This is Amendment 0001 to solicitation 12405B25Q0043, providing questions and answers regarding a water purification system installation at USDA ARS SEA facility in Stoneville, MS. The amendment clarifies key technical requirements, including water consumption rates (average 20 gallons per day, peak 300 gallons), water source details (irrigation water from reservoir with 600-800 TDS and high iron content), and installation specifications (system to be located outside growing system containers with power available).
The required water purification system includes a 12" HE water softener, 12" HE catalytic filter, reverse osmosis system, 20" x 4" sediment filter, 10" calcite filter, 1HP jet pump, 500-gallon holding tank with float, and 3 years maintenance. Installation must be completed during normal farm business hours between 12/23/2024 and 01/31/2025. The system will process water from two shallow well sources using 1/2" piping and must provide RO quality water for a pair of growth chambers. The contractor is responsible for providing all materials and any required enclosure for the outdoor installation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12405B25Q0043 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12405B
STONEVILLE MS 38776
141 EXPERIMENT STATION ROAD
USDA ARS SEA AAO ACQ/PER PROP
12405B25Q004312/08/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/02/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0001 issued to provide answers to questions submitted by interested contractors.
Q1. What is going to be the average amount of water consumption per day so I can determine how many membranes will I need for this installation.
A1. Average demand is 20 gallons per day, at times as high as 300 gallons per day.
Q2. Can we do a site visit to test the quality of the water and is there dedicated power with GFI available for the pump and the RO system on site?
A2. There is power available.
Q3. What flow rate of water are you requiring?
A3. Average demand is 20 gallons per day, at times as high as 300 gallons per day.
Q4. What is the source of the incoming water? I'm guessing city water.
A4. Irrigation water, from reservoir, average 600- 800 TDS, high iron content.
Continued ...
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12405B25Q0043/0001
Q5. Do you have a water quality report?
A5. Do not have a specific water analysis.
Irrigation water, from reservoir, average 600-
800 TDS , high iron Ferric and ferrous content, some carbonates.
Q6. The SOW mentions system programming. Which component is needing the programming?
A6. Programming of the system installed.
Q7. What are the 2 water sources that are needing to be tied in? What size piping?
A7. Both shallow well water, relatively the same quality Irrigation water, from reservoir, average
600- 800 TDS , high iron Ferric and ferrous content, some carbonate ,½" pipe .
Q8. What is flow required?
A8. Average demand is 20 gallons per day, at times as high as 300 gallons per day.
Q9. How many gallons of RO water required per day?
A9. Average demand is 20 gallons per day, at times as high as 300 gallons per day.
Q10. Do you have a water analysis of source water feeding the RO?
A10. Do not have specific water analysis.
Irrigation water, from reservoir, average 600-
800 TDS, high iron Ferric and ferrous content, some carbonates.
Q11. What is size of room this is to be installed?
A11. System to be located outside growing system containers.
Q12. Power available?
A12. Yes.
Q13. Any door opening size available to move in water treatment equipment?
A13. Located outside of container, if enclosure for water system is required it will have to be provided by vendor.
Contractor to provide a Water Purification System including Installation for a pair of growth chambers. Water Purification System must remove minerals and contaminants providing Reverse
Osmosis (RO) quality water to the pair of growth chambers. Work must be performed in accordance per requirements as detailed in attached
Statement of Work (SOW).
Water Purification System will include:
1 - 12" HE water softener
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12405B25Q0043/0001
1 - 12" HE catalytic filter
1 - Reverse Osmosis (RO) system
1 - 20" x 4" sediment filter
1 - 10" calcite filter
1 - PNE 1Hp jet pump
1 - 500 gallon holding tank with float
3 years maintenance on RO installation
Installation of Water Purification System
The contractor must complete the installation during normal farm business hours. The government will not provide any materials for this installation.
Period of Performance: 12/23/2024 to 01/31/2025
The Service Contract Labor Standards Statute is hereby incorporated into this contract.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .