This document provides details on an amendment to plans and specifications for the Redfish Lake Outlet Trail Bridge Construction Project 2021 federal contract opportunity. The amendment extends the change proposal due date to June 15, 2021 and requires the new waterline be fully installed, tested, and ready for use by May 20, 2022. It also clarifies that for glulam members, Southern Yellow Pine can substitute for Douglas Fir if meeting specified combination symbols, and requires the contractor submit documentation and show a proposed waterborne preservative meets AWPA Use Category 3B for the bridge railing. The federal contract opportunity is to completely construct a new approximately 13' wide by 95' long treated timber trail bridge to replace an existing 30' wide two-lane vehicle bridge over Redfish Lake Creek. The project includes removing the existing bridge, installing the new bridge system on new treated timber abutments, installing asphalt approaches and other improvements. The location is in Idaho's Sawtooth National Forest. The anticipated project start date is September 13, 2021 and end date is June 30, 2022, with an estimated price range of $250,000 to $1,000,000. The contracting agency is the USDA Forest Service Region 4 Intermountain Region.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT #1

Redfish Lake Outlet Trail Bridge Construction Project, 2021

Change proposal due date to June 15, 2021 at 1200 MDT

The following changes have been made to the plans and specifications for the above-named project.

Please incorporate the following information into your bid.

Section F – Deliveries or Performance F-2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work

(APR 1984)

Under “End Date:”, add the following:

New waterline shall be fully installed, tested, and ready for in-service use by May 20, 2022.

Supporting Document – A Project Plans/Drawings/Specifications

Project Plans, Drawing 9 of 17 Lumber Notes

Timber & Lumber

Under the first paragraph titled Timber & Lumber, add the following clarifications:

“For glulam members only, all references to Douglas Fir (DF/DF) wood species shall also include Southern Yellow Pine (SP/SP). If substituting with SP/SP, glulam girders shall conform to Combination Symbol 24F-V3 and all other glulam members shall conform to Combination Symbol #50.”

Supporting Document – A Project Plans/Drawings/Specifications

Project Plans, Drawing 9 of 17 Lumber Notes

Treatment

Under the second paragraph titled Treatment, add the following under “Bridge Railing (Posts, Rails, Blocking):

“- Waterborne Preservative Contractor shall submit documentation for Contracting Officer’s review/approval for intended waterborne preservative along with show that it meets intended AWPA Use Category System (U1) for Use Category 3B Above Ground – Exposed (UC3B).”