RevisedSheets6-9-23.pdf

PDF 924 KB Posted

Attached to
GAOA Anan Wildlife Observatory Reconstruction Phase 2
Solicitation number
1240BH23R0025
Issued by

About this file

This document package includes construction drawings and specifications for the Anan Wildlife Observatory Reconstruction project on the Tongass National Forest in Alaska, as well as the related federal contract solicitation.

The drawings show site plans, details, schedules, and specifications for the electrical work on the reconstruction project. Sheet one provides a site plan and legend, sheet two an enlarged plan of the observatory, and subsequent sheets include grounding and equipment details, a one-line diagram, and telecom plans. The solicitation is for phase two of the reconstruction and was issued on May 12, 2023 by the USDA Forest Service with a response deadline not specified. The opportunity is for further work on rebuilding the Anan Wildlife Observatory to specifications shown in the construction drawings provided.

View the file

Other files

File Type Posted
Amendment3.pdf PDF
Amendment2.pdf PDF
Amendment1.pdf PDF
Attachment1.pdf PDF
Attachment6.PDF PDF
Attachment10.pdf PDF
Attachment8.pdf PDF
Attachment7.pdf PDF
CompleteSolicitation.pdf PDF
Attachment5.pdf PDF
Attachment3.pdf PDF
Attachment4.pdf PDF
Attachment9.pdf PDF
Attachment2.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

/4/

:1 5 D

AV

IN

B

LU

BA

UG

H G:

\20

\L

\L

-E

SE

RI

ES

.D W

G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

08/14/2020

RSA Engineering

DB

XPT

ALASKA REGION

L9255

R10

06/07/23

ELECTRICAL LEGEND,

SPECIFICATIONS,

AND PLANS

GENERAL NOTES:

1 OVERALL ELECTRICAL SITE PLAN

1" = 200' (APPROXIMATELY)

2 ENLARGED ELECTRICAL PLAN - OBSERVATORY

1" = 10'-0"

LEGEND

SHEET NOTES:

ELECTRICAL SPECIFICATIONS (CONTINUED ON NEXT SHEET)

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

/4/

:1 5 D

AV

IN

B

LU

BA

UG

H G:

\20

\L

\L

-E

SE

RI

ES

.D W

G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

08/14/2020

RSA Engineering

DB

XPT

ALASKA REGION

L9255

R10

06/07/23

ELECTRICAL

DETAILS AND

SCHEDULES

LOAD SUMMARY

SHEET NOTES:

GENERAL NOTES:

CONDUIT & WIRE SCHEDULE

3 ELECTRICAL EQUIPMENT DETAIL

1" = 1'-0"

2 GROUNDING DETAIL

NO SCALE

1 POWER ONE-LINE DIAGRAM

NO SCALE

4 TELECOM AND CAMERA DETAIL

NO SCALE

5 TELECOM CABINET AREA DETAIL

1" = 1'-0"

Sheets and Views
L9255-Eseries-30
L9255-Eseries-32

File details come from the government source that posted it. Updated .