1240BE26Q0064 Attachment 11 Equipment Cleaning Form.pdf

PDF 199 KB Posted

Attached to
Willamette NF, MF 26-5 Annual Road Maintenance and/or MF 26-6 Suppression/Repair Road Maintenance
Solicitation number
1240BE26Q0064
Issued by

About this file

This is an Equipment Cleaning Inspection/Verification Form used by the United States Forest Service (USFS) to document and certify that contractor equipment has been properly cleaned in accordance with contract requirements.

The form captures essential information including the inspection date, contract number, contract name, contractor representative name, and USFS Contracting Officer's Representative (COR) or Inspector identification. It documents the type of equipment being inspected, the cleaning method employed, and the location where cleaning occurred. The form also requires identification of the equipment's last operational location, specifying the state and whether operations occurred at federal locations, non-federal locations, or both. The contractor must certify under signature that all equipment cleaning contract provisions have been satisfied and that all equipment has been thoroughly cleaned of soil, seeds, and vegetative material. This certification attests to the accuracy of the information provided. The form serves as official documentation of compliance with equipment cleaning requirements, with both the contractor signature and date required for validation.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EQUIPMENT CLEANING INSPECTION/VERIFICATION FORM

Date: Contract #:

Contract Name:

Contractor Representative:

USFS COR/Inspector:

Type of Equipment:

How was the Equipment Cleaned?

Where was the Equipment Cleaned?

LOCATION OF LAST OPERATIONS:

State:

Federal Location:

Non-Federal Location:

I certify that all requirements as outlined in the equipment cleaning contract provisions have been met, and that all equipment has been thoroughly cleaned of soil, seeds and vegetative material. I also certify that the above information is true to the best of my knowledge.

Contractor Signature Date

ATTACHMENT 6

File details come from the government source that posted it. Updated .