Amendment 002 - 12405B20R0004.pdf
PDF 97 KB Posted
- Attached to
- A&E IDIQ Southeast Area Federal contract opportunity
- Solicitation number
- 12405B20R0004
About this file
This document provides details for a Multiple-Award Indefinite Quantity Contract solicitation for Architect-Engineering Design and Construction Management/Administration Services. The solicitation seeks firms to provide professional A-E services including architectural, civil, structural, mechanical, electrical and environmental engineering for pre-design, design and post-design phases for research laboratory facilities and specialized farm buildings located throughout the Southeast Area for the USDA Agricultural Research Service. Services will include energy studies, site assessments, investigations, feasibility studies, designs, specifications, cost estimates, construction management, inspection and reports. The base period of performance is 12 months from the date of award with four 12-month option periods. The minimum annual value is $1,000 and maximum is $9 million with a total minimum value of $1,000 and maximum of $45 million. Proposals are due no later than February 7, 2020. The NAICS code is 541330 and the small business size standard is $16.5 million in average annual receipts.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12405B20R0004 x x
3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
COLLEGE STATION TX 77840-4117
ARS-12405B-1
ATTN: Nicholas D. Langley Office # 117
1001 HOLLEMAN DRIVE EAST
USDA ARS SEA AAO ACQ/PER PROP
12/18/20190002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/18/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of Amendment 0002 is to add responses to additional questions received and to provide updated A&E Clauses & Provisions (Sections B-M).
Answers to Q.1. - Q.5. can be found on Amendment 0001.
Additional questions must be submitted no later than Thursday January 23, 2020 at 1:00 p.m.
Eastern Daylight Time, questions submitted after that time will not be answered.
Q.6. Has the USDA adopted the GSA policy and for LEED and SITES certification for its projects to meet sustainability and resilience goals?
A.6. USDA has not adopted the GSA policy for LEED and SITES Certification. It is within
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
CINDY COSE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12405B20R0004/0002 the firm's discretion to include any information regarding their ability to meet sustainability and resilience goals within their statement of qualifications.
Q.7. Do you see a place for SITES certification and or sustainable design services on this IDIQ?
A.7. USDA has not adopted SITES certification.
USDA cannot speak to the amount of sustainable design services that may or may not be required throughout the potential five year contract period. It is within the firm's discretion what information they include in their statement of qualifications.
Q.8. The first sentence reads: In the event that multiple firms competing for the same area are found to be technically equal by the TEP review, those firms will be solicited, cost will be the determining factor for award section. Please clarify this selection process is in accordance with The Brooks Act: Federal Government Selection of Architects and Engineers, Public Law 92-582.
A.8. The reference to comparing cost has been removed from Section M in the Updated A&E Clauses and Provisions 01-17-2020. The selection process is in accordance with the Brooks Act and the procedures outlined in FAR 36.6.
Q.9. In the Updated AE Clauses and Provisions
01-10-2020.pdf, Paragraph M.1, Criteria for
Evaluating Qualifications; subparagraph 1) refers to Executive Order No. 13693 which has been revoked and replaced with Executive Order No.
13834.
A.9. Section M has been updated to reference
Executive Order 13834.
Q.10. It is our understanding from the Updated AE
Clauses and Provisions 01-10-2020.pdf, Paragraph
M.1, Criteria for Evaluating Qualifications; that subparagraphs 1-5 are required (not to exceed 50 pages) in addition to a SF-330. Please note nowhere within the entire Updated AE Clauses and
Provisions is the SF 330 mentioned except as an attachment and in the note below subparagraph 5, at the bottom of page 47 of 48 and on page 48 of
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12405B20R0004/0002
48 within the evaluation charts. Please clarify that this is correct.
A.10. Section M has been updated to reflect that the fifty (50) page limitation applies to Part II
- General Qualifications of the SF-330 and that
Part I - Contract-Specific Qualifications, is excluded from the fifty (50) page limitation.
FAR 36.603(b) states Qualifications data. To be considered for architect-engineer contracts, a firm must file with the appropriate office or board the Standard Form 330, "Architect-Engineer
Qualifications," Part II, and when applicable, SF
330, Part I.
It is the firm's responsibility to address the criteria in Section M within their SF-330 submission where appropriate, be that in Part I, Part II, or both. The Government is not required to repeatedly reference the requirement to submit
SF-330s throughout the solicitation.
Period of Performance: 08/31/2020 to 08/30/2025
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .