Amendment 01 (Signed By CO).pdf
PDF 1 MB Posted
- Attached to
- Janitorial Services, Avery Office and Engine Bay Federal contract opportunity
- Solicitation number
- 1240BD26Q0036
- Issued by
- Department of Agriculture Forest Service
About this file
This is Amendment 01 to Request for Quote (RFQ) No. 1240BD26Q0036 for janitorial services at the USDA Forest Service Idaho Panhandle National Forests, St. Joe Ranger District in Shoshone County, Idaho. The amendment, effective April 22, 2026, removes the requirement for the vendor to provide cleaning supplies, with the Government assuming full responsibility for supply provision and maintenance. The Contracting Officer is Brian A. Johnson, USDA Forest Service Field Procurement Operations, and the Technical Point of Contact is Rachael Middlekoop.
The contract is structured as a firm-fixed-price (FFP) agreement with a base year (May 1, 2026 – April 30, 2027) and four option years. Contractors must submit pricing for six line items covering janitorial services in Building #2025 (Avery Office) during peak-season months (May-September) and off-season months (October-April), janitorial services in Building #2614 (Engine Bay) during peak season, carpet cleaning (2 events annually), window cleaning (2 events annually), and surge cleaning (1 hour). The Government furnishes electrical power, hot and cold water, garbage dumpster access, building access keys, and all cleaning supplies (plastic liners, paper towels, hand soap, air freshener, toilet paper, and related consumables). Contractors must provide commercial-quality equipment, comply with biobased product requirements per FAR 52.223-2, submit Safety Data Sheets for all chemicals, undergo background investigations, maintain building security, and provide a list of USDA-designated biobased products for COR approval prior to work commencement. Contractors are responsible for subsequent employee background investigations without Government reimbursement beyond initial employees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ No 1240BD26Q0036.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Brian A. Johnson, CO
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
"JANITORIAL SERVICES, AVERY OFFICE AND ENGINE BAY"
1. Amendment 01 removes the requirement for the vendor to provide supplies. To reflect this revision, the Schedule of Items is amended (Pages 3-5) and the Performance Work Statement, associated Sections 11 and 12, are amended (Pages 31-35).
Replace these pages in their entirety as attached. All other terms and conditions of the RFQ remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
USDA Forest Service Field Procurement Operations (FPO), CSA #2 Attn: Brian A. Johnson, Contracting Officer Telephone: (509) 423-2223 E-mail: Brian.Johnson3@usda.gov
Same as Block 6
1163806
1240BD26Q0036
1 9
04/22/2026
04/14/2026
4/22/2026
JANITORIAL SERVICES, AVERY OFFICE AND ENGINE BAY
USDA Forest Service (USFS)
Idaho Panhandle National Forests St. Joe Ranger District
(Shoshone County)
SCHEDULE OF ITEMS
BASE YEAR: 05/01/2026 – 04/30/2027
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES / SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(See Note #1)
Janitorial Services, Bldg. #2025 Avery Office, Peak-Season Months (May - September)
5 MO $ $
Janitorial Services, Bldg. #2025 Avery Office, Off-Season Months (October - April)
7 MO $ $
Janitorial Services, Bldg. #2614 Engine Bay (May – September)
5 MO $ $
0004 Carpet Cleaning 2 EA $ $
0005 Window Cleaning 2 EA $ $
0006 Surge Cleaning 1 HR $ $
TOTAL BASE YEAR: $
OPTION YEAR 1: 05/01/2027 – 04/30/2028
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES / SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Janitorial Services, Bldg. #2025 Avery Office, Peak-Season Months (May - September)
5 MO $ $
Janitorial Services, Bldg. #2025 Avery Office, Off-Season Months (October - April)
7 MO $ $
Janitorial Services, Bldg. #2614 Engine Bay (May – September)
5 MO $ $
1004 Carpet Cleaning 2 EA $ $
1005 Window Cleaning 2 EA $ $
1006 Surge Cleaning 1 HR $ $
TOTAL OPTION YEAR 1: $
RFQ No 1240BD26Q0036 Janitorial Services, Avery Office and Engine Bay Page 3 of 51
System for Award Management (SAM) Idaho Panhandle National Forests Firm-Fixed-Price (FFP)
(Amendment 01) bajohnson03 Highlight bajohnson03 Comment on Text The requirement for the vendor to price "Supplies" is hereby removed from the Base Year and Option Years 1 through 4. The Government will provide supplies.
OPTION YEAR 2: 05/01/2028 – 04/30/2029
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES / SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Janitorial Services, Bldg. #2025 Avery Office, Peak-Season Months (May - September)
5 MO $ $
Janitorial Services, Bldg. #2025 Avery Office, Off-Season Months (October - April)
7 MO $ $
Janitorial Services, Bldg. #2614 Engine Bay (May – September)
5 MO $ $
2004 Carpet Cleaning 2 EA $ $
2005 Window Cleaning 2 EA $ $
2006 Surge Cleaning 1 HR $ $
TOTAL OPTION YEAR 2: $
OPTION YEAR 3: 05/01/2029 – 04/30/2030
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES / SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Janitorial Services, Bldg. #2025 Avery Office, Peak-Season Months (May - September)
5 MO $ $
Janitorial Services, Bldg. #2025 Avery Office, Off-Season Months (October - April)
7 MO $ $
Janitorial Services, Bldg. #2614 Engine Bay (May – September)
5 MO $ $
3004 Carpet Cleaning 2 EA $ $
3005 Window Cleaning 2 EA $ $
3006 Surge Cleaning 1 HR $ $
TOTAL OPTION YEAR 3: $
RFQ No 1240BD26Q0036 Janitorial Services, Avery Office and Engine Bay Page 4 of 51
System for Award Management (SAM) Idaho Panhandle National Forests Firm-Fixed-Price (FFP)
OPTION YEAR 4: 05/01/2030 – 04/30/2031
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES / SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Janitorial Services, Bldg. #2025 Avery Office, Peak-Season Months (May - September)
5 MO $ $
Janitorial Services, Bldg. #2025 Avery Office, Off-Season Months (October - April)
7 MO $ $
Janitorial Services, Bldg. #2614 Engine Bay (May – September)
5 MO $ $
4004 Carpet Cleaning 2 EA $ $
4005 Window Cleaning 2 EA $ $
4006 Surge Cleaning 1 HR $ $
TOTAL OPTION YEAR 4: $
SUMMARY OF PRICES
Base Year: $_______________
Option Year 1: $_______________
Option Year 2: $_______________
Option Year 3: $_______________
Option Year 4: $_______________
Total Price (All Years): $_______________
SCHEDULE OF ITEMS NOTES
Note #1: The Base Year’s commencement date will be prorated due to it starting later than May 1. All subsequent option years, if exercised, will commence May 1.
Note #2: Refer to Attachment 1—Performance Work Statement (PWS).
GOVERNMENT POINTS OF CONTACT
Contractual: brian.johnson3@usda.gov, (509) 423-2223 Technical: rachael.middlekoop@usda.gov, (208) 626-2524
RFQ No 1240BD26Q0036 Janitorial Services, Avery Office and Engine Bay Page 5 of 51
Contractor, states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.
Note: A Government Technical Monitor (GTM) may be appointed by the CO to assist the COR with inspections. The GTM is only delegated inspection functions and cannot direct the Contractor in any manner. The GTM shall report directly to the COR concerning inspection results, identified rework items, etc.
11.0 GOVERNMENT FURNISHED PROPERTY & MATERIALS (GFP/GFM)
The Government shall provide the following property and materials to the Contractor for use in the performance of this contract in accordance with FAR clause 52.245-2 Government Property, incorporated by reference in this contract.
Property Approximate Value Provided Via
Electrical Power N/A Avery Office & Engine Bay Facilities
Hot and Cold Water N/A Avery Office & Engine Bay Facilities
Garbage Dumpster N/A
Avery Ranger District
1 dumpster located Across St. Joe River Rd from Office
Building Access Keys (key cards, key codes, or locks)
$100.00 each Government
11.1. Utilities
11.1.1. Floor outlets shall be left in a condition that will not constitute a tripping hazard, i.e., lids tightly closed when no longer in use. Contractor’s employees shall not unplug Government equipment to access electrical power.
11.2. Supplies
11.2.1. The Government will provide all cleaning supplies cited in paragraph 11.3 below, monitor stock, and ensure adequate stocking levels are maintained at all times.
11.2.2. The Government will store all supplies and provide the Contractor with a storage location for all equipment to be used in the performance of the work.
11.2.3. The Contractor must return any Government-furnished property at the end of the period of performance of this contract in accordance with instructions provided by the COR.
RFQ No 1240BD26Q0036 Janitorial Services, Avery Office and Engine Bay Page 31 of 51
System for Award Management (SAM) Idaho Panhandle National Forests Firm-Fixed-Price (FFP)
(Amendment 01) bajohnson03 Highlight
11.3. Supplies. The following cleaning supplies will be provided by the Government:
Supplies Approximate Value Provided Via
Plastic Garbage Liners Paper Towel Waste Receptacle Liners Paper Towels Liquid Hand Soap Air Freshener Toilet Paper Paper Toilet Seat Covers Sanitary Napkin Disposal Liners Shower Curtains
$12 per box $12 per box $3 per pack $12 per bottle $5 per bottle $1.50 per roll $6 per box $8 each $15 each
Government
11.4. Safety Data Sheets (SDS). The Contractor shall submit SDS’s to the COR which shall be kept in an area adjacent to storage areas where cleaning chemicals are kept. Generally, chemicals are to be stored in safe areas as designated by the COR and in a manner consistent with the manufacturers’ recommendations.
Contractor must ensure that the SDS’s are readily accessible to all employees for all hazardous chemicals in the workplace.
12.0 VENDOR FURNISHED EQUIPMENT
12.1. Equipment. The Contractor’s equipment shall be of commercial quality, size, and type suitable for accomplishing the various phases of work specified and be capable of operating from existing sources of electrical power. The Contractor’s equipment shall be in good repair and able to operate efficiently and safely. The COR may inspect the Contractor’s equipment, tools, or supplies at any time and direct the removal of any objectionable, improper, inadequate, or unsafe items. These items shall be removed from the job by the Contractor and replaced with satisfactory replacement(s).
12.2. Damage to Contractor’s Property. The Government will not be responsible in any way for damage to the Contractor’s equipment or the Contractor’s employees’ personal belongings brought onto the Government premises during the performance of work under this contract.
12.3. Bio-Preferred
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA); the Food Conservation and Energy Act of 2008; the Agricultural Act of 2014;
and the Federal Acquisition Regulation to provide biobased products. The Contractor shall also comply with FAR clause 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts incorporated by reference in this contract.
The Contractor shall utilize products and materials made from biobased materials (e.g., biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user.
All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the CO.
RFQ No 1240BD26Q0036 Janitorial Services, Avery Office and Engine Bay Page 32 of 51 bajohnson03
The vendor is required to supply its day-to-day cleaning supplies for performance of all janitorial services.
The following are examples of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that the Contractor be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Adhesive and Mastic Removers Carpet and Upholstery Cleaners Spot Removers Dust Suppressants Floor Strippers Furniture Cleaners and Protectors General Purpose Cleaners Glass Cleaners Graffiti and Grease Removers Hand Soaps and Cleaners Industrial Cleaners Leather, Vinyl, and Rubber Care Products Metal Cleaners and Corrosion Removers
Corrosion Removers Other Metal Cleaners
Microbial Cleaning Products Drain Maintenance Products General Cleaners
Multipurpose Cleaners Sorbents
Biobased products that are designated for preferred procurement under the USDA’s Bio-preferred Program must meet the required minimum biobased content as stated at www.biopreferred.gov. Percentages for products listed above can be found at the following site:
https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml#. The Contractor should provide data for biobased products such as biobased content.
In addition to the biobased products designated by the U.S. Department of Agriculture in the Bio-preferred Program, the Contractor is encouraged to use other commercially available biobased products such as biobased products certified with a label.
The Contractor shall comply with FAR clause 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
The Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.
NOTE: This procurement requires the use of Biobased products to the extent that such products are reasonably available, meet agency or relevant industry performance standards, and are reasonably priced. The products should first be acquired from the USDA designated products categories.
The Contractor shall submit a complete list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of this contract.
RFQ No 1240BD26Q0036 Janitorial Services, Avery Office and Engine Bay Page 33 of 51
At the scheduled Pre-Work Meeting, prior to commencement of work, the Contractor shall provide a complete list of USDA designated biobased products that it intends to use or supply during performance of this janitorial services contract, including products used or supplied by subcontractors. For each product, the Contractor shall identify the product and brand/manufacturer. For each designated product, the Contractor shall also identify the biobased content. The Contractor shall provide detail on how the Contractor intends to keep abreast of the development and increasing availability of designated and non-designated biobased products and how any new or improved products will be incorporated on an ongoing basis into contract performance. The list shall be approved by the COR in writing. The Contractor shall not commence work until this list is approved by the COR in writing. The list must be reviewed and updated annually, and as required by the COR.
Reporting is required by Sections 9002 of the Food Conservation and Energy Act of 2008 and the Agricultural Act of 2014. The Contractor shall provide quantities, product types and dollar value of any USDA-designated biobased product purchased by the Contractor.
This important data shall be submitted to the COR for the current quarter and current contract year. A brief explanation shall include the methodology used to calculate the dollar value of USDA-designated products used or supplied.
The Contractor should also note that USDA-designated biobased products are available for purchase through the AbilityOne Program (formerly known as the Javits- Wagner-O’Day (JWOD) Program). Under this program, members of organizations including the National Industries for the Blind (NIB) and the National Institute for the Severely Disabled (SourceAmerica) offer products and services that are mandatory by Federal agencies. A search of the AbilityOne Program’s online catalog indicated biobased products that fall within the operations and maintenance area. These include, but are not limited to, cleaners (glass, hand, and multipurpose), graffiti removers, and sorbents. Online Catalog:
(https://www.abilityone.gov/procurement_list/product_contractors.html)
13.0 SECURITY REQUIREMENTS
13.1. Government Background Investigation and LincPass
All Contractor employees working on the site must undergo a security background investigation before allowed access to any Federally-controlled facility. Background investigations for all Contractor employees working under this contract shall be submitted to the CO and COR, in writing, at least 7 days prior to any change and shall include a copy of that employee’s security background check that has been performed by the Contractor prior to the Contractor employee starting work under this contract.
The Government may require additional screening for security measures of the Contractor and any employee of the Contractor’s firm. Screening and record searches may require additional information be provided to the Government upon request. Failure to provide the information requested by the Government within a reasonable timeframe may result in termination of the Contractor’s right to proceed.
There is a cost for each background investigation. The Government will cover the cost of these background investigations for each initial employee of the Contractor (price to be included on your company’s Schedule of Items – Base Year only). Subsequent required background investigations, regardless of reason (i.e., new employee, Government requests removal of an employee, etc.) shall be incurred by the Contractor without reimbursement by the Government.
RFQ No 1240BD26Q0036 Janitorial Services, Avery Office and Engine Bay Page 34 of 51
System for Award Management (SAM) Idaho Panhandle National Forests Firm-Fixed-Price (FFP) bajohnson03
For Amendment 01, there are no changes to Sections 13.
13.2. Building Security
The Contractor shall be responsible for locking outside doors and windows and turning off fans and lights when night cleaning is finished in all areas, unless otherwise occupied by Government personnel. During the scheduled cleaning time, lights shall be on only in the portion of the building where the work is being done.
Under no circumstances shall the Contractor or its employees allow outside doors to be propped open and/or left unattended while cleaning is being performed. The Contractor and Contractor’s employees shall exercise care when entering and exiting the building by making sure that the outside doors used are securely closed when not in immediate use.
The Contractor or Contractor’s employees shall not allow anyone other than approved cleaning staff access to the building(s) or share building entry code(s). Noncompliance with this will be considered an act of negligence by the Contractor.
The Contractor or Contractor’s employees shall not disturb papers on desks, tamper with computer terminals, open cabinets or drawers, or use telephones except for emergency calls to the police or fire department. Use of Government photocopiers, fax machines, typewriters, and other Government office equipment by Contractor’s employees is strictly prohibited.
Government office equipment shall not be unplugged, bumped, or disturbed.
The Contractor or Contractor’s employees shall report in writing any hazardous conditions and items in need of repair to the COR.
RFQ No 1240BD26Q0036 Janitorial Services, Avery Office and Engine Bay Page 35 of 51
File details come from the government source that posted it. Updated .