This document is a Pre-Bid Tour Q&A Amendment for a USFS contract (12363N26Q4179) addressing the East Boundary Integrated Resource Service Contract (IRSC) at Pike National Forest, Pikes Peak Ranger District. The pre-bid tour was conducted on June 30, 2026, with ten participants representing the contracting agency, Air Force Academy, and prospective bidders.
The Q&A addresses six key clarifications relevant to proposal development: fire precautions and control measures are detailed in Sections 26 and 27 of the solicitation; evaluation criteria including timeliness of completion weighting are specified in Section 32; the 25-foot clearance corridor on existing roads applies to the edge of road per Section 19; pruning work applies to both line items one and two as detailed in Appendix A, Section II; timing restrictions for operations in the Adventure Based Learning area are listed in Section 11, with no cadet trainings scheduled during winter months; and equipment transportation on Air Force Academy roads must be coordinated with USAFA, with all protected improvements identified in Section 20. This amendment provides prospective contractors with clarification on critical technical and operational requirements necessary for preparing competitive proposals.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pike National Forest Pikes Peak Ranger District
East Boundary IRSC Pre Bid Tour
06/30/2026
Participants:
Jamison Brandenburg – USFS Mason Knuthson – USFS Ryan Bouton – USAFA 10CES Easton Eisele – Deer Creek Forestry Kyle Lucas – Sweat US Nick Nunley – Sweat US Shaina Miller – Markit!
Kenny Reid – VM West Sal Ordoñez – Mountain View Reforestation Nick Zouski – N+D Tree
Questions:
Q: Specifics on fire precaution/prevention.
A: All fire precautions and control measures are listed in Sec. 26 and 27 of the solicitation.
Q: Is the timeliness of completion weighted in proposals?
A: All evaluation criteria are listed in Sec 32 of the solicitation.
Q: Does the 25-foot clearance corridor on existing roads apply to the centerline of edge of the road?
A: Clearance corridor applies to the edge of road. Addressed in Sec. 19 of the solicitation.
Q: Does pruning apply to both line items one and two?
A: Yes, pruning applies to both line items. Work specifications are listed in Appx. A, Sec. II.
Q: Is there a better time for operations within the Adventure Based Learning area?
A: All timing restrictions are listed in Sec. 11 of the solicitation, however, there are no cadet trainings scheduled within the ABL during winter months.
12363N26Q4179 Amendment 001
East Boundary SSC IRSC PSICC National Forest Page 1 of 2
Q: Can rubber tired equipment be moved on Air Force Academy Roads?
A: Transportation and relocation of equipment on non-Forest Service properties must be coordinated with the USAFA. All roads and associated features are listed as protected improvements in Sec. 20 of the solicitation.
12363N26Q4179 Amendment 001
East Boundary SSC IRSC PSICC National Forest Page 2 of 2