This is a Performance Work Statement for USDA Agricultural Research Service (ARS) janitorial services at the Wapato Laboratory in Wapato, Washington. The contractor shall provide comprehensive janitorial services including general cleaning, disinfection, restocking, waste removal, sweeping, mopping, vacuuming, and periodic floor maintenance for specified areas including common areas, lavatories, and break rooms. Services are required Monday through Friday between 0730 and 1430 hours, excluding federal holidays and facility closures, with common areas and lavatories serviced three times weekly on Monday, Wednesday, and Friday. The contractor must supply all labor, equipment, materials, cleaning agents, supervision, and transportation necessary to perform the work, while the Government furnishes disposable paper goods, trash bags, and waste receptacle liners. All contractor employees must be U.S. Citizens, and the contractor is responsible for obtaining and maintaining all required federal, state, and local licenses and permits.
The contract period consists of one base year and four option years with performance ending on 9/30/2031 under CLIN 0005. Key deliverables include a proposed cleaning schedule due within five business days of contract award, monthly status reports due by the last weekday of each month, Safety Data Sheets (SDS) documentation prior to chemical use, employee rosters due by the first weekday of each month, and annual service contract reports. The contractor must comply with OSHA and USDA safety requirements, maintain self-inspection protocols, report unsafe conditions and security issues within 24 hours, and reimburse the Government for any security costs resulting from lost keys or access devices. Performance standards require maintaining a safe, clean, and sanitary facility state, with USDA ARS authorized to require reperformance, corrective action, or contract termination for default if deficiencies are not promptly corrected.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation 1240BG26Q0093AME0003.pdf | ||
| Attachment 1 - Performance Work Statement_revision_2.pdf | ||
| Attachment 1 - Performance Work Statement_revision_1.pdf | ||
| Attachment 3 - Wage Determination.pdf | ||
| Solicitation 1240BG26Q0093.pdf | ||
| Attachment 2 -Wapato Jantorial Floor Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Performance Work Statement
Contents
| Project Title | 3 |
| General Information | 3 |
| 1.0 Background and Purpose | 3 |
| 2.0 Definitions | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Deliverable / Schedule | 3 |
| 5.0 Government Furnished | 4 |
| 6.0 Travel | 4 |
| 7.0 Contractor’s Key Personnel | 4 |
| 8.0 Security Requirements | 4 |
| 9.0 Data Rights | 4 |
| 10.0 Section 508 - Electronic and Information Technology Standards | 4 |
| 11.0 Performance Requirement Measures | 4 |
| Attachment | 5 |
Project Title Wapato Janitorial Services
Location: 5230 Konnowac Pass Road Wapato, WA 98951
General Information
1.0 Background and Purpose
This is a non -personal services contract to provide janitorial services at the USDA Agricultural Research Service (ARS) Wapato Worksite. Contractor employees are accountable solely to the Contractor, who is responsible to the Government. The Contractor shall provide all labor, equipment, materials, supplies, supervision, and transportation necessary to perform janitorial services in accordance with this statement of work (SOW). The objective of this contract is to maintain safe, clean, and sanitary facilities that support USDA ARS operations. The Contractor shall coordinate with the Contracting Officer’s Representative (COR) to ensure performance meets USDA ARS quality expectations while minimizing disruption to facility occupants. The Contractor shall provide full janitorial services for areas and restrooms identified at the USDA ARS Wapato Laboratory. Services include general cleaning, disinfection, restocking, waste removal, sweeping, mopping, vacuuming, and periodic floor maintenance. USDA ARS may add or remove building areas through written contract modification. The Contractor shall obtain and maintain all licenses and permits required by applicable federal, state, and local laws.
The period of performance consists of one (1) base year and four (4) option years. Specific dates will be detailed in the solicitation or award. All services shall be performed at the USDA ARS Wapato Laboratory located in Wapato, Washington. It is highly recommended to attend the scheduled site visit. Janitorial services shall be performed Monday through Friday between 0730 and 1430, excluding federal holidays and facility closures. The Contractor must maintain adequate staffing to ensure timely performance of all tasks. Work shall not be performed on federal holidays. If a holiday falls on a scheduled service day, the Contractor shall perform services on another day within the same work week. Federal holidays: New Year’s Day, Martin Luther King Jr. Day, Presidents’ Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day.
This is a performance based commercial services contract. USDA ARS specifies what must be achieved; the Contractor determines how to achieve required outcomes. The Contractor must comply with OSHA and USDA safety requirements, including PPE, signage, safe chemical handling, SDS documentation, and equipment safety. Environmental, Safety, Security, and Conduct Requirements. The Contractor shall comply with all environmental, safety, security, identification, and conduct requirements. All unsafe conditions, environmental concerns, or security issues must be reported verbally and in writing within 24 hours. The Contractor shall report any lost keys, access cards, or access devices within 24 hours. The Contractor is responsible for all replacement, re-keying, or security costs caused by the loss. The Contractor shall provide all equipment, materials, and cleaning agents not furnished by the Government.
2.0 Definitions
United States Department of Agriculture (USDA). Agricultural Research Services (ARS). Contracting Officer’s Representative (COR).
Contractor Requirements
3.0 Technical Requirements / Tasks
3.1 Common areas: Lobby, Foyers, Hallways, Library, First aid, and Conference rooms
· Perform three times per Week-Monday, Wednesday, Friday (alternate days will be required if the normal schedule falls on a holiday or closure):
· Empty waste baskets
· Vacuum carpets
· Clean sinks and counters
· Dusting
· Sweep and mop all hard floors
· Clean floor mats and chair rungs
· Properly position furniture, etc.
· Spot clean partition glass
· Spot clean doors, frames, wall & vertical surfaces
· Spot clean entry door glass
· Clean drinking fountains
· Perform Monthly:
· Detail dusting 6' and below
· High dusting 6' and above - to include vents
· Edge vacuuming
· Dust blinds
· Dust and clean interior windowsills
· Dust tops of appliances and furniture
· Dust or vacuum window coverings
· Spot clean walls and doors
· Dust vents
3.2 Lavatories: Main reception, First aid room, Lunchroom, North, & West
· Perform three times per Week-Monday, Wednesday, Friday (alternate days will be required if the normal schedule falls on a holiday or closure):
· Clean & sanitize toilets, urinals, and sinks
· Empty waste receptacles
· Refill dispensers to normal levels
· Clean and sanitize dispensers
· Sweep, mop, and sanitize floors
· Polish mirrors and fixtures
· Spot Clean walls next to toilets
· Perform monthly:
· Completely wash all walls
· Dust vents, tops of partitions, and tops of furniture/fixtures
3.3 Break room, coffee stations
· Perform three times per Week-Monday, Wednesday, Friday (alternate days will be required if the normal schedule falls on a holiday or closure):
· Sweep and mop floors
· Vacuum carpets and mats
· Empty and clean waste receptacles
· Clean and polish sinks and counters
· Refill dispensers to normal levels
· Clean tables and chairs - remove random trash
· Stack newspapers and magazines
· Dust 6' and below
· Spot clean vertical surfaces 6' and below
· Clean doors and handles of appliances
· Every Friday:
· Clean inside of microwaves
· As needed:
· Clean windowsills
4.0 Deliverable / Schedule
Key Deliverables
| Item No. |
| Deliverable |
| Objective |
| Due |
| 1 |
| Proposed Cleaning Schedule |
| The Contractor shall provide an annual cleaning schedule listing all required tasks. |
| No later than five (5) business days after contract award |
| 2 |
| Monthly Status Report |
| The Contractor shall submit a monthly status report summarizing completed tasks, issues discovered, corrective actions, and supply usage concerns. |
| Monthly, by the last weekday of each month, by 5:00 PM PST until the contract expires |
| 3 |
| SDS Documentation |
| Provide printed on-site SDS information for all chemicals used |
| Prior to use |
| 4 |
| Employee Roster |
| Provide employee roster |
| Monthly, by the first weekday of each month, by 9:00 AM PST until the contract expires or with any employee change |
| 5 |
| Service Contract Report |
| Provide a service contract report each service year |
| Annually |
5.0 Government Furnished
The Government will provide disposable paper goods including paper towels, toilet paper, hand soap, toilet seat covers, trash bags, aerosol spray, and waste receptacle liners. The Contractor shall monitor supply levels and inform COR as restock is needed.
6.0 Travel
Not applicable
7.0 Contractor’s Key Personnel
Janitorial/custodial staff
8.0 Security Requirements
All employees must be US Citizens.
9.0 Data Rights
Not applicable
10.0 Section 508 - Electronic and Information Technology Standards Not applicable
11.0 Performance Requirement Measures
| Performance Objective |
| Required Task or Deliverable |
| Performance Standard |
| Method of Surveillance |
| Negative Incentive % for NOT meeting the Task |
| Contractor Performance Assessments |
| The Contractor shall inspect its own work, correct deficiencies, and provide inspection reports to the COR on a routine basis. |
| Facility will be kept in a safe, clean, and sanitary state. |
| USDA ARS Contracting Officer Representative |
| USDA ARS may require reperformance or corrective action if work does not meet contract standards. If deficiencies are not corrected promptly, USDA ARS may perform the services at the Contractor’s expense or terminate the contract for default. |
Attachment Attachment 1 – Performance Work Statement Attachment 2 – Wapato Janitorial Floor Plan Attachment 3 – Wage Determination image1.png
File details come from the government source that posted it. Updated .