, 95-foot-long single-span treated timber trail bridge. Construction will also remove existing bridge approach asphalt and install new asphalt approaches. The project is located near Stanley, Idaho. The anticipated project start date is September 13, 2021 and end date is June 30, 2022. The estimated price range for the project is between $250,000 to $1,000,000. Bids are solicited by the USDA Forest Service Intermountain Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1026982
USDA-FS CSA INTERMOUNTAIN 8
324 25TH ST
OGDEN UT 84401-2310
40LT
OFFERS TO BE EMAILED TO:
KAREN MORTHLAND@USDA.GOV
KAREN MORTHLAND 208-373-4115
1x 05/07/2021
1240LT21R0003
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
IGF:CL:IGF REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 202
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 372 calendar days and complete it within ________________ ________________ calendar days after receiving
06/08/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA-FS CSA INTERMOUNTAIN 8
324 25TH ST
OGDEN UT 84401-2310
40LT
KAREN MORTHLAND
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1240LT21R0003
THIS PROJECT IS SUBJECT TO AVAILABILITY OF FUNDS
Delivery: 06/30/2022
Delivery Location Code: 272
USDA FS STANLEY RANGER STATION
SAWTOOTH NATIONAL RECREATION AREA
SAWTOOTH NATIONAL FOREST
STANLEY ID 83278 US
Period of Performance: 06/21/2021 to 06/30/2022
IGF:CL:IG
0001 IGF:CL:IGF REDFISH LAKE OUTLET TRAIL BRIDGE
CONSTRUCTION PROJECT 2021
Product/Service Code: Y1LB
Product/Service Description: CONSTRUCTION OF
HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 4
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
Redfish Lake Outlet Trail Bridge Construction Project Sawtooth National Forest
Sawtooth National Recreation Area Custer County, Idaho
B.1 Schedule of Items
Item No. Description Est.
Quantity Unit Unit Price Total Price
15101 Mobilization 1 Lump Sum $_________ $__________
15201 Construction Survey and Staking 1 Lump Sum $_________ $__________
15701 Soil Erosion, Pollution Control & Site Restoration 1 Lump Sum $_________ $__________
20301 Asphalt Pavement Removal 578 Square Yard $_________ $__________
20302 Removal of Existing Bridge 1 Lump Sum $_________ $__________
20401 Trail Excavation & Embankment Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction
1 Lump Sum $_________ $__________
20402 Select Borrow Including Haul, Watering, and Compaction 50 Cubic Yard $_________ $__________
20701 Earthwork Geotextile, Type II-A 206 Square Yard $_________ $__________
20801 Structure Excavation & Backfill 1 Lump Sum $_________ $__________
20901 Waterline Pipe Bedding and Backfill 122 Lineal Foot $_________ $__________
25101 Placed Riprap, Class 4 (Imported) 65 Cubic Yard $_________ $__________
25102 Placed Riprap, Class 4 (Salvaged Onsite) 45 Cubic Yard $_________ $__________
30101 3/4"-0” Aggregate Base (Grading ‘D’), Including Haul, Watering, and Compaction Method ‘D’ 35 Cubic Yard $_________ $__________
30102 1/2"-0” Aggregate Surfacing, Including Haul, Watering, and Compaction Method ‘D’ 16 Cubic Yard $_________ $__________
40301 Asphalt Concrete Pavement 35 Ton $_________ $__________
55701 12’ Clear Width x 95’ Treated Timber Bridge Superstructure System Complete, Including Design, Fabrication, Transport, and Installation
1 Lump Sum $_________ $__________
55702 Treated Timber Bridge Substructure System Complete, Including Fabrication, Transport, and Installation
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 5
61101 3-Inch Diameter Class 52 Ductile Iron Pipe 91 Lineal Foot $_________ $__________
61102 4-Inch Diameter Class 52 Ductile Iron Pipe with Joint Restraints 126 Lineal Foot $_________ $__________
61103 Gate Valve, 3-Inch Diameter 2 Each $_________ $__________
61104 3-Inch Flange Tee 1 Each $_________ $__________
61105 3-Inch MJ 90-Degree Bend 2 Each $_________ $__________
61106 3-Inch Flange 22.5-Degree Bend 1 Each $_________ $__________
61107 4-Inch x 3-Inch Eccentric Flange Reducer 2 Each $_________ $__________
61108 4-Inch MJ 45-Degree Bend with Joint Restraints 1 Each $_________ $__________
61109 3-Inch MJ Transition Sleeve to Poly (Connection to Existing) 2 Each $_________ $__________
61110 Rodent-Proof Daylight Drain 1 Each $_________ $__________
61111 Design and Install Pipe Supports, Hangers, and Hardware for 4-Inch Diameter Class 52 Ductile Iron Waterline
63501 Temporary Traffic Control 1 Lump Sum $_________ $__________
TOTAL PRICE (ALL ITEMS) $__________________
There will be a pre-proposal meeting for this project:
MAY 20,2021
1100 MDT
Payment for Bond Premiums Payment for bond premiums in accordance with FAR Clause 52.232-5, Payment Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
Due to mail/delivery limitations as a result of the COVID-19 pandemic, quote guarantees must be submitted electronically via email with quotes. NO FAXES OR HARDCOPIES WILL BE
ACCEPTED.
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 6
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 Project Description:
Furnish all labor, equipment and materials necessary to accomplish the work under this contract. This project will replace the existing creosote-treated multi-span vehicle bridge that crosses Redfish Lake Creek at the outlet of Redfish Lake with a new narrower single span treated timber trail bridge. Construction will consist of 1) removing the existing approximately 30’ wide by 88’ long two-lane vehicle bridge including asphalt surfacing, treated railing and underlying superstructure members, treated abutment/pier substructure, abutment riprap, attached water/irrigation piping, and all other appurtenant existing bridge elements; 2) installing a new approximately 13’ wide by 95’ long treated timber trail bridge system set on new treated timber abutments having turned diameter timber rails/posts, a timber wear surface, new abutment riprap armoring, and which supports a new waterline for system connection/function; and 3) removing the existing bridge approach asphalt surfacing and installing new asphalt approaches including additional fill material and other miscellaneous improvements as required.
C-2 Project Location From Stanley, Idaho proceed south approximately four (4) miles on Idaho State Highway #75 to the junction with Forest Road 70214. Turn right onto Forest Road 70214 and proceed approximately 2.30 miles to the project location.
C-3 Use of Premises (Camping):
Camping for contract personnel will be permitted at the Barrier Rock Stockpile Site noted on the drawings and will be limited to a maximum of two camp trailers. If this site is used, then the Contractor shall supply the number of toilet facilities (porta-potty) necessary to serve the personnel who will be camping at this location.
Disturbance to the site shall be minimized, weed-free prevention practices shall be followed, and appropriate camp site cleanliness/etiquette shall be met.
C-4 Magnitude of Construction Project
The Government's estimate is between $250,000 and $500,000
C-5 Technical Specifications
Standard Specifications (FP-14) and attached Forest Service Supplemental Specifications (FSSS) are applicable to this Public Works contract. All applicable FSSS are included in full text. All specifications not included in the specification listing but referenced by listed specifications are applicable. Standard Specifications (FP-14) are available in pdf format on-line at https://highways.dot.gov/federal-lands/specs
C-6 Bio Based Products
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Bio Based and Sustainable Product Procurement,” dated February, 2012 to provide bio based products.
All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and https://highways.dot.gov/federal-lands/specs
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 7 standards, and to the extent feasible and reasonable; include the exclusive use of bio based and recycled products.
The following is a list of categories for bio preferred products that are required for performance of this construction contract:
Equipment Lubricants, Hydraulic Fluids, Fuel Additives, Engine Oils, Office Products (Ink, paper, cleaning products) For more information regarding the Department of Agriculture Bio Based Program go to:
http://www.biopreferred.gov.
C-7 AGAR 452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C-8 AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C-9 Gov’t Furnished Material Summary
Government will provide two approved pump screens, if available, of varying sizes as follows:
1. Small Screen 6” diameter, 24” length, threaded connection Estimated value = $200
2. Large Screen 10” diameter, 36” length, threaded connection Estimated value = $350 http://www.biopreferred.gov/
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 8
SECTION D--PACKAGING AND MARKING
D-1 Packing and Marking All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.
D-2 Project Labeling for Official Correspondence The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 9
SECTION E--INSPECTION AND ACCEPTANCE
E- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - https://www.acquisition.gov/far and the Agriculture Acquisition Regulations – www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996) 52.246-13.1 Inspection--Dismantling, Demolition, or Removal of Improvements (AUG 1996)
E-2 Pre-Final and Final Inspection
a. Pre-final Inspection: The Government may, at its own discretion, conduct a pre-final inspection prior to the contractor requesting a final inspection. Any discrepancies noted shall be corrected prior to final inspection.
b. Final Inspectio n: When the work is ready for final inspection, the Contractor shall submit a written request for the final inspection to the duly assigned Contracting Officer’s Representative at least seven (7) days prior to the desired final inspection date. The final inspection will be performed with the Contractor by the appropriate Government personnel. If any discrepancies are noted, they shall be handled in accordance with 52.246-12.
https://www.acquisition.gov/far http://www.usda.gov/procurement/policy/agar.html
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 10
SECTION F--DELIVERIES OR PERFORMANCE
F- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - https://www.acquisition.gov/far and the Agriculture Acquisition Regulations – www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.211-13 Time Extensions (Sept 2000) 52.242-14 Suspension of Work (APR 1984)
F- 2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10-calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than noted below. The time stated for completion shall include final cleanup of the premises.
Start Date:
June 21, 2021 – anticipated start date for administrative and construction preparation tasks.
September 27, 2021 – anticipated start date for on-the-ground construction.
End Date:
The Project End Date will be June 30, 2022
F-3 FAR 52.211-12 Liquidated Damages -- Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,354 maximum for each calendar day of delay until the work is completed or accepted.
These figures are estimated to be the maximum charges to be assessed because of a delay in completing the work within the contract time. Actual charges will probably not include the CO, COR and Inspector all working full time on the project, two per diem charges, etc.
CO (Morthland) cost per day $376 COR (Richins) cost per day $370 Inspector cost per day $370
Per diem Lodging $60 + taxes $7 = $67
Subtotal $98/day x 2 people $196 Vehicle $0.22/mile x 154 miles + $8/day for one-way trip $ 42
Total daily charges $1,354
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
https://www.acquisition.gov/far http://www.usda.gov/procurement/policy/agar.html
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 11
SECTION G--CONTRACT ADMINISTRATION DATA
G-1 Contract Administration
(a) CONTRACTING OFFICER means a person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings. The Contracting Officer signs all contractual documents, approves and signs all modifications to contracts, processes and approves payment requests, reviews and makes final decisions on contractual discrepancies, and administers the contract. The Contracting Officer is the only authorized individual to make changes to a contract.
(b) CONTRACTING OFFICER'S REPRESENTATIVE. The Contracting Officer will designate a representative, hereinafter referred to as the Contracting Officer's Representative (COR) or, alternatively, as the Engineer, who will provide on-the-ground administration for the Government. The COR will be designated in writing and a copy of the designation will be furnished to the Contractor before or at the pre-work conference. The Contractor is cautioned to read the COR designation because certain authority under the contract is reserved solely for the Contracting Officer.
The term "Contracting Officer" as used throughout the contract shall be interpreted to include the Contracting Officer's designated representative(s) acting within the limits of their delegation of authority.
(c) CONTRACTOR'S REPRESENTATIVE. Any representative of the Contractor shall be designated in writing.
The designation shall clearly indicate the name and limitations of authority, if any, of the representative.
G-2 Address of Correspondence
All correspondence, unless otherwise specified, shall be directed to:
karen.morthland@usda.gov
Note: Include Contract Number on all correspondence mailto:kmorthland@fs.fed.us
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 12
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-1 Key Personnel
The key personnel specified in the Offeror’s Technical Proposal are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract. No diversion shall be made by the Contractor without the written consent of the Contracting Officer: Provided that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by this clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.
H-2 AGAR 452.236-77 Emergency Response (NOV 1996)
(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, Protection Of Existing Vegetation, Structures, Equipment, Utilities, And Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
( c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire-fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4
H-3 Contractor Performance Assessment Reporting System (FEB 2011)
(a) General. This contract is subject to Federal Acquisition Regulations (FAR), Agriculture Acquisition Regulations (AGAR), and Forest Service Acquisition Regulations (FSAR) that require past performance evaluations to be completed and entered into the Contractor Performance Assessment Reporting System (CPARS).
(b) Contact Information. At the Prework Meeting, the name and email address of the Contractor Representative will be required.
(c) Assessment. Upon completion of the work associated with the contract/delivery orders (including prior to any renewal options exercised), an evaluation will be initiated by the Contracting Officer in the CPARS system and the Contractor Representative will receive an auto-email from CPARS with instructions for completion of the evaluation.
H-4 Incidental Payment Items
The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items.
All other work and materials will be considered as incidental to and included in the payment for items shown.
H-5 Conformity with Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 13 the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
H-6 Samples, Tests, Cited Specifications
Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.
H-7 Barricades, Warning Signs, and Other
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.
H-8 Weed-Free Equipment
In order to prevent the potential spread of noxious weeds into the project area, the Contractor shall be required to furnish the Contracting Officer with proof of weed-free equipment.
The following is considered proof of weed-free equipment:
The Contractor will be required to clean all construction equipment (equipment that operates off existing roads) prior to entry on the project area. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the project area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within the project area. All subsequent move-ins of construction equipment shall be treated the same as the initial move-in.
Prior to initial move-in of all construction equipment, and all subsequent move-ins, the Contractor shall make equipment available for inspection at an agreed location.
H-9 AGAR 452.215-73 Postaward Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award.
FIRE PROTECTION AND SUPPRESSION PLAN
This plan outlines the channels of responsibility for fire prevention and suppression activities and sets up an attack procedure in the event of fire within the Project Area. The Project Area is defined as that area which is in and adjacent to the project rights-of-way and work areas and all roads used in connection with the work.
Responsibilities A. Contractor Fire Suppression
1. It is understood and agreed that the Contractor will do all in his power to prevent and suppress fires on or adjacent to the Project Area, as stipulated in the contract.
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 14
2. Is responsible for and will direct all fires activities on the project until relieved by a Forest Officer and will insure that prevention and suppression action are in accordance with contract requirements, including this fire plan. He will delegate the next higher in authority on the job to be responsible for the above activities when he is not on the project.
3. In line with this agreement, men will be supplied from the Contractor's crew to fight fires on the project area up to the total number of men employed by the Contractor as they are needed by the Fire Boss. The Forest Service will make every effort to avoid calling on the Contractor for action on fires outside the Contract project area except in emergencies and will call out all needed available help to control fires in the general area.
4. The Contractor issures that this Fire Plan will be complied with by him and his employees for the duration of the contract.
B. Forest Service District Ranger
1. Is responsible for all fire activities on the Ranger District on which the contract project is located. He or his representative will discuss the fire plan with the Contractor and will discuss with him the equipment and manpower action to be taken when a fire occurs. He will notify the Contractor through the Contracting Officer's Representative (COR) to take correction measures when fire requirements are not complied with.
Contractor's Responsibility When A Fire Occurs Within The Contract Project Area
A. Will immediately send the entire contract crew with tools and equipment to the fire and take initial-attack suppression action.
B. Immediately notify the nearest Forest Service Fire Control Officer or other Forest Service employee of fire location and action taken.
C. Designate an employee to act as dispatcher who will handle messages and initiate action upon request until relieved.
Contractor Furnished Manpower, Tools, And Equipment Required On All Contracts (Projects) During Fire Season A. The Contractor shall furnish to the COR a list of manpower and equipment used on the contract on forms furnished by the Forest Service. Changes in Contractor's personnel shall be reflected in amendment to the list.
Fire Prevention
Smoking. Will be prohibited in the woods during the fire season, May 10 through October 20, except in areas agreed upon by the Contractor and Contracting Officer's Representative. No smoking is permitted while walking or working in the woods.
Refueling Chainsaw/Soil Auger. Refueling will be confined to a six-foot diameter cleared to mineral earth. Chainsaws/soil auger sparks arrester shall be U.S. Forest Service approved, and will be cleaned daily. A size "0" or larger round-pointed shovel with a minimum of a 38-1/2" handle and a fire extinguisher shall be within 10 feet of actual point of chainsaw/soil auger operation.
Burning, Blasting, or Welding. Permit will be required and will contain special stipulations pertinent to the particular job.
Spark Arresters. All internal combustion power equipment used by the Contractor on the project shall be equipped with an approved spark arrester as set forth in the publication of the USDA Forest Service, entitled "Standard 5100-1a for Spark Arresters for Internal Combustion Engines" as amended under date of July 1970, and be listed in the most recent "Spark Arrester Guide" as having been approved as meeting above standard. They shall be cleaned regularly and maintained in satisfactory working condition. The following are exempt from the requirements of the rule:
1. Turbo-charged internal combustion engines in which 100 percent of the exhaust gasses pass through a turbo-charged;
2. Engines of passenger carrying vehicles and light trucks equipped with a muffler with baffles that are kept in good repair (glass packs are not an approved muffler for wildland work);
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 15
3. Water pumping equipment used in firefighting.
Spark arresters must comply with all State and Federal fire requirements.
Lunch and Warming Fires. Cooking and warming fires will not normally be permitted and then only by written permit by the COR which contain stipulations regulating use of such fires.
Hand Tools. The Contractor shall furnish one size "0" shovel (38-1/2" handle minimum) or larger, one axe, or pulaski with 26" handle or larger, and one 5 BC or larger rated pressurized fire extinguisher for each truck, each personal vehicle, each tractor, and each grader. For each welder he shall furnish one size "0" shovel and one backpump pump. For each gasoline power tools (power saw, soil auger, etc.), one shovel (38-1/2" handle minimum) and one 8-ounce or larger BC rated chemical-pressurized fire extinguisher.
Contractor shall also furnish any other equipment called for elsewhere in the contract. The shovel and fire extinguisher will be located within 10feet of the operating chainsaw/power auger.
Storage and Parking Areas. Equipment service area, parking area, and gas and oil drum storage areas will be cleared of all flammable material for a radius of at least fifty feet. These areas must be approved in writing by the Contracting Officer's Representative in advance of use. Small stationary engine sites shall be cleared of flammable material for a radius of at least fifteen feet from such engine.
Fire Toolbox. A red fire toolbox will be required to be on each work site while work is being performed. This fire toolbox will contain sufficient tools to equip all persons engaged in Contractor's operation. Fire tools shall be used only for suppressing wildfires. Tools shall be stored in fireboxes provided by the Contractor and readily available to employees.
Each toolbox shall be marked, "Tools for Fire Only." The COR will inspect the fire toolbox and then seal the box.
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 16
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses:
https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses:
https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at:
https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
(MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform Employees of Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 17
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors
52.209-9
Debarred, Suspended, or Proposed for Debarment (JUN 2020) Updates of Publicly Available Information Regarding Responsibility Matters
52.209-10
(OCT 2018)
Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015)
52.215-2 Audit and Records -- Negotiation (JUN 2020) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020)
52.219-8 Utilization of Small Business Concerns (OCT 2018) 52.219-28 Post Award Small Business Program Rerepresentation (NOV 2020) 52.222-3 Convict Labor (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY
52.222-6
2018) Construction Wage Rate Requirement (AUG 2018)
52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations
52.222-14
(MAY 2014)
Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately
52.222-35
Specified Pricing Method) (AUG 2018) Equal Opportunity for Veterans (JUN 2020)
52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC
52.222-50
2010) Combating Trafficking in Persons (OCT 2020)
52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages under Executive Order 13658 (NOV 2020) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2017) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction
52.223-3
Contracts (SEP 2013) Hazardous Material Identification and Material Safety Data Alt 1 (JAN 1997)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001)
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 18
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.223-20 Aerosols (JUN 2016) 52.223-21 Foams. (JUN 2016) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.229-4 Federal, State,and Local Taxes (State and Local Adjustments) (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) Alternate I (APR 1984) Alternate II (APR 1984) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007)
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 19
52.244-6 Subcontracts for Commercial Items (NOV 2020) (DEVIATION APR 2020) 52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)-- Alternate I (SEP 1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984) Alternate I (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991) 452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) 452.236-71 Prohibition against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
52.219-14 Limitations on Subcontracting (MAR 2020)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Applicability. This clause applies only to—
(1) Contracts that have been set aside for small business concerns or 8(a) participants;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants;
(3) Orders set aside for small business concerns or 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F); and
(4) Orders issued directly to small business concerns or 8(a) participants under multiple-award contracts as described in 19.504(c)(1)(ii).
(c) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of the contract in the case of a contract for—
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
(2) Supplies (other than procurement from a non-manufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.
(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
(d) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraph (b)(1) and (2) of this clause— ☐ By the end of the base term of the contract and then by the end of each subsequent option period; or ☒By the end of the performance period for each order issued under the contract.
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 20
(2) For orders, in accordance with paragraphs (b)(3) and (4) of this clause, by the end of the performance period for the order.
52.225-9 Buy American Act-Construction Materials (MAY 2014)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if— https://acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 21
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which non-availability determinations have been made are treated as domestic;
or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and http://uscode.house.gov/ http://uscode.house.gov/ https://acquisition.gov/far/current/html/Subpart%2012_5.html#wp1077123
12-40LT-21-R-0003 REDFISH LAKE OUTLET TRAIL BRIDGE CONSTRUCTION PROJECT 2021 Page 22
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .