Q and A (5).pdf
PDF 138 KB Posted
- Attached to
- Fire Alarm System Inspections_Updated Federal contract opportunity
- Solicitation number
- 1240BG24Q0059
- Issued by
- Department of Agriculture Forest Service
About this file
This document appears to be a set of questions and answers related to a federal contract opportunity for annual inspection of the fire alarm systems at the Moscow main building and rain lab facilities. The key details are:
The contract opportunity, Solicitation Number 1240BG24Q0059, is for the annual inspection and testing of the fire alarm systems installed in 2023 to ensure compliance with NFPA 72. The buildings involved are the 3-story, 20,493 sq ft main building and the 1-story, 6,400 sq ft rain lab. There are no known issues with the systems currently, and there will not be a site visit. The government has hard copies of the fire alarm system site plans but is unsure if the contractor will need those. The buildings do not have sprinkler systems or backflow devices that require inspection. The government has the necessary elevator reset key on site.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q and A (4).pdf | ||
| Previous Inspection Sheet.pdf | ||
| Q and A (3).pdf | ||
| Commercial Services_Combined_Updated.pdf | ||
| Q and A.pdf | ||
| Commercial Services_Combined.pdf | ||
| Statement of Work.pdf | ||
| wage.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1240BG24Q0059 – FIRE ALARM INSPECTIONS – MOSCOW ID
1. Is there incumbent and what is the award no.?
a. No – no prior award
2. What are the square footages of each building, and what are the building levels?
a. Rain Lab – 1 story with a loft, 6,400sf
b. Main Building – 3 stories with 2 additional landings, 20,493sf
3. Will there be a site visit at location?
a. No
4. Can you provide information on what types of panels there are?
a.
b.
5. As far as the working order of the equipment, is there anything known to be not working or not fully operational?
a. The is no known issues at this time.
6. Do you have copies of the approved FA prints.(Digital or hard copies)
a. I’m not entirely sure what FA prints are. I believe he is asking for the site plans detailing where the fire alarms are. We have hard copies of these.
7. If the system has elevator recall when the alarm is tested, do you have the elevator reset key on site?
a. we do have the reset key on site.
8. Are there both wet sprinkler and dry sprinkler systems that need to be inspected?
a. No sprinkler systems involved.
9. Are there backflow devices needing inspected?
a. No need for backflow inspection.