Redfish Lake Outlet Trail Bridge Construction Project 2021

Closed Pre-Solicitation Posted

Solicitation number
12-40LT-21-R-0003
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Stanley ID 83278, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks to completely construct a new approximately 13-foot wide by 95-foot long treated timber trail bridge to replace an existing 30-foot wide, 88-foot long two-lane creosote-treated vehicle bridge over Redfish Lake Creek in central Idaho's Sawtooth National Forest. The United States Department of Agriculture Forest Service Intermountain Region is the contracting agency, with proposals due by June 8, 2021. Evaluation criteria will consider technical qualifications, past performance, price, and compliance with requirements outlined in the plans, specifications, and drawings attached to the solicitation. The anticipated period of performance is from September 13, 2021 to June 30, 2022.

The set-aside designation for this procurement is total small business. The primary NAICS code is 237990 and PSC code is W912. Proposals should be priced between $250,000 to $1,000,000 to completely construct the replacement bridge, remove the existing structure, install asphalt approaches, and perform other miscellaneous site work. The pre-bid sign-in sheet and meeting summary identify potential offerors' interest in the work.

Notice text

2 versions

Update #2 · Latest ·

The intent of the contract is to provide for the complete construction of the project described in the contract.  Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract.

This project will replace the existing creosote-treated multi-span vehicle bridge that crosses Redfish Lake Creek at the outlet of Redfish Lake with a new narrower single span treated timber trail bridge.  Construction will consist of 1) removing the existing approximately 30’ wide by 88’ long two-lane vehicle bridge including asphalt surfacing, treated railing and underlying superstructure members, treated abutment/pier substructure, abutment riprap, attached water/irrigation piping, and all other appurtenant existing bridge elements; 2) installing a new approximately 13’ wide by 95’ long treated timber trail bridge system set on new treated timber abutments having turned diameter timber rails/posts, a timber wear surface, new abutment riprap armoring, and which supports a new waterline for system connection/function; and 3) removing the existing bridge approach asphalt surfacing and installing new asphalt approaches including additional fill material and other miscellaneous improvements as required.

Project Location:

From Stanley, Idaho proceed south approximately four (4) miles on Idaho State Highway #75 to the junction with Forest Road 70214.  Turn right onto Forest Road 70214 and proceed approximately 2.30 miles to the project location.

Start Date:

The anticipated Project Start Date is September 13, 2021

End Date:

The Project End Date will be June 30, 2022

Estimated Price Range – Between $250,000 to $500,000

Funding IS available for this project.

Update #1 ·

The intent of the contract is to provide for the complete construction of the project described in the contract.  Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract.

This project will replace the existing creosote-treated multi-span vehicle bridge that crosses Redfish Lake Creek at the outlet of Redfish Lake with a new narrower single span treated timber trail bridge.  Construction will consist of 1) removing the existing approximately 30’ wide by 88’ long two-lane vehicle bridge including asphalt surfacing, treated railing and underlying superstructure members, treated abutment/pier substructure, abutment riprap, attached water/irrigation piping, and all other appurtenant existing bridge elements; 2) installing a new approximately 13’ wide by 95’ long treated timber trail bridge system set on new treated timber abutments having turned diameter timber rails/posts, a timber wear surface, new abutment riprap armoring, and which supports a new waterline for system connection/function; and 3) removing the existing bridge approach asphalt surfacing and installing new asphalt approaches including additional fill material and other miscellaneous improvements as required.

Project Location:

From Stanley, Idaho proceed south approximately four (4) miles on Idaho State Highway #75 to the junction with Forest Road 70214.  Turn right onto Forest Road 70214 and proceed approximately 2.30 miles to the project location.

Start Date:

The anticipated Project Start Date is September 13, 2021

End Date:

The Project End Date will be June 30, 2022

Estimated Price Range – Between $250,000 to $1,000,000

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 Coeur d Alene, Idaho, United States · NAICS 237310 Federal Highway Administration No set-aside
GRSM 321788 - Oconaluftee River Trail NAICS 237310 — No set-aside
Purchase of 2 or 3 Temporary Road Bridges Duluth, Minnesota 55808, United States · NAICS 332312 Forest Service No set-aside
YELL 338223 - Bridge Preservation NAICS 237310 National Office No set-aside
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah Beaver, Utah 84713, United States · NAICS 237990 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity