Amendment 01.pdf

PDF 4 MB Posted

Attached to
2021 Mechanical Fuels Reduction, Mt. Hood National Forest, Barlow Ranger District
Solicitation number
1240BD21Q0078
Issued by

About this file

This solicitation is for mechanical fuels reduction services on the Mt. Hood National Forest Barlow Ranger District in Oregon. Mandatory work includes machine piling of 1,406 acres and mastication of 502 acres, while optional work includes machine piling of 922 acres and mastication of 1,473 acres. The estimated start date for mandatory work is July 15, 2021, with completion by December 31, 2022. Services require equipment capable of piling slash up to 18 inches in diameter and masticating live vegetation on slopes up to 30 percent. Refueling, maintenance, and repairs must occur at designated areas. No operations are permitted from March 1 through July 15 or under hazardous fire conditions. The contracting agency is the USDA Forest Service Pacific Northwest Region.

View the file

Other files

File Type Posted
Amendment 02.pdf PDF
RFQ No 1240BD21Q0078.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (Reverse) (8/97)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 5

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

01 05/12/2021 1028326

6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6) USDA Forest Service Mt. Baker-Snoqualmie National Forest Attn: Brian A. Johnson, CO 2930 Wetmore Ave., Suite 3A Everett, WA 98201

Same as Block 6 brian.johnson3@usda.gov

(425) 783-6056

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

9A. AMENDMENT OF SOLICITATION NO.

1240BD21Q0078

9B. DATED (SEE ITEM 11)

05/07/2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.

NOTE: If offers are handcarried, additional time should be allowed to access the depository facility due to heightened security requirements.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.

AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return ___ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

2021 BARLOW MECHANICAL FUELS REDUCTION

Mt. Hood National Forest Barlow Ranger District

1. The purpose of Amendment 01 is to provide the project’s geo-referenced maps.

2. All other terms and conditions of the solicitation remains unchanged.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Brian A. Johnson

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign)

BY

(Signature of Contracting Officer) 05/12/2021

Ce da r C ree k

Jo rd an C ree k

La rch

Cr ee k

3600 4000

Ow l Q ua rry

Ra il R elo g 2

Ra il 6

Ow l Q ua rry

2A

Ow l Q ua rry

2B

Fr ail ey

Ow l Q ua rry

2B

Ow l Q ua rry

2C

Ow l Q ua rry

2C

Ow l Q ua rry

2A

Ow l Q ua rry

Mt H oo d N

F - B arl ow

R an ge r D ist ric t

FY

C on tra ct

Un its

Ma sti ca tio n - O pti on al Me ch an ica l P ilin g -

O pti on al

Ma sti ca tio n & Pi lin g -

O pti on al

Na tio na l F ore st

Ad mi nis tra tiv e B ou nd ary

0.5

0.2

Mi les

No rth

Fo rk

Fiv em ile Cr ee k

Crow Creek South Fork Mill C reek

Fiv em ile

Cre ek

Sout h F ork

Fiv em ile

Cree k

Alder C ree k

Eig htm ile C ree k

Tam ara ck

Cree k

Midd le F ork

Fiv em ile Cre ek

Cr ow

C ree k Re se rvo ir

196 011

0 (

PV

T)

3400 3000

No rth

Fi ve

No rth

Fi ve

Re kn eb al

Fo otb all

Po lly wo g 4

Po lly wo g

Po lly wo g 1

Po lly wo g 3

Po lly wo g 5

Po lly wo g 7

Po lly wo g 7

Po lly wo g 6

Po lly wo g 7

Po lly wo g 7

Po lly wo g 2

Fo otb all

Fo otb all Sa lv

Mt H oo d N

F - B arl ow

R an ge r D ist ric t

FY

C on tra ct

Un its

Me ch an ica l P ilin g - M an da tor y

Me ch

Pi lin g - M an da tor y;

Ma sti ca tio n - O pti on al Ma sti ca tio n -

O pti on al

Na tio na l F ore st

Ad mi nis tra tiv e B ou nd ary

0.5 Mi

les±

Wildc at C ree k

Ro ck

Cr ee k

Gate Cr eek

Threemile Creek

No rth

Fo rk

Ro ck

Cre ek

So uth

Fo rk

Ga te

Cr ee k

Ba dg er Cr ee k

Hig hla nd D itc h

Th ree mi le

Di tch

So uva

Cr eek

Ro ck

C ree k Re se rvo ir

Sm art s Re se rvo ir

02415

0 016

Ýk48

Wi ldc at

Wi ldc at

Wi ldc at

Wi ldc at

Wi ldc at

Ba dg er

Ba dg er

Ba dg er

2Ba dg er

Ro ck y 6

Ro ck y

Ro ck y 2

Ro ck y 3

Ro ck y 3

Ro ck y 3

Ro ck y 4

Ro ck y 4

Ro ck y 4

Ro ck y 5

Ro ck y 5

Ro ck y 5

Wi ldc at

Wi ldc at

Wi ldc at 72 Wi ldc at

Ro ck y 2

Ro ck y 3

Ro ck y 4

Wi ldc at

Wi ldc at

Ro ck y 3

Ro ck y 3

Ro ck y 3

Ro ck y 3

Ro ck y 6

Ro ck y 6

Ro ck y 2

Mt H oo d N

F - B arl ow

R an ge r D ist ric t

FY

C on tra ct

Un its

Me ch an ica l P ilin g - M an da tor y

Me ch an ica l P ilin g - O pti on al Ma sti ca tio n -

M an da tor y Ma sti ca tio n -

O pti on al

Ma sti ca tio n & Pi lin g -

O pti on al

Na tio na l F ore st

Ad mi nis tra tiv e B ou nd ary

0.5 Mi

Little Badger Creek

10Ýk27

Ýk27

So uth

Pe n 3

So uth

Pe n 3

So uth

Pe n 4

So uth

Pe n 4

So uth

Pe n 4

So uth

Pe n 5

So uth

Pe n 5

So uth

Pe n 5

Mt H oo d N

F - B arl ow

R an ge r D ist ric t

FY

C on tra ct

Un its

Ma sti ca tio n - O pti on al Me ch an ica l P ilin g -

O pti on al

Ma sti ca tio n & Pi lin g -

O pti on al

Na tio na l F ore st

Ad mi nis tra tiv e B ou nd ary

0.2

0.1 Mi

2021-05-12T08:54:39-0700
BRIAN JOHNSON

File details come from the government source that posted it. Updated .