Updated_GAOA Ideal Cove Trail_Drawings_NoBrdg_12032021 cj.pdf

PDF 5 MB Posted

Attached to
Trail Reconstruction for the Ideal Cove Trail - Tongass National Forest
Solicitation number
1240BJ22R0001
Issued by

About this file

This solicitation is for the reconstruction of approximately 0.8 mile of the Ideal Cove Trail located on Mitkof Island in the Tongass National Forest in Alaska. Major work items include demolishing existing structures such as step-and-run boardwalks, salvaging suitable lumber, and installing new trail structures including aggregate surfacing, boardwalks, retaining logs, stone pitching, stone and concrete steps. Optional items include demolishing an existing 60 foot long log stringer bridge and installing a new bridge, as well as adding two mid-trail rest areas. The estimated price range for the base work is between $500,000 and $1,000,000. The pre-bid conference is scheduled for November 30, 2021, with an estimated period of performance of January 2022 through November 2022. The soliciting agency is the United States Department of Agriculture Forest Service.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12" OR AS SHOWN IN TRAIL LOG

PROVIDE 3" MIN. AGGREGATE

SURFACING BEDDING IF STONES DO

NOT BEAR ON MINERAL SOIL

SIDE STONES

S

EE

T

RA

IL

LO

G

BED SIDE STONES

6" MIN BELOW

BOTTOM OF DRAIN

APPROACH TRAIL 2

12"

FL

O

W

LENGTH AS REQ'D TO SPAN

TRAIL AND CONTAIN AS

MATERIAL EACH SIDE

12"x12" DRAINAGE DITCH

TO DAYLIGHT

PLAN VIEW

SECTION VIEW

NOT TO SCALE

NOT TO SCALE

STONE OPEN DRAIN (SOD)

IDEAL COVE TRAIL RECONSTRUCTION DATE:

DATE:

DATE:

AUTOCAD FILENAME:

SHEET OF

DRAWN:

USDA FOREST SERVICE

PETERSBURG RANGER DISTRICT

TONGASS N.F.

CHECKED:

DESIGNED: SOD.DWG

__/2021__

05/2017BH,CJ

05/2017FSSTANDARD,BH,CJ

· SELECT STONES FOR FIT

· BED SIDE STONES FOR FULL STABILITY; ANGLE STONES BACK INTO

ADJACENT TRAIL BED AS SHOWN TO PREVENT TIPPING INTO SOD

WITH USE.

· TOP OF SIDE STONES TO BE 1" ABOVE COMPACTED AGGREGATE

TRAIL

01b CoverSheet_Ideal Cove Trl Reconstr_12032021 cj
02 AS_Ideal Cove Trl Reconstr_12012021 cj
03 RL_Ideal Cove Trl Reconstr_12012021 cj
04 SP_Ideal Cove Trl Reconstr_12012021 cj
05 SRS_Ideal Cove Trl Reconstr_12012021 cj
06 CS_Ideal Cove Trl Reconstr_12012021 cj
07 CS_Ideal Cove Trl Reconstr_12012021 cj
08 SRW_Ideal Cove Trl Reconstr_12012021 cj
09 SOD_Ideal Cove Trl Reconstr_12012021 cj
10 DD_Ideal Cove Trl Reconstr_12012021 cj
11 BW-A_Ideal Cove Trl Reconstr_12012021 cj
12 BW-B_Ideal Cove Trl Reconstr_12012021 cj
13 BWB_Ideal Cove Trl Reconstr_12012021 cj
14 SignPosts_Ideal Cove Trl Reconstr_12012021 cj
14b SignPosts_Ideal Cove Trl Reconstr_12032021 cj
15 SW Trlhd_Ideal Cove Trl Reconstr_12012021 cj
15b SW Trlhd_Ideal Cove Trl Reconstr_12032021 cj
16 RA1_Ideal Cove Trl Reconstr_12012021 cj
17 RW Spur_Ideal Cove Trl Reconstr_12012021 cj
18 RA2_Ideal Cove Trl Reconstr_12012021 cj

File details come from the government source that posted it. Updated .