1240LP26Q0151 A0001.pdf
PDF 163 KB Posted
- Attached to
- BHNF Remove and replace electric water heater Federal contract opportunity
- Solicitation number
- 1240LP26Q0151
About this file
This is an Amendment of Solicitation (Amendment 0001) to solicitation 1240LP26Q0151 issued by USDA-FS CSA Intermountain 4, located in Ogden, Utah. The amendment is effective August 31, 2026, and contains a Questions and Answers section addressing clarifications to the Statement of Work for a single, one-time removal and replacement of an electric water heater at Black Hills National Forest (BHNF).
The project scope involves replacing an A.O. Smith Gold Xi Series DVE-80A 100 electric water heater, with the government accepting equivalent commercial units from other manufacturers that meet or exceed all stated specifications. Key clarifications include: no concrete base work is required as the unit will be installed directly on the existing concrete floor in the ground floor mechanical room; no formal site visit is scheduled; no additional permits are required, though the contractor must be a South Dakota state licensed plumber; there is a single, one-time replacement with no recurring services or additional base-period requirements; no known delivery access restrictions exist; and the removal/installation access route does not include stairs. Working hours are standard federal government hours, with building access and water/electrical shutdown scheduling to be coordinated with the contracting officer representative. Contractors should note that the basis of design specification is provided as reference, but equivalent products meeting all stated specifications are acceptable.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C04d WD 2015-5367 r32.pdf | ||
| C04b IMG_0859.JPG | JPG image | |
| C04_1240LP26Q015.pdf | ||
| C04a Statement of Work.pdf | ||
| C04c IMG_0860.JPG | JPG image |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LP26Q0151
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LP
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 4
08/31/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/19/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See attached PDF for questions and answers.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STEPHEN D. HOLLY
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Questions and Answers Solicitation #1240LP26Q0151 - BHNF Remove and replace electric water heater:
Q 1: Clarification about the Statement of Work B5- “Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch (450-mm) centers around the full perimeter of concrete base.
For supported equipment, install epoxy-coated anchor bolts that extend through concrete base and anchor into structural concrete floor.”
A1: There is no concrete base for this installation, so those references are to be considered deleted. The water heater is to be installed on the existing concrete floor. No concrete work will be required with this installation. The water heater will be supported by the existing concrete floor.
Q2: Is there a site visit scheduled?
A2: No formal site visit is scheduled.
Q3: The SOW identifies the A.O. Smith Gold Xi Series DVE-80A 100 as the basis of design.
Will the Government accept an equivalent commercial water heater from another manufacturer if it meets or exceeds all stated specifications?
A3: Yes, the government will accept an equivalent commercial water heater from another manufacturer if it meets or exceeds all stated specifications listed in the SOW.
Q4: Are any permits or inspections required for this project? If so, should those costs be included in the firm-fixed price, and may the contractor’s licensed subcontractor obtain the required permits?
A4: No additional permits are required. The contractor must be a South Dakota state licensed plumber.
Q5: The solicitation references a “2-month base period,” while the SOW appears to describe a one-time removal and replacement project. Can you please confirm that this is a single, one-time water heater replacement with no recurring services or additional base-period requirements?
A5: This is a single, one-time water heater replacement with no recurring services or additional base-period requirements.
Q6: Are there any restrictions regarding delivery access, working hours, building access, or scheduling of water/electrical shutdowns that should be considered when preparing the quote?
A6: There are no known delivery access issues. Working hours are standard for the federal government. Building access and scheduling of water/electrical shutdowns will be coordinated with the contracting officer representative’s schedule.
Q7: Please confirm the exact room/floor where the existing water heater is located and whether stairs are required anywhere along the removal and installation access route?
A7: The water heater is in the ground floor mechanical room. The removal/installation route does not include stairs at any point.