Attachment II - PRD Sample.pdf
PDF 171 KB Posted
- Attached to
- A&E IDIQ Southeast Area Federal contract opportunity
- Solicitation number
- 12405B20R0004
About this file
This document is a Project Requirements Document (PRD) outlining the scope of architectural and engineering services required by the USDA Agricultural Research Service (ARS) for various repair, maintenance, alteration and new construction projects at its research laboratory facilities located throughout the Southeast Area, including Alabama, Arkansas, Florida, Georgia, Louisiana, Mississippi, North Carolina, Puerto Rico, South Carolina, Tennessee, and the U.S. Virgin Islands. The PRD specifies that the scope of A/E services will include energy studies, environmental assessments, building investigations, feasibility studies, engineering design criteria, construction drawings and specifications, cost estimates, bidding support, and construction administration. It also provides the project budget limitation, submittal schedule, and contact information.
The related federal contract opportunity is a solicitation for multiple-award indefinite delivery/indefinite quantity contracts for A/E design and construction management services to support projects identified in the PRD. The contracts would have a base period of one year with four optional one-year extensions, and task orders would be on a firm-fixed price basis. The minimum contract value is $1,000 and maximum is $9 million annually, with an overall maximum of $45 million. Proposals are due by February 7, 2020 and evaluation criteria include experience with agricultural research facilities, staff and technical capabilities, past performance, and office location. The NAICS code is 541330 for architectural, engineering, and related services.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT REQUIREMENTS DOCUMENT
PRD Version 2.9 (July, 2009 ) Page 1of 13
1.0 INTRODUCTION
2.0 CONTRACT PROJECT
3.0 SCOPE OF A-E SERVICES
4.0 RELEVANT DOCUMENTS
5.0 PROJECT SPECIFIC REQUIREMENTS
6.0 PROJECT BUDGET LIMITATION
7.0 PROJECT SUBMITTAL SCHEDULE
8.0 PROJECT CONTACT PERSONS
PRD Version 2.9 (July, 2009 ) Page 2of 13
1.0 INTRODUCTION
Project Requirements
Statement of Work
2.0 CONTRACT PROJECT
3.0 SCOPE OF A-E SERVICES
Statement of Work.
PRD Version 2.9 (July, 2009 ) Page 3of 13
PRD Version 2.9 (July, 2009 ) Page 4of 13
4.0 RELEVANT DOCUMENTS
Note: These documents will be provided separately by the EPM.)
PRD Version 2.9 (July, 2009 ) Page 5of 13
5.0 PROJECT SPECIFIC REQUIREMENTS
(NOTE TO PREPARER: Insert synopsis of the project's development (studies, PORs completed, etc.); a brief description of the scientific program; and a brief description of the project scope in terms of types of facilities and size)
PRD Version 2.9 (July, 2009 ) Page 6of 13
ARS Facilities Design Standards
PRD Version 2.9 (July, 2009 ) Page 7of 13
PRD Version 2.9 (July, 2009 ) Page 8of 13
6.0 PROJECT BUDGET LIMITATION
PRD Version 2.9 (July, 2009 ) Page 9of 13
7.0 PROJECT SUBMITTAL SCHEDULE
PRD Version 2.9 (July, 2009 ) Page 10of 13
NOTE TO PREPARER: Coordinate the number of copies of each submittal document with the appropriate individuals listed on the following pages.)
Pr ed es ig n De sig n
PRD Version 2.9 (July, 2009 ) Page 11of 13
PRD Version 2.9 (July, 2009 ) Page 12of 13
8.0 PROJECT CONTACT PERSONS
File details come from the government source that posted it. Updated .