Attachment 1 Schedule of Items for Boulder Grazing Complex Fencing_V2.pdf
PDF 231 KB Posted
- Attached to
- Boulder Grazing Complex Fence Projects
- Solicitation number
- 1240BJ26Q0018
About this file
This is a Schedule of Items for a federal contract proposal for fencing work on the Colville National Forest/Three Rivers Ranger District, effective February 19, 2026.
The project encompasses three segments of fencing construction within the Boulder Grazing Complex, totaling 6,600 linear feet across 1.25 miles. Segment #1 involves creation of a new Bulldog/Cabin Pasture (0.5 miles, 2,640 feet) with four-strand barbed wire/steel post fence construction. Segment #2 addresses the Bulldog/Renner Drift Fence (0.25 miles, 1,320 feet) also utilizing four-strand barbed wire/steel post fence. Segment #3 covers the West Boundary Drift Fence in the Snowcap Allotment (0.5 miles, 2,640 feet) with three-strand barbed wire/steel post fence. Each segment includes identical work tasks: clearing the fence right-of-way of trees and brush (12 feet total width), removing and disposing of damaged or unusable existing fence material, providing all required materials for new fence construction, and constructing the new fence. The document provides estimated quantities in linear feet for each task but leaves the estimated unit prices per foot and estimated total amounts blank for contractor pricing. The total contract proposal cost is established at $42,042.00, with this amount to be distributed across the three segments based on contractor pricing submissions.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment #1 Schedule of Items for Boulder Grazing Complex Fencing
Colville National Forest/Three Rivers Ranger District 02/19/2026
Item Number Description Estimated
Quantity (ft.)
Estimated Unit Price Per Ft ($)
Estimated Total Amount ($)
#1, 2013 Boulder Grazing Complex, Creation of new Bulldog/Cabin Pasture
48.848776, - 118.347851
0.5 miles
Clearing the fence Right of Way (ROW) of trees and brush at 6ft either side of the fence for a total of 12ft.
2,640 Feet
Remove and dispose of damaged or unusable existing fence material.
Provide all material need to construct new 4 strand fence.
Construct new 4 strand barb wire/steel post fence.
Segment #1 Total Cost
Estimated
Unit Price Per Ft. ($)
Estimated Total Amount ($)
#2, 2013 Boulder Grazing Complex, Bulldog/Renner Drift Fence
48.821056, - 118204548
0.25 miles
Clearing the fence Right of Way (ROW) of trees and brush at 6ft either side of the fence for a total of 12ft.
1,320 Feet
Provide all material need to construct new 4 strand
Construct new 4 strand barb wire/steel post fence.
Segment #2 Total Cost
Estimated Unit Price Per Ft. ($)
Estimated Total Amount ($)
#3, 2013 Boulder Complex, West Boundary Drift Fence, Snowcap Allotment
48.862060, - 118.439611
0.5 miles
Clearing the fence Right of Way (ROW) of trees and brush at 6ft either side of the fence for a total of 12ft.
Provide all material need to construct new 3 strand fence.
Construct new 3 strand barb wire/steel post
Segment #3 Total Cost
Total Cost of Contract Proposal by Segment Segment #1 Total Cost
Segment #2 Total Cost
Segment #3 Total Cost
Total Cost of Contract Proposal = $42,042.00