This is a contract area map for the East Boundary Integrated Resource Stewardship Contract (IRSC) located within the Pike and San Isabel National Forest, Pikes Peak Ranger District in El Paso County, Colorado. The map covers specific sections (T12S, R67W, Sec 5, 8, 16, 17, 21, 28, 33) within the 6th Principal Meridian.

The map identifies five numbered project units and delineates several key operational areas and features. These include Area to Protect 2 (marked in red), an approved equipment staging area (blue), an approved access route improvement area (tan/yellow), an adventure-based learning course (dotted area), and the overall contract area boundary (dashed line). Protected improvements requiring preservation include gates, powerlines, waterlines, and land survey monuments. Existing roads and approved access routes are marked, with the map also indicating the boundary of Department of Defense property adjacent to the contract area. This map serves as a reference document for defining the geographic scope and operational parameters of the forest management contract.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ò

""8 òò ò ò f ff f!

f f f f

! f f f f f f f

! f f f f f

P

IK

E S

P E

A K

R D

!(5

!(2

!(3

!(4

!(1

East Boundary IRSC Contract Area Map Pike and San Isabel National Forest Pikes Peak Ranger District El Paso County, Colorado T12S, R67W, Sec 5, 8, 16, 17, 21, 28, 33.

6th PM

0 0.25 0.50.13

Miles

J. Brandenburg Current Time: 6/2/2026

3:49 PM

Area to Protect 2 (Call Sec. 19)

""8 Protected Improvement (Gate, Call Sec. 20) ò Protection of Land Survey Monuments (Call Sec. 20)

" " " Protected Improvement (Powerline, Call Sec. 20)

Existing Road (Call Sec. 20)

Approved Access Route f

Protected Improvement (Waterline, Call Sec. 20)

Contract Area Boundary

Adventure Based Learning Course (Call Sec. 11)

Project Unit Boundary

Approved Equipment Staging Area (Call Sec. 19)

Approved Access Route Improvement Area (Call Sec. 19)

Dept. of Defence