1240LS26Q0002 GAOA 4GG Mesa Falls Trail Head Gravel_Attachment 2 - Statement of Work.pdf

PDF 115 KB Posted

Attached to
GAOA 4GG Mesa Falls Trail Head Gravel
Solicitation number
1240LS26Q0002
Issued by

About this file

This is a Statement of Work (SOW) for a federal construction contract with the U.S. Forest Service for the Caribou-Targhee National Forest.

The contractor is required to furnish, haul, and stockpile 1,200 cubic yards of surface aggregate at the Mesa Falls Trailhead in the Ashton/Island Park Ranger District, located approximately 16 miles northeast of Ashton, Idaho (coordinates 44.196297, -111.321450). The work must be performed between September 8, 2026, and November 14, 2026. The contractor is responsible for purchasing and delivering the material, with all staging and storage areas subject to approval by the Contracting Officer's Representative (COR). Prior to site entry, all equipment must be thoroughly cleaned and inspected by the Forest Service to prevent transportation of noxious weeds in compliance with federal and state regulations, requiring a minimum of seven business days' notice to the COR. The contractor must verify and protect all existing utilities and adjacent federal property. The SOW specifies that toilet facilities are not available at the site, and the contractor acknowledges responsibility for investigating site conditions and general local conditions affecting the work and cost. All site condition requirements are considered incidental to the contract with no direct payment provided for these items.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1240LS26Q0002 – GAOA 4GG Mesa Falls Trailhead Gravel Attachment 2 – Statement of Work

SECTION 3.0 - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-1

Section 3.0 - Description/Specifications/Statement of Work

0415 GAOA 4GG CONSTRUCTION MESA FALLS TRAILHEAD GRAVEL 3

Caribou-Targhee National Forest

1.1 SCOPE OF CONTRACT

A. FURNISH/HAUL/STOCKPILE SURFACE AGGREGATE The work includes purchasing, delivery, and stockpile of 1200 cubic yards of surface aggregate at location as marked by FS.

1.2 PROJECT LOCATION

A. The project is located in the Ashton/Island Park Ranger District of the Caribou-Targhee National Forest, Fremont County, Idaho, in Section 13 Township 10 North, Range 43 East. It is located approximately 16 miles Northeast of Ashton, Idaho. The project may be accessed from State Highway ID-47 (Mesa Falls Scenic Byway/Old Highway 47 Scenic) and Forest Road 20295/Upper Mesa Falls Road.

(44.196297, -111.321450)

1.3 SITE INFORMATION AND LIMITATIONS

A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:

1. Thorough cleaning of all equipment shall be performed by contractor, prior to entry into federal lands. Inspection of all thorough cleaned equipment is required and will be performed by the FS with a minimum of 7 business days notifications to the COR. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.

2. Contractor shall verify and protect all existing utilities and adjacent federal property.

3. Toilet facilities are NOT available at the site.

1.4 WORK CAMPS, STAGING AND STORAGE AREAS

A. Areas for staging operations and storage of materials shall be approved by the COR.

1.5 INSPECTION OF WORKSITE

A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.

1.6 START DATE

A. Scope of work on site to be performed between 09/08/2026, and completed by 11/14/2026.

1.7 CONTRACT TIME

A. Base Item: 09/08/2026-11/14/2026.

END OF SECTION 3.0