Amendment2.pdf
PDF 261 KB Posted
- Solicitation number
- 1240BH23R0025
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains a pre-proposal conference file related to a solicitation for the GAOA Anan Wildlife Observatory Reconstruction Phase 2 opportunity. The solicitation requests proposals to demolish and reconstruct the lower deck and staircases of the Anan Wildlife Observatory located in the Tongass National Forest in Alaska. Base work includes demolishing the existing lower timber deck and stair structures, constructing new footings, stem walls, structural elements, a two-level metal and FRP lower observation deck and guardrails, and an aluminum spiral staircase. Optional work includes designing and constructing a remote power and communication system. The period of performance is from September 15, 2023 through December 31, 2024, with a mandatory site shutdown from June 16, 2024 through September 14, 2024 due to high visitor volume. Proposals are due by June 12, 2023. The pre-proposal conference file provides additional details on project objectives and challenges, answers contractors' questions, and outlines expectations for site access, materials removal, lodging, and barge operations given the remote location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment3.pdf | ||
| RevisedSheets6-9-23.pdf | ||
| Amendment1.pdf | ||
| Attachment1.pdf | ||
| Attachment6.PDF | ||
| Attachment10.pdf | ||
| Attachment8.pdf | ||
| Attachment7.pdf | ||
| CompleteSolicitation.pdf | ||
| Attachment5.pdf | ||
| Attachment3.pdf | ||
| Attachment4.pdf | ||
| Attachment9.pdf | ||
| Attachment2.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240BH23R0025
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BH
CORVALLIS OR 97331
3200 SW JEFFERSON WAY
USDA-FS CSA NORTHWEST 6
GAOA06/05/20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/12/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The following items are amended:
1. Drawing Sheet 30, Detail 1:
a. Route the above ground electric and telecom (AG/E/T) lines on the north side of Anan Creek, without any crossing of Anan Creek.
b. Estimated length of run for the AG/E/T lines between the observatory and upper falls is approximately 1,800 ft, as measured by a person walking on the ground following the route of the existing power and telecom cables between the observatory and the upper deck.
c. Add note: Where the AG/E/T lines cannot be routed around bodies of water, such as streams and/or drainage courses, suspend the conduit so it is above the extreme high Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DARCY J. RAPOZA
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
/s/ Darcy J. Rapoza 5 June 2023
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BH23R0025/0002
water level of the water body in a manner that relieves the strain from the conduit and cables.
Submit proposed crossing method to the Forest
Service for review and acceptance prior to mobilization.
2. Drawing Sheet 30, General Note B: Delete
"liquidtite."
3. Technical Specifications, Section 05 71 13, Part 1.4(B). Add the following: Minor alterations to the spiral staircase design for ease of fabrication, and to reduce the probability of warpage, will be seriously considered, provided that the proposed alterations do not change the overall dimensions, do not substantially impact the overall aesthetic, do not substantially increase sound transmission, comply with the structural design criteria, and are reviewed and stamped by an Alaska-licensed Professional Engineer. Proposed alterations will be addressed via the substitution request and shop drawing submittal processes after contract award.
4. Technical Specifications, Section 31 00 00, Part 1.4. Add the following: Provide rock removal plan, describing how rock will be removed while complying with requirements of Part 3.6. Include discussion of rock removal required for the spiral staircase.
Notes from the preproposal conference are attached in the following pages.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
GAOA Anan Wildlife Observatory Reconstruction Phase 2 Preproposal Conference
30 May 2022 Microsoft Teams
Intros-
• FS Staff:
o Darcy Rapoza, Contracting Officer.
o Logan Wild, Facilities Engineer and COR, Tongass National Forest.
o Victoria “Tory” Houser, Recreation Manager for Wrangell and Petersburg Ranger
Districts, Tongass National Forest.
• Contractors:
o Jesse West with Rainforest Contracting o James Buckingham with H Construction. Based in the Mat-Su Valley.
o Joseph Hale (owner) with H Construction. Based in the Mat-Su Valley.
Welcome-
• Project name: GAOA Anan Wildlife Observatory Reconstruction Phase 2, 1240BH23R0025
• Period of performance: September 15, 2023 through December 31, 2024. There is a mandatory shut-down of the site from 6/16/2024 through 9/14/2024 due to high volume of visitors.
• Proposals are due 12 June 2023 at 1600 hours, Pacific Time, 1500 hours Alaska Time.
Prebid Meeting Process-
After introductions and a brief description of the contract documents, there will be time for contractor questions. All contractor questions will be documented. Discussions during the pre-bid conference do not amend the contract documents. Following the Pre-bid conference, the questions, answers and any contract revisions identified will be included in a written contract amendment.
Review Contract Documents:
• State project objectives: From the project pre-solicitation notice: The project has several objectives, all of which revolve around the demolition and reconstruction of a lower deck and staircases of the Anan Wildlife Observatory. Base Item work includes the demolition and removal of the lower timber observation deck and stair structures, including footings;
construction of footings, stem walls and structural elements, a new two-level metal and FRP lower observation deck and guardrails, and an aluminum spiral staircase; and other miscellaneous work. Option Item work includes design and construction of a remote power and communication system, and other miscellaneous work.
• Challenging aspects of this project include:
o Shutdown period next summer.
o Remote location, including heavy bear activity.
o Spiral staircase fabrication and installation: Staircase is unique and tucked tightly against the rock.
o Design and installation of the off-grid power and communication system (option item):
Requires contractor to provide a prescriptive design and the off-grid nature of the design may require specialty designer/installer.
Answers to Pre-Proposal Conference Questions 6-2-2023
1. Question: Power run from main site to upper site: Drawing appears to show the power cable crossing the creek, is that correct?
Answer: No. Route shall follow the north side of Anan Creek, without any crossing of Anan Creek, similar to the existing cable. See Drawing Sheet 30, Detail 1: “Flag proposed conduit routing in the field for Contracting Officer review and approval. Contracting Officer may make minor routing adjustments as needed." Routing shown on the drawings is schematic only.
2. Question: Distance shown for the power cable is 3800 ft upstream of the observatory - is it a straight-line distance, or the actual on-the-ground distance, following the contours of the ground?
Answer: Distance is 1800 ft, measured via GPS track line from a person walking on the ground following the contours of the ground.
3. Question: How should the conduit cross the small tributary upstream from the main viewing deck?
Answer: Suspend the conduit so it is above the extreme high water level of the tributary. No prescribed method. Submit proposed method to the Forest Service prior to mobilization.
4. Question: Does the contract call for laying a metal conduit on the ground?
Answer: Yes. Conduit between the main observatory and the upper falls shall be laid on the ground. See Sheet 30, General Notes, for more information, and see Sheet 32 for conduit and cable types.
5. Question: Lodging on site: What are the expectations?
Answer: Lodging is not provided. See Technical Specifications, Section 01 14 13, Part 1.7 for requirements for the “Contractor’s Work Camp Area.” Note special requirements due to dense brown bear and black bear habitat, exclusion zones for camping, and other requirements.
Several of the nearest beaches are private land (owned by Sealaska) and cannot be camped on without landowner approval. The Anan Bay Cabin was taken out by a tree this past winter and is not expected to be available. The Frosty Bay and Berg Bay cabins are the nearest open cabins and may be possible to be rented. The Wrangell Ranger District would entertain blocking off time for the spring or fall (up to 6 weeks in the fall, and up to 6 weeks in the spring) for the contractor to rent, at the prevailing rental rate. Contractors in the past have camped on a barge.
6. Question: Are there bathrooms on site?
Answer: See Technical Specifications, Section 01 14 13, Part 1.7(F). In addition, the outhouse at the Anan Bay Cabin is in good shape, and the vault toilet at the trailhead (at the Anan Lagoon entrance) is operational.
7. Question: Who was the Phase 1 contractor?
Answer: Rainforest Contracting.
8. Question: Will the existing staircase, built during phase 1, be demolished?
Answer: Yes.
9. Question: Will all removed/demolished materials need to be taken off site?
Answer: Yes. See Technical Specifications, Section 02 41 00, Part 3.1(E), and Section 01 14 13, Part 1.1(C).
10. Question: The contract calls for 2 CY of rock to be removed for staircase installation. Is there a prescribed method to remove that rock?
Answer: No prescribed method. See Technical Specifications, Section 31 00 00, Parts 3.3(A) and 3.6(A). Comply with permit requirements regarding keeping rock out of the creek. Submit a rock excavation plan prior to mobilization.
11. Question: In terms of barge service, is there a place to dock?
Answer: No dock at Anan. Beaching a vessel at the bay is very challenging, due to archaeological restrictions, tides, and beach slope. Contractors may provide their own anchors and anchor in Anan Bay. The Forest Service owns a float in Anan Bay, which is available for vessels up to 36 feet in length and that draft no more than 30 inches, for loading and unloading only. Previous contractors at Anan have mobilized materials to the observatory by:
a. Entering Anan Lagoon with a landing craft during high tides, off-loading at the lagoon landing (location shown on Drawing Sheet 2), and departing the lagoon before the tide dropped too far.
b. Helicopter long-line/sling operations from a vessel anchored in Anan Bay.
12. Question: Do the stairs only go down to the lower observation deck?
Answer: Yes, stairs go from upper deck to lowest lower deck. A hatch in the lowest deck provides ground-level access to the base of the concrete walls and the tunnel entrance. See Drawing Sheets 18, 19, and 21.
13. Question: From the plans it appears that one side of the concrete wall is below the water level?
Answer: Correct. The ordinary high water (OHW) level of Anan Creek in the vicinity of the concrete wall is approximately nine (9) feet above the bedrock elevation. During most water flows, part of the stem wall will be below water level. See Technical Specifications Section 31 00 00 Part 3.2, ADF&G Fish Habitat Concurrence letter, and Forest Service BMPs (all included as attachments to the solicitation) for dewatering requirements and other requirements related to working within the wetted perimeter of Anan Creek.