05_East Boundary_Amend 001_ Site Visit12363N26Q4179.pdf

PDF 630 KB Posted

Attached to
East Boundary - Region 2 - RMRP Stewardship BPA- PSICC NF, Pikes Peak RD
Solicitation number
12363N26Q4179
Issued by

About this file

This document is a Pre-Bid Tour Q&A Amendment for a USFS contract (12363N26Q4179) addressing the East Boundary Integrated Resource Service Contract (IRSC) at Pike National Forest, Pikes Peak Ranger District. The pre-bid tour was conducted on June 30, 2026, with ten participants representing the contracting agency, Air Force Academy, and prospective bidders.

The Q&A addresses six key clarifications relevant to proposal development: fire precautions and control measures are detailed in Sections 26 and 27 of the solicitation; evaluation criteria including timeliness of completion weighting are specified in Section 32; the 25-foot clearance corridor on existing roads applies to the edge of road per Section 19; pruning work applies to both line items one and two as detailed in Appendix A, Section II; timing restrictions for operations in the Adventure Based Learning area are listed in Section 11, with no cadet trainings scheduled during winter months; and equipment transportation on Air Force Academy roads must be coordinated with USAFA, with all protected improvements identified in Section 20. This amendment provides prospective contractors with clarification on critical technical and operational requirements necessary for preparing competitive proposals.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pike National Forest Pikes Peak Ranger District

East Boundary IRSC Pre Bid Tour

06/30/2026

Participants:

Jamison Brandenburg – USFS Mason Knuthson – USFS Ryan Bouton – USAFA 10CES Easton Eisele – Deer Creek Forestry Kyle Lucas – Sweat US Nick Nunley – Sweat US Shaina Miller – Markit!

Kenny Reid – VM West Sal Ordoñez – Mountain View Reforestation Nick Zouski – N+D Tree

Questions:

Q: Specifics on fire precaution/prevention.

A: All fire precautions and control measures are listed in Sec. 26 and 27 of the solicitation.

Q: Is the timeliness of completion weighted in proposals?

A: All evaluation criteria are listed in Sec 32 of the solicitation.

Q: Does the 25-foot clearance corridor on existing roads apply to the centerline of edge of the road?

A: Clearance corridor applies to the edge of road. Addressed in Sec. 19 of the solicitation.

Q: Does pruning apply to both line items one and two?

A: Yes, pruning applies to both line items. Work specifications are listed in Appx. A, Sec. II.

Q: Is there a better time for operations within the Adventure Based Learning area?

A: All timing restrictions are listed in Sec. 11 of the solicitation, however, there are no cadet trainings scheduled within the ABL during winter months.

12363N26Q4179 Amendment 001

East Boundary SSC IRSC PSICC National Forest Page 1 of 2

Q: Can rubber tired equipment be moved on Air Force Academy Roads?

A: Transportation and relocation of equipment on non-Forest Service properties must be coordinated with the USAFA. All roads and associated features are listed as protected improvements in Sec. 20 of the solicitation.

12363N26Q4179 Amendment 001

East Boundary SSC IRSC PSICC National Forest Page 2 of 2

File details come from the government source that posted it. Updated .