This is a Schedule of Items for a federal contract proposal for fencing work on the Colville National Forest/Three Rivers Ranger District, effective February 19, 2026.

The project encompasses three segments of fencing construction within the Boulder Grazing Complex, totaling 6,600 linear feet across 1.25 miles. Segment #1 involves creation of a new Bulldog/Cabin Pasture (0.5 miles, 2,640 feet) with four-strand barbed wire/steel post fence construction. Segment #2 addresses the Bulldog/Renner Drift Fence (0.25 miles, 1,320 feet) also utilizing four-strand barbed wire/steel post fence. Segment #3 covers the West Boundary Drift Fence in the Snowcap Allotment (0.5 miles, 2,640 feet) with three-strand barbed wire/steel post fence. Each segment includes identical work tasks: clearing the fence right-of-way of trees and brush (12 feet total width), removing and disposing of damaged or unusable existing fence material, providing all required materials for new fence construction, and constructing the new fence. The document provides estimated quantities in linear feet for each task but leaves the estimated unit prices per foot and estimated total amounts blank for contractor pricing. The total contract proposal cost is established at $42,042.00, with this amount to be distributed across the three segments based on contractor pricing submissions.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment #1 Schedule of Items for Boulder Grazing Complex Fencing

Colville National Forest/Three Rivers Ranger District 02/19/2026

Item Number Description Estimated

Quantity (ft.)

Estimated Unit Price Per Ft ($)

Estimated Total Amount ($)

#1, 2013 Boulder Grazing Complex, Creation of new Bulldog/Cabin Pasture

48.848776, - 118.347851

0.5 miles

Clearing the fence Right of Way (ROW) of trees and brush at 6ft either side of the fence for a total of 12ft.

2,640 Feet

Remove and dispose of damaged or unusable existing fence material.

Provide all material need to construct new 4 strand fence.

Construct new 4 strand barb wire/steel post fence.

Segment #1 Total Cost

Estimated

Unit Price Per Ft. ($)

Estimated Total Amount ($)

#2, 2013 Boulder Grazing Complex, Bulldog/Renner Drift Fence

48.821056, - 118204548

0.25 miles

Clearing the fence Right of Way (ROW) of trees and brush at 6ft either side of the fence for a total of 12ft.

1,320 Feet

Provide all material need to construct new 4 strand

Construct new 4 strand barb wire/steel post fence.

Segment #2 Total Cost

Estimated Unit Price Per Ft. ($)

Estimated Total Amount ($)

#3, 2013 Boulder Complex, West Boundary Drift Fence, Snowcap Allotment

48.862060, - 118.439611

0.5 miles

Clearing the fence Right of Way (ROW) of trees and brush at 6ft either side of the fence for a total of 12ft.

Provide all material need to construct new 3 strand fence.

Construct new 3 strand barb wire/steel post

Segment #3 Total Cost

Total Cost of Contract Proposal by Segment Segment #1 Total Cost

Segment #2 Total Cost

Segment #3 Total Cost

Total Cost of Contract Proposal = $42,042.00