This solicitation requests mechanical fuels reduction services on the Mt. Hood National Forest Barlow Ranger District in Oregon. Mandatory work includes machine piling 1,406 acres and masticating 502 acres, with optional additions of piling 922 acres and masticating 1,473 acres. Services will reduce fuel loading through grapple piling and mastication, leaving logs over 18 inches in diameter. The period of performance for mandatory work begins July 15, 2021 through December 31, 2022. Equipment required includes a rubber tired or track-mounted machine with a 10-foot reach, less than 10 psi ground pressure, 30 percent slope climbing, and a bucket or grapple mechanism to pile debris from 1 inch to 18 inches by 20 feet. The solicitation prohibits operations from March 1 to July 15 and requires erosion control and guard rail rebuilding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 01.pdf | ||
| RFQ No 1240BD21Q0078.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (Reverse) (8/97)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 5
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
02 05/24/2021 1028326
6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6) USDA Forest Service Mt. Baker-Snoqualmie National Forest Attn: Brian A. Johnson, CO 2930 Wetmore Ave., Suite 3A Everett, WA 98201
Same as Block 6 brian.johnson3@usda.gov
(425) 783-6056
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9A. AMENDMENT OF SOLICITATION NO.
1240BD21Q0078
9B. DATED (SEE ITEM 11)
05/07/2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.
NOTE: If offers are handcarried, additional time should be allowed to access the depository facility due to heightened security requirements.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.
AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return ___ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
2021 BARLOW MECHANICAL FUELS REDUCTION
Mt. Hood National Forest Barlow Ranger District
1. The purposes of Amendment 02 are to provide the Pre-Quote Site Visit Attendance Roster, Questions & Answers, and a Unit Location Map.
2. All other terms and conditions of the solicitation remains unchanged.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Brian A. Johnson
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign)
BY
(Signature of Contracting Officer) 05/24/2021
RFQ No. 1240BD21Q0078 2021 Barlow Mechanical Fuels Reduction
Amendment 02
Pre‐Quote Site Visit
RSVP List of Attendees
Contractor Attended
Nick Noble – PacWest Yes
Cecil Swaggert (Mike Attended) Yes
David Linn – David Linn Trucking Yes
Tyler Willis – Markit! Forestry Yes
Andrew Taliopico Yes
Todd West Yes
Jay Crawls – Summitt Yes
Don Gilbert – URE Outdoors Yes
Joe Rutkowski – Mohawk Valley Materials Yes
Bud Massey Yes
Chris Heffernan – NorthSlope Resources Yes
Nick Nunley – Sweat USA LLC No
Tim Ashley – Teejay Brushing Yes
Andy Earnest – Bar4E Yes
Justin Cecil – ArborWorks Yes
PRE-QUOTE SITE VISIT
Date: May 19, 2021 Time: 0900-1200 Location: Barlow Ranger District Office, 780 NE Court St., Dufur, OR 97021
Company Questions & USDA Forest Service Answers:
Q#1: What is the thinning specifications for the mechanical piling units?
A#1: All mechanical piling units will be thinned to a spacing of 20’ x 20’.
Q#2: Can you provide a map that has all work locations on it?
A#2: Yes. That will be created and added to the solicitation (attached to this amendment).
Q#3: Is there a possibility of starting prior to July 16, 2021?
A#3: Yes, there is a potential for this to occur. Potential units will be identified upon contract award.
Q#4: Can a map be created of units that do not have any timing constraints?
A#4: There is potential for work to begin prior to July 16, 2021. That information will be discussed and provided upon contract award. A map cannot be created at this time due to the variance of these units.
Q#5: Will this contract be awarded to one company?
A#5: Yes. This contract will be awarded to one contractor.
Q#6: Will adjustments be made for fluctuations is fuel prices?
A#6: No. This is a firm-fixed-price (FFP) contract, which is not subject to adjustment.
Q#7: Will camping be authorized?
A#7: Yes. Camping is authorized and a permit will be issued for camping.
Q#8: Is lowest price the only selection criteria for award?
A#8: No. Refer to Section I – Evaluation Factors for Award.
Q#9: How would shutdowns due to wildfires or Industrial Fire Precaution Levels (IFPL) restrictions affect contract?
A#9: If extended shutdowns, due to wildfire or IFPL restrictions occur, the contractor can request a total shutdown and the CO may issue a Stop-Work Notice / Suspension of Work.
Q#10: How many days to complete the contract?
A#10: Refer to Section F—Deliveries or Performance. If optional items are awarded, days may be added to the contract depending on number of options awarded and timing of options awarded.
Q#11: What is the likelihood of optional items being awarded?
A#11: We have been successful in obtaining extra monies to award optional items in our previous fuels reduction contracts. I anticipate this contract to follow suit, but previous award of optional units does not guarantee I will be able to do so again.
Q#12: Does the contractor have the authority cut a tree to access an area in the unit?
A#12: Yes. The Contracting Officer’s Representative (COR) will authorize the cutting of a tree to access areas that need to be piled or masticated. The COR needs to know location and how many prior to cutting.
Q#13: What are the fire control measures required?
A#13: Refer to Section G—Contract Documents, Exhibits, or Attachments. Contractor will be required to have a 300-gallon water tank and a full compliment of tools, as outlined in the solicitation. Additionally, each piece of equipment needs to have a fire extinguisher that meets the requirements as outlined in the contract.
Q#14: Can one water tank be used for multiple pieces of equipment?
A#14: Yes. If multiple pieces of equipment are working in the same unit, or working in the adjoining unit, one water tank is sufficient.
End of Questions & Answers.
Tumble Creek
Crow Creek
So uth
Fo rk
Mi ll C ree k
Wolf Run Ditch
Wildcat Creek
Dry Creek
Fret Creek
Puppy Creek
Larch Creek
Gumjuwac Creek
HellroaringCreek
To lo
Cr ee k
South Fork
Fivemile Creek
Jordan Creek
Cat Creek
Eightmile Creek
EngineersCreek
Fivemile Creek
Alder Creek
Gate Creek
Lo st
Cr ee k
North Fork
Fivemile Creek
Ward Creek
Fifteenmile Creek
Badger Creek
Dog River
Souva Creek
Culvert Creek
Jalland Creek
Lunch Creek
Goat Creek
Tamarack Creek
Pine Creek
Ramsey Creek
Little Badger Creek
Pen Creek
North Fork Rock Creek
Pine Creek
South Fork Gate Creek
Tygh Creek
Marion Creek
Middle Fork
Fivemile Creek
Pup Creek
Springer Ditch
Rock Creek
Ceda r C ree k
Drop Creek Boulder Creek
Rock Creek Ditch
Orchard Ridge Ditch
Wolf Run
Threemile Creek Threemile Ditch
Highland Ditch
Rock Creek Reservoir Cody
Ponds
Camp Baldwin
Lake
Pine Hollow
Reservoir
Cody Ponds
Oval Lake
Cody Ponds
Smarts Reservoir
Crow Creek Reservoir
Ýk48
Ýk17
Ýk44
Ýk44
Ýk27
Ýk48
2021 Barlow Mechanical Fuels - Location Map Pollywog Area Rock Creek/South Pen Area Owl Quarry Area National Forest Administrative Boundary
Unit Locations Map (Amendment 02)