Amendment 001 - 12405B21Q0086.pdf

PDF 269 KB Posted

Attached to
Electrical Motor Control Center Installation Project - Stoneville MS Federal contract opportunity
Solicitation number
12405B21Q0086
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12405B21Q0086 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-12405B-1

COLLEGE STATION TX 77845

2775 F&B ROAD

USDA ARS SEA AAO ACQ/PER PROP

08/06/20210001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/19/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 001 is being issued to:

1. Provide Questions & Answers (on the pages that follow).

2. Provide the site visit sign in sheet.

3. Add a line item for removal of existing/install new USDA furnished genset and providing the specifications for that line item.

4. Extend the due date for quotes to August 18, 2021 at 2:00 p.m. Central

5. Update the Solicitation Posting, Request for Quote document and the Construction RFQ

Provisions to reflect the updated due date and incorporation of the additional line item.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NICHOLAS LANGLEY

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

The previous Request for Quote document and Construction RFQ Provisions document have been removed as they have been superseded.

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

TEL: EMAIL: nicholas.langley@usda.gov

Electrical Motor Control Center Installation Project One – Stoneville, MS Questions and Answers

1. In reviewing the documents looking for the liquidated damages for this project (for bonding request purposes) but cannot find the data. Could you please tell me where to find it, or how much it is?

Answer: Liquidated Damages have not been recommended for this requirement and are not included.

2. Are we to abandon the existing UG conduits/conductors in place after they have been disconnected from the power source? Answer: Yes.

3. There was mention of installing a new (owner supplied) generator as a part of this project. The site representative reiterated their desire for that work to be a part of this contract. Please confirm and if so, please provide instructions on the exact requirements of the contractor. Also, I have not taken a really deep dive into the documents, so please forgive me if this is already covered in the documents.

Answer: The WARU Genset has been added as a separate line item, please see document titled Specifications WARU Genset for further details.

4. Will you be sending out an attendance sheet for today’s site visit?

Answer: Sign in sheet has been added as an attachment.

5. Are power cords from the aerators to the disconnect pedestals provided by others?

Answer: USDA will provide aerators, supply cords, and male cord plugs. Contractor will provide the receptacle as shown in the plans at the pedestal.

6. Will power cord plugs to match receptacles be provided by others?

Answer: See Q5.

7. How do the aerators function when placed in Automatic? There does not appear to be any control wiring shown on the drawings. Is this wiring by others? The only specific reference found in the specifications with regard to the installation is in Section 01 00 11:

SECTION 01 00 11

1.1.3 Principal Features of Work:

A. Remove existing Aerator controls, wiring and associated hardware.

B. Provide and install new motor control center to operate aerators and interface with new oxygen monitoring and control system being installed by others. Provide all wiring and interface for a complete and operable system.

Answer: USDA requires the control panel switches to have an Automatic setting available for possible future oxygen monitoring system that will be installed and wired by others at a later date.

8. Is a drawing available which locates the oxygen monitoring system panel(s)?

Answer: See Q7.

9. Is there an installation and operation manual for the oxygen monitoring system available which defines the power requirements?

Answer: See Q7.

10. Would the USDA consider extending the deadline for the quotes? This would allow contractors the time to produce their best offerings.

Answer: We will extend to August 18, at 2:00 p.m. Central.