Updated Section B_Schedule of Items _GAOA Ideal Cove Trail -_12032021 cj.pdf

PDF 110 KB Posted

Attached to
Trail Reconstruction for the Ideal Cove Trail - Tongass National Forest
Solicitation number
1240BJ22R0001
Issued by

About this file

This solicitation is for the reconstruction of the Ideal Cove Trail located on Mitkof Island in the Tongass National Forest in Alaska. The base bid involves demolishing approximately 0.8 miles of existing boardwalk and wood structures, salvaging reusable lumber, and installing new aggregate surfacing, boardwalks, retaining logs, stonework, concrete steps, and a new Saltwater Trailhead rest area. The optional items include replacing an existing footbridge and adding two aggregate surface rest areas. Bids are due by January 2022 and award is subject to fund availability with an estimated period of performance through November 2022. The government estimate for the work is between $500,000 and $1,000,000. A pre-bid conference will be held on November 30, 2021. The solicitation is issued by the USDA Forest Service for a project located approximately 25 miles by road and 2 miles by trail from Petersburg, Alaska.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1 - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

GAOA Ideal Cove Trail Reconstruction Petersburg Ranger District, Tongass National Forest Petersburg, Alaska

B.1 SCHEDULE OF ITEMS

NOTE: Offerors must provide an offer on ALL ITEMS, INCLUDING ALL ADDITIVE ITEMS.

PAY DESCRIPTION METHOD OF EST. UNIT TOTAL

ITEM MEASUREMENT* QTY. UNIT PRICE AMOUNT

BASE BID: Trail Segment 0+00 thru 41+35

907(01) Mobilization LS 1 EA $ $____________

913(01) Demo/Removal/Recycling of wood trail structures LS 4150 LF $ $____________

937(01) Double Post Trail Map Sign Base LS 2 EA $ $____________

937(02) Boardwalk Type A (BW-A) AQ 1078 LF $ $____________

937(03) Boardwalk Type B (BW-B) AQ 67 LF $ $____________

937(04) Retaining Log (RL) AQ 37 LF $ $____________

937(05) Boardwalk Bridge (BWB) AQ 170 LF $ $____________

941(01) Aggregate Surfacing (AS) AQ 2554 LF $ $____________

941(02) Aggregate Surfacing AQ 123 EA $ $____________ w/ Corduroy (ASC)

941(03) Ditching AQ 186 LF $ $____________

941(04) Stone Riser Step (SRS) AQ 2 EA $ $____________

941(05) Stone Retaining Wall (SRW) AQ 81 SF $ $____________

941(06) Stone Open Drain (SOD) AQ 17 EA $ $____________

941(07) Stone Pitching (SP) AQ 46 LF $ $____________

941(08) Rootwad Spur Rest Area LS 7 EA $ $____________

941(09) Saltwater Trailhead Rest Area LS 1 EA $ $____________

942(01) Concrete Step (CS) AQ 42 EA $ $____________

980(01) Naturalize Abandoned Trail Bed LS 150 LF $ $____________

TOTAL BASE BID PRICE: $

OPTION ITEM #1:

941(10) Stone Bench Rest Areas 1 & 2 LS 1 EA $ $____________

TOTAL OPTION ITEM #1: $

TOTAL BASE AND ALL OPTION ITEMS: $

* METHOD OF MEASUREMENT: AQ = ACTUAL QUANTITIES; DQ = DESIGNED QUANTITIES;

LSQ = LUMP SUM QUANTITIES; VQ = VEHICLE QUANTITIES

BIDDER: (TEL.NO.) ________________________

BY: ______________________________________________________________________

(Signature) (Title) (Date)

OFFEROR MUST ALSO COMPLETE "OFFER" PORTION ON PAGES 2 & 3 OF STANDARD FORM 1442.

File details come from the government source that posted it. Updated .