This document is an Amendment 0001: Solicitation Attachment 15 Pre-proposal Meeting Handout for the BCLH Stewardship IRSC Phase 1 federal contract opportunity. The solicitation covers hazardous fuels reduction and road maintenance/reconstruction across 1,090 acres located in Marion County, Oregon, within the burn scars of the 2020 Beachie Creek and Lionshead Fires. The project requires cutting and removing fire-killed timber within 100 feet of roads, falling hazard trees, performing small fuels treatment, road reconstruction, and delivering fish logs to specified deck locations.
The contract includes mandatory and optional work items with estimated timber removal volumes of 49,220 tons for mandatory acres and 26,043 tons for optional acres. The total estimated price for road reconstruction work ranges from $5,000,000 to $10,000,000 for mandatory items and $100,000 to $250,000 for optional items. Key contract requirements include operating only during the dry season (May 15 to October 15), protecting special measure areas, implementing erosion control measures, and following specific road use restrictions. The contract will be awarded using a best value source selection method with technical proposals required, and it includes Service Contract Act and Davis-Bacon wage determinations.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP: 12363N254001
BCLH Stewardship IRSC Phase 1
Amendment 0001: Solicitation Attachment 15
Pre-proposal Meeting Handout Meeting Date: 6/30/25; 10:00 am
RFP Section B Excerpts
MANDATORY WORK ACTIVITIES: (Note Added for Meeting: Phase 1 is much larger than Phase 3 and includes significantly more removal)
ITEM
NO.
DESCRIPTION OF
MANDATORY WORK ACTIVITIES UNIT EST
QTY
UNIT
PRICE TOTAL
Cut and Remove Included Fire Killed Timber within 100 feet of the Road Prism (Units LH-
11, LH-11A, LH-11B, LH-11BA, LH-56, LH-
56A, LH-57, LH-58, LH-59, LH-60, LH-61
Acre 323.4 $ $
Required Cost Data:
Total Logging Cost of Item 1 (cut, yard, process, haul, profit, etc.) Do not include the Road Maintenance or Road Reconstruction costs priced separately under Item 5(a-c) and 6(a-t): $____________________________ Total Delivered Value of Item 1 (combined value of all products removed): $___________________________ **Item 1 total price shall equal Total Logging Cost minus Total Delivered Value
Hazard Tree Felling within 100 feet from Road Edge (Units LH-11, LH-11A, LH-11B, LH-11BA, LH-56, LH-56A, LH-57, LH-58, LH-59, LH-60, LH-61)
Acre 284 $ $
Fall & Leave Hazard Trees >100' from Road (Units LH-11, LH-11A, LH-11B, LH-11BA, LH-56, LH-56A, LH-57, LH-58, LH-59, LH-
60, LH-61)
Acre 41 $ $
Small Fuels Treatment <16” DBH 0-30’ from Road Edge (Units LH-11, LH-11A, LH-11B, LH-11BA, LH-56, LH-56A, LH-57, LH-58, LH-59, LH-60, LH-61)
Acre 263 $ $
5 Road Maintenance – Forest Service Roads: 2231000, 2231701, 2231809, 2231810, 2231840, 2231850, 2231870, 4685000, 4685310, 4685312, 4685330
5a: Prehaul Road Maintenance Mile 53.38 $ $
5b: During Haul Road Maintenance Mile 53.38 $ $
5c: Post Haul Road Maintenance Mile 53.38 $ $
Road Reconstruction of Haul Routes Forest Service Roads: 2231000, 2231701, 2231810, 2231840, 2231850, 2231870, 4685000, 4685310, 4685312, 4685330
6(a): Mobilization – 15101 Lump Sum ALL XXXX $
6(b): Soil Erosion and Pollution Control – 15713
Lump Sum ALL XXXX $
6(c): Removal of Culvert, Disposal Method (a)
– 20302 Each 38 $ $
6(d): Removal of Asphalt, Disposal Method
(a) - 20304
Square Yard 60 $ $
6(e): Keyed Riprap, Class 4 – 25104 CY* 5 $ $
6(f): Mechanically Stabilized Earth Wall, Type (b) – 25501 SF* 5,140 $ $
6(g): Reinforced Soil Slope, Type IV – 26101 SF* 37,303 $ $
6(h): Subbase, Grading A, Compaction Method (b) – 30109 CY* 1,036 $ $
6(i): Aggregate Surface Course, Grading F, Compaction Method (b) - 30115B CY* 631 $ $
6(j): Ditch Reconditioning - 30301 Mile 7.01 $ $
6(k): Roadway Reconditioning - 30315 Mile 45.97 $ $
6(l): Full Depth Reclamation, Compaction Method 2 – 30401 Mile 4.49 $ $
6(m): Asphalt Concrete, Type 1, Grading 1/2"- 40301 Ton 9,753.05 $ $
6(n): 24-inch Corrugated Aluminized Steel Pipe, 0.064-inch Thickness, Method 2 – 60201A
Foot 434 $ $
6(o): 36-inch Corrugated Aluminized Steel Pipe, 0.079-inch Thickness, Method 2 – 60201B
Foot 506 $ $
6(p): 48-inch Corrugated Aluminized Steel Pipe, 0.109-inch Thickness, Method 2 – 60202C
Foot 308 $ $
6(q): 60-inch Corrugated Aluminized Steel Pipe, 0.138-inch Thickness, Method 2 – 60202D
Foot 308 $ $
6(r): 24-inch Spillway Pipe, Corrugated Aluminized Steel Pipe, 0.064-inch Thickness, Method 2 – 60605A
Foot 20 $ $
6(s): Gate Installation - 61901 Each 5 $ $
6(t): Temporary Traffic Control Lump Sum ALL $ $
7 Yard and Deliver Fish Logs to Deck Locations 1-3
7a: Deliver Material to Deck Location 1 Lump Sum ALL XXXX $
7b: Deliver Material to Deck Location 2 Lump Sum ALL XXXX $
7c: Deliver Material to Deck Location 3 Lump Sum ALL XXXX $
Total All Mandatory Items $
OPTIONAL WORK ACTIVITIES:
ITEM
NO.
DESCRIPTION OF
OPTIONAL WORK ACTIVITIES UNIT EST
QTY
UNIT
PRICE TOTAL
Cut and Remove Included Fire Killed Timber within 100 feet of Road Prism (Units LH-12, LH-12A, LH-12B, LH-56B, LH-56C, LH-56D, LH-56E, LH-57A, LH-58A, LH-58B, LH-58C, LH-59A, LH-60A, LH-65, LH-9, LH-9A)
Acre 223 $ $
Item 8 Required Cost Data:
Total Logging Cost of Item 8 (cut, yard, process, haul, profit, etc.) Do not include the Road Maintenance or Road Reconstruction costs priced separately under Item 12(a-c) & 13(a-g): $__________________________ Total Delivered Value of Item 8 (combined value of all products removed): $___________________________ **Item 8 total price shall equal Total Logging Cost minus Total Delivered Value
Hazard Tree Felling within 100 feet from Road Edge (Units LH-12, LH-12A, LH-12B, LH-56B, LH-56C, LH-56D, LH-56E, LH-57A, LH-58A, LH-58B, LH-58C, LH-59A, LH-60A, LH-65, LH-9, LH-9A)
Acre 146.4 $ $
Fall & Leave Hazard Trees >100' from Road (Units LH-12, LH-12A, LH-12B, LH-56B, LH-56C, LH-56D, LH-56E, LH-57A, LH-58A, LH-58B, LH-58C, LH-59A, LH-60A, LH-65, LH-9, LH-9A)
Acre 13.4 $ $
Small Fuels Treatment <16” DBH 0-30 feet from Road Edge (Units LH-12, LH-12A, LH-
12B, LH-56B, LH-56C, LH-56D, LH-56E,
LH-57A, LH-58A, LH-58B, LH-58C, LH-59A,
LH-60A, LH-65, LH-9, LH-9A)
Acre 159 $ $
12 Road Maintenance – Forest Service Roads: 231721, 2231730, 2231846, 2231847, 2231873, 2231878, 2231900, 4600030, 4600033, 4688000, 4688240, 4693000, 4693640
12a: Prehaul Road Maintenance Mile 27.73 $ $
12b: During Haul Road Maintenance Mile 27.73 $ $
12c: Post Haul Road Maintenance Mile 27.73 $ $
13 Road Reconstruction of Haul Routes – Forest Service Roads: 2231518, 2231721, 2231730, 4600030, 4600033, 4688000, 4688133, 4688240, 4693000, 4693640
13(a): Mobilization - 15101 Lump Sum ALL XXXX $
13(b): Soil Erosion and Pollution Control – 15713
Lump Sum ALL XXXX $
13(c): Removal of Culvert, Disposal Method
(a) – 20302 Each 1 $ $
13(d): Aggregate Surface Course, Grading F, Compaction Method (b) - 30115B CY* 15
13(e): Roadway Reconditioning – 30315 Mile 26.77 $ $
13(f): 24-inch Corrugated Aluminized Steel Pipe, 0.064-inch Thickness, Method 2 – 60201A
FT 40 $ $
13(g): Temporary Traffic Control - 63501 Lump Sum 1 XXXX $
14 Fall and Leave Individual Hazard Trees >100’ from the Road Each NTE
2,000 $ $
15 LH-62 Hazardous Fuels Treatment
15(a) Remove Downed Trees >16” DBH Within 100 Feet from Road Edge Acre 30.3
15(b) Small Fuels Treatment <16” DBH 0-30 feet from Road Edge Acre 32
Total All Optional Items $
Total All Mandatory and Optional Items
* Contract Quantity is designated with an asterisk. See Section 109.02(b) of the Standard Specifications for Construction and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units incorporated into the contract by reference.
B.2 TIMBER/PRODUCT REMOVAL PRICE SCHEDULES
MANDATORY WORK PRODUCT
OPTIONAL WORK PRODUCT - TIMBER SUBJECT TO AGREEMENT:
AWARD OF OPTIONAL WORK: Optional Items and corresponding timber removal may be awarded at time of contract award or by modification. If funding dictates and it is in the best interest of the government, optional work items may be awarded by treatment Unit and Road for amounts less than the total estimates based on the unit prices quoted. Unit prices prevail.
SPECIES PRODUCT QUANTITY UNIT OF
MEASURE
MINIMUM
ACCEPTABLE
OFFER
OFFER
(FLAT)
TOTAL
OFFER
All Species Grn Bio CV 49,220 Ton $0.40 $ $
SPECIES PRODUCT QUANTITY UNIT OF
MEASURE
MINIMUM
ACCEPTABLE
OFFER
OFFER
(FLAT)
TOTAL OFFER
All Species Grn Bio CV 26,043 Ton $0.40 $ $
All Species Grn Bio CV Un-estimated Ton $0.40 $ $
If all optional construction cannot be awarded, worklists shall be utilized to determine road construction quantities. The lump sum prices for road reconstruction Items 13(a) Mobilization, 13(b) Soil Erosion and Pollution Control and 13(g) Temporary Traffic Control shall be awarded based on the percentage of Item 13(e) Road Reconditioning miles awarded
SPECIAL REQUIREMENTS:
A. Service Contract Act minimum wages applies to all fuels management work and road maintenance work. See Wage Determination in Section J.
B. The road reconstruction work required within Mandatory Items 6(a-t) and Optional Items 13(a-g) is subject the the Construction Wage Rate Requirements (see Wage Decision in Section J) and related regulations, formerly referred to as Davis-Bacon (i.e. certified payroll submission).
C. A Bid Guarantee is required in an amount equal to 20% of the total price offered for the Mandatory and Optional Construction Items only. BID BONDS MUST BE PROVIDED WITH THE INITIAL OFFER. See FAR 52.228-1 Bid Guarantee (SEP 1996) (DEVIATION MAY 2023) in Section I.
D. Payment and Performance Bonds shall be required in an amount equal to 100% of the awarded value of road reconstruction work. See Section I. FAR 52.228-1 Performance and Payment Bonds -- Construction (JUN 2020) (DEVIATION MAY 2023). Bonding costs shall be included in the prices quoted for Mobilization. No separate payment for bond premiums shall be made.
E. As service requirements, fuels management and road maintenance work are not subject to bonding requirements.
F. A Draft Small Business Subcontracting Plan is required with any proposal from a large business. Refer to FAR 52.219-9 Small Business Subcontracting Plan for requirements.
USDA FY2025 Subcontracting Goals as of 2/24/2025 are as follows: Small Business – 22%, Small Disadvantaged Business – 5%, Service-Disabled Veteran-Owned Small Business – 5%, Women Owned Small Business – 5% and HUBZone Small Business – 3%. These goals may be subject to change and were found at the following link: https://www.sba.gov/document/support-agency-contracting-goals.
Click on Download .pdf.
RFP Section C Excerpts
C.1 BACKGROUND
The BCLH Stewardship IRSC Phase 1 shall be awarded under stewardship contracting authority. This authorizes the U.S. Forest Service (Government) to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs.
C.2 SCOPE OF CONTRACT
The objectives of this project are to reduce the risks of hazardous fuels that have fallen across or remain standing along important access routes of the 2020 fire-affected road system so that access to and through the burned area can be restored. Fire severity varied across the treatment areas; burn severity maps and tables are included for planning purposes. Supplemental NEPA was approved which allows mechanized ground-based equipment to operate outside of the road prism on slopes generally less than 30% except for acres located within Special Measure Area 1.
https://www.sba.gov/document/support-agency-contracting-goals
Activities include performing mitigation of risk along roads from fire killed/damaged trees, reduction of roadside fuel accumulation and essential maintenance and reconstruction of roads. This will be done by accomplishing the following:
• Cut and remove fire killed timber within 100 feet of roads from the Contract Area. Hazard trees to be cut are Designated by Prescription.
• Fall hazard trees within Special Measure Areas (SMAs). SMAs may include Riparian Reserves, cultural resource areas, wildlife habitat protection areas or other areas that require special protections.
SMAs do not overlap acres that require the cutting and removal of fire killed trees.
• Within unit boundaries, fall and leave hazard trees that can strike the road outside of the 100-foot fuels removal area.
• Perform small fuels treatment within 30 feet of roads.
• Perform road reconstruction within the Contract Area.
• Perform pre-haul, during-haul and post-haul road maintenance on designated roads within the Contract
Area.
• Yard and deliver fish logs to specified deck locations.
• Fall and leave individual hazard trees that are outside of unit boundary but within striking distance of the road.
• Treat hazardous fuels in Unit LH-62.
C.9 MAGNITUDE OF CONSTRUCTION PROJECT
For Road Reconstruction work requirements, the total estimated price for all Mandatory Items 6(a-t) is between $5,000,000 and $10,000,000. The total estimated price for all Optional Items 13(a-g) is between $100,000 and $250,000.
RFP Section F Excerpts
F.2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/15/2029 for the Mandatory Work Items excluding Item 7 and 10/15/2030 for the Optional Items awarded. Mandatory Item 7(a-c): Yard and Deliver Fish Logs to Deck Locations shall be completed not later than 10/15/2026.
** No operations will occur between October 16 – May 14. See F.4 Contract Operations Schedule below.
F.4 CONTRACT OPERATIONS SCHEDULE
Subdivision Operating Conditions Purpose
ALL No operations will occur between October 16 – May 14.
Protect soil resources and water quality
ALL
Ground-based operations and haul on aggregate surface roads will be suspended during wet periods when soil moisture is high and after heavy or prolonged rain.
Additional measures for clarification:
Protect soil resources and water quality
Ground-based operations would temporarily cease when:
• Precipitation ≥ 0.3” for 3 consecutive days or more.
• Precipitation ≥ 0.6” per 4 hours.
• Precipitation ≥ 1.0” per 24 hours.
• Precipitation ≥2.0” per 72-hours.
Ground-based operations may continue after a shutdown if both of the following conditions are met unless otherwise approved to resume by the COR:
• No rainfall in 48-hours.
Precipitation be measured according to a running average of the data measured from the appropriate Remote Automated Weather Station
(RAWS).
• Primary station: Breitenbush R Abv French CR NR Detroit:
https://waterdata.usgs.gov/monitoring-location/14179000/#dataTypeId=continuous-00065- 0&period=P7D&showMedian=false
Additional visual indicator factors that may require a temporary cessation of operations are visible signs of road damage as described in the 2016 Willamette Road Rules
Road reconstruction as specified in Appendix D shall occur during the dry season (May 15 through October 15). Live stream crossings shall only be replaced during the designated ODFW In- Water-Work Window (June 1 to August 31) for the watershed unless a variance is authorized by ODFW and the FS Fish Biologist.
(Note Added for Meeting: Phase 1 has a significant amount of mandatory culvert replacement. Address this in your schedule.)
To minimize erosion and sediment to streams
Unless agreed to by the contracting officer, fuel treatments shall be completed within one year from when trees are fallen.
Fire safety
ALL Prior to timber haul, prehaul road maintenance shall be completed.
To minimize erosion and sediment to streams
Mandatory:
LH-11, LH-
11B Optional:
LH-12, LH-
12A
Log and fuel hauling by trucks on roads, culvert replacements, mechanical activities, including chainsaw use, log/fuel decking, log and fuel yarding, loading logs and fuels on trucks, and chipping are prohibited from March 15 to July 15 within 65 yards of Northern Spotted Owl Nesting Habitat and Nest Patches.
Restrictions can be waived for mechanical activities if all activities within a potential or known nesting area can be completed within a one-day period during the critical breeding season (March 1-July 15).
See the Table below for the approximate area of each unit impacted by the seasonal restriction.
Nesting Habitat https://waterdata.usgs.gov/monitoring-location/14179000/#dataTypeId=continuous-00065-0&period=P7D&showMedian=false https://waterdata.usgs.gov/monitoring-location/14179000/#dataTypeId=continuous-00065-0&period=P7D&showMedian=false https://waterdata.usgs.gov/monitoring-location/14179000/#dataTypeId=continuous-00065-0&period=P7D&showMedian=false
Unit Total Unit Size
(Acres) Acres Restricted
March 15 to July 15 Percentage of Unit
Restricted
LH-11 48 32 66%
LH-11B 54 12 22%
LH-12 41 24 59%
LH-12A 19 7 37%
TOTAL 162 75 46%
If grey wolf denning or rendezvous sites are identified, the project wildlife biologist will coordinate with USFWS biologists to determine if seasonal restrictions are warranted on logging operations to protect the wolf use of the sites. Typical seasonal restrictions could include a one-mile radius around the sites from April 1-July 15.
However, restrictions are site-specific and depend on things such as individual pack behavior and existing baseline activities by humans in the area.
Grey Wolf
F.5 SCHEDULES AND REPORTS
Contractor shall provide the following submittals as stated below unless otherwise mutually agreed upon. The Contractor shall update all submittals as needed, or as required by the CO, but in no case less than once per calendar year on a date specified by the Contracting Officer:
ITEM DESCRIPTION SUMBITTAL
DUE
COPIES
REQUIRED
Proposed Operation Plan (Overall Schedule): The Contractor shall prepare and submit one electronic copy of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the estimated starting and completion dates of various phases of the work.
The schedule shall comply with the contract time requirements in the contract, including, but not limited to Clauses F.2 and F.4.
With Proposal 1
Schedule for Construction Items: The Contractor shall comply with the requirements of FAR 52.236-15 – Schedules for Construction Contracts. (Clause referenced I.10).
At Prework Meeting 1
Detailed Operation Schedule: During performance, the Contractor shall prepare and submit one electronic copy of a detailed schedule showing Units to be treated, roads to be maintained, and roads and construction items of work to be performed within the next 2 weeks. This schedule shall be submitted weekly. This submittal will serve as the 14-day notice referred to in H.5 for SMA-1 and SMA-3 work activities.
Weekly During Performance 1
Subcontractors. List of proposed sub-contractors and their intended work. For each subcontractor performing construction work, an SF-1413 Statement of Acknowledgement form shall be completed. Sub-contractors must have Contracting Officer’s written approval prior to
Subcontractor List - With Proposal
SF-1413 at Prework
Meeting starting work on the project.
Quality Control Plan. Submit original with proposal. Any updates need to be provided for approval to the CO. Refer to E.1.
With Proposal 1
Small Business Subcontracting Plan. Applies to large businesses only- A Draft Small Business Subcontracting Plan is required with any proposal from a large business. Refer to Solicitation Section I.5, 52.219-9 Small Business Subcontracting Plan for requirements.
With Proposal 1
Traffic Control Plan. The Contractor shall prepare and submit a Traffic Control Plan detailing conformance with OSHA requirements, MUTCD requirements, and all other contract requirements, including, but not limited to Paragraph H.17, “Traffic Control Plan” and the requirements included in the Appendices, if any.
At Prework Meeting 1
Soil Erosion and Water Pollution Control Plan. The Contractor shall prepare and submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after contract performance. Plan shall conform to all contract requirements, including but not limited to H.6, “Erosion Prevention and Control”, and the requirements in the Appendices, if any.
At Prework Meeting 1
Safety Plan. The Contractor shall comply with the requirements of FAR 52.236-13 – Accident Prevention Alt I, for all activities under this contract.
With Proposal 1
Designation of Contractor personnel describing responsibilities and authorities.
At Prework Meeting 1
BioBased Report. Submit annually via sam.gov. Refer Section C.7. October 31
Service Contract Inventory Report. Submit annually via sam.gov. Refer to Section I.1 – FAR 52.204-14. October 31
(Note Added for Meeting: Service Contract Report is being emphasized by the WO. Compliance is required to be addressed in CPARS. If you don’t have your report done, your rating for Management will suffer. I do not monitor this; by the time I am notified of a contractor’s non-compliance, it is often too late for the contractor to remedy.)
RFP Section H Excerpts
H.4 SAFETY
Logging operations, thinning, slash treatments, and roadwork are inherently hazardous. Conditions, which are inherently hazardous, that could lead to serious injury or loss of life include, but are not limited to:
1. Traffic hazards 5. Heavy equipment operations
a. Narrow gravel or native surface forest roads, some single lane with turnouts (limited visibility)
a. Backing into objects
b. Long, steep grades (less than 20%) b. Steep side slopes or soft ground for rollovers
c. Logging, Administrative, and Recreational Traffic
c. Refueling hazards
d. Unskilled visitor traffic d. Exceeding equipment limitations
e. Dusty conditions hindering visibility behind vehicles
e. Unsafe equipment / lack of safety equipment
f. Horse traffic at crossings f. Operator fatigue
g. May be overwidth/overweight equipment to watch for on roads
2. Work environment 6. Excavation
a. Inclement weather for potential hypo/hyperthermia
a. Slope or trench wall instability
b. High winds that can bring down trees and blow dust
b. Air quality/ventilation
c. Wet, snowy or ice conditions making ground unstable
d. High db noise 7. Truck Driving & Trailer Towing
e. Insects, plants, animals a. Increased stopping distance
f. Hazardous footing/terrain b. Loads insecurely lashed
c. Low clearances (power lines, etc.)
3. Communications
a. Cell phone or radio availability for emergencies
8. Personnel
4. Chainsaw operations a. Carry adequate liquids to prevent dehydration
a. Improper safety equipment b. Dress for working conditions including wearing appropriate safety equip.
b. Overhead/falling debris c. Keep in communications for safety
c. Fatigue/improper cutting techniques
H.5 PROTECTION MEASURES NEEDED FOR PLANTS, ANIMALS, CULTURAL RESOURCES,
AND CAVE RESOURCES
Label on Contract Area Map Restrictions
SMA-1
Mandatory: LH-11, LH-
56, LH-57, LH-58, LH-59,
and LH-60 Optional: LH-
12, LH-12A, LH-12B, LH-
56B, LH-56C, LH-56E,
LH-58A
1) Special Measure Areas (SMA-1) that are designated on the Tree Removal Guideline Maps shall be protected from all ground disturbing activities. Full suspension is required for removal under Mandatory Items 2 and 4 and Optional Items 9 and 11. Hazardous fuels will be felled and left on site if full suspension cannot be achieved.
2) No mechanized equipment is allowed to leave the road prism within
SMA-1.
3) No log decks in SMA-1.
4) A 14-day notice of intent to begin operating in SMA-1 is required to allow time for consultation with a professional, qualified archaeologist regarding direction of felling. Notice shall be submitted to the COR. FS personnel shall flag known cultural resources in advance of the commencement of hazard tree falling.
5) Hazard trees must be felled away from known archeology sites within SMA-1 in consultation with a professional, qualified archeologist.
6) Culturally modified trees shall remain on site, if feasible. If not, culturally modified trees shall be stored at a temporary location, separate from non-culturally modified trees, until final disposition can be determined. Avoid cutting trees through the “peel”. Coordinate with FS archaeologist if tree must be moved.
Label on Contract Area Map Restrictions
SMA-2
ALL Units contain SMA-2 areas
1) Special Measure Areas (SMA-2) that are designated on the Tree Removal Guideline Maps shall be treated to ensure tree retention requirements are met.
2) All Riparian Reserves must be delineated by the contractor prior to starting work in a unit. Boundaries will extend from the stream edge on the ground, not the mapped edge since stream mapping may be incorrect.
If an unmapped stream is found, SMA restrictions are still applicable.
3) Within SMA-2, mechanized equipment is restricted from operating within 100 feet of fish bearing streams, 60 feet of perennial, non-fish bearing streams, and 30 feet of intermittent streams. The presence of fish can be determined by the width of the SMA as displayed on the Tree Cutting Guideline maps (344’ on either side of a stream indicates fish presence).
SMA-3
Mandatory: LH-11, LH-
11A, LH-11B, LH-56, LH-
56A, LH-59, and Optional:
LH-12, LH-56D
1) Special Measure Areas (SMA-3) that are designated on the Tree Removal Guideline Maps shall be protected from all ground disturbing activities.
2) Hazardous fuels will be felled and left on site except for small fuels treated under Items 4 and 11.
3) A 14-day notice of intent to begin operating in SMA-3 shall be submitted to the COR and is required to allow time for consultation regarding locations of rare plant populations and wetlands.
4) Directionally fall trees to protect rare plant populations or their habitats.
5) In wetlands, fall trees toward the wetland.
6) No mechanized equipment is allowed to leave the road prism and operate within SMA-3 buffers unless pre-approved by COR.
Wilderness Protection
Mandatory: LH-11, LH- 11A
1) No treatment beyond 150 feet measured from the Road Centerline where the Wilderness Boundary is 200 feet from the road edge.
H.6 EROSION PREVENTION AND CONTROL
Contractor’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. The kinds and intensity of erosion control work done by Contractor shall be adjusted to ground and weather conditions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding expected seasonal periods of precipitation or runoff. By October 1 of each respective year, erosion control measures shall be installed at disturbed landings and the roads shall be prepared for winter conditions. If Contractor fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, Forest Service may temporarily assume responsibility for the work and the Contractor shall be liable for the cost of the supplies and labor utilized.
There are no temporary roads being constructed under this contract. Logging equipment operations and landing locations are restricted to existing roads only. No new landings shall be constructed without prior approval of the Forest Service. Use of existing vegetatively recovered landings is prohibited within 200 feet of any live stream channel.
a. Seed and mulch will be applied as indicated below. All applications shall be current and done during the period from May 15 to October 1 unless otherwise agreed to. Applications shall be done only during favorable conditions.
Seed mixture will be any of the following: winter wheat, spring wheat, or triticale. Seed shall be applied at a rate of 20/lbs per acre. Seed will be certified weed free (Blue tag). The contractor shall purchase the seed.
Mulch shall meet the appropriate State's certification specifications, with evidence of its certification traceable to the certifying agency's records. It shall be applied within 48 hours after seeding and shall provide approximately 50% coverage of the disturbed ground.
b. Erosion Control on all roads used by Contractor.
1. Erosion control devices such as silt fences, straw bales, and/or cross drain culverts shall be installed immediately upon reaching live stream crossings after hazard trees are abated. Cross drain culverts must be within approximately 200 feet of the stream crossing to function as an erosion control device.
2. When ditch lines are cleaned in moderate to high burn severity areas, or ditches are moving sediment and are hydrologically connected to any stream, install an effective sediment barrier to prevent ditch erosion from entering streams (e.g., wattles, straw bales, mulching cleared ditches within 100 feet of stream crossing culverts) until vegetation is re-established.
3. Dust abatement is limited to the application of water.
H.8 PROTECTION OF IMPROVEMENTS
During the period specified in H.21.1 Fire Precautions and Control, the Contractor shall keep all roads and trails needed for fire protection or other purposes and designated on the Contract Area Map reasonably free of equipment and products, slash, and debris resulting from the Contractor’s operations.
All protected improvements will be protected from damage by the Contractor. If any protected improvements are disturbed, the Contractor shall immediately contact the COR and will be liable for the cost of repairs.
PROTECTED IMPROVEMENTS
IMPROVEMENT FEATURE DESCRIPTION SPECIAL REQUIREMENT
Roads
All Roads (including associated features) adjacent to treatment units or used for haul of commercial product or fish logs.
Identified on the CAM.
No tracked equipment shall be offloaded or operated on paved roads to access areas being treated or utilized for this contract. FSR 4600000 and 2231000 are roads of special concern.
Gates Identified on the CAM.
Contractor furnished locks may be installed as needed provided that Forest Service locks remain accessible through the use of a splitter or other means.
Trails
South Breitenbush Gorge Trailhead, South Breitenbush Trailhead and Roaring Creek Trailhead.
Directional felling shall be utilized to fall away from system trails and trailheads. Do not drag trees across system trails. If a tree falls across a trail, the section blocking the trail shall be bucked out and rolled off the trail.
H.16 ROAD MAINTENANCE
Unless agreed in writing, prehaul maintenance shall be completed on any portion of road prior to hauling on that portion. Maintenance, as used in this contract, does not include road reconstruction or repairs of an extraordinary nature.
H.21 AGAR 452.236-70 EMERGENCY RESPONSE, FIRE SUPPRESSION, AND LIABILITY (JUN
2025)
(a) Contractor's Responsibility for Responding to Emergencies. When directed by the contracting officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). This is considered to be within the general scope of the contract. An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.
(b) Contractor's Responsibility for Fire Fighting. The Contractor, under the provisions of FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents, subcontractors, or employees subject to the fire classifications listed in subsection (c).
(c) Fire Suppression Costs. The Contractor's obligations for cost of fire suppression vary according to three classifications of fires as follows:
(1) Operations Fire. An “operations fire” is a fire caused by the Contractor's operations other than a negligent fire. The Contractor agrees to reimburse the Forest Service for such cost for each operations fire, subject to a maximum dollar amount of $300,000.00. The cost of the Contractor's actions, supplies, and equipment expended or used on suppressing any such fire, or otherwise provided at the request of Forest Service, shall be credited toward such maximum. If the Contractor's actual cost exceeds the contractor's maximum obligation stated above, the Forest Service shall reimburse the contractor for the excess.
(2) Negligent Fire. A “negligent fire” is a fire caused by the negligence or fault of the Contractor's operations including, but not limited to, one caused by smoking by persons engaged in the Contractor's operations during the course of their employment, or during rest or lunch periods; or if the Contractor's failure to comply with requirements under this contract results in a fire starting or permits a fire to spread. Damages and the cost of suppressing negligent fires shall be borne by the Contractor.
(3) Other Fires on Contract Area. The Forest Service shall pay the Contractor, at firefighting rates common in the area or at prior agreed rates, for equipment or personnel furnished by the Contractor at the request of the Forest Service, on any fire on the contract area other than an operations fire or a negligent fire.
(d) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(e) Performance by the Contractor. Where the Contractor's employees, agents, contractors, subcontractors, or their employees or agents perform the Contractor's operations in connection with fire responsibilities, the Contractor's obligations shall be the same as if performance was by the Contractor.
(f) State Law. The Contractor shall not be relieved by the terms of this contract of any liability to the United States for fire suppression costs recovered in an action based on State law, except for such costs resulting from operations fires. Amounts due to the Contractor for firefighting expenditures on operations fires shall not be withheld pending settlement of any such claim or action based on State law.
(End of Clause)
H.21.1 FIRE PRECAUTIONS AND CONTROL
Specific fire prevention measures are listed below and shall be effective for the period April 1 to October 31 of each year.
RFP Section I Excerpts
CLAUSES I.1-I.7 APPLY TO ALL WORK:
FAR 52.204-14 Service Contract Reporting Requirements (OCT 2016) *yearly reports due by October 31; compliance will be assessed in CPARS
FAR 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) FAR 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) *14-day payments
FAR 52.243-4 Changes (JUN 2007) *Modifications will be negotiated and priced up front; close coordination with the CO and COR will be required
I.5 FAR 52.219-9 Small Business Subcontracting Plan (JAN 2025)
(a) This clause does not apply to small business concerns.
CLAUSES I.10-I.15 APPLY TO ROAD RECONSTRUCTION ITEMS ONLY
FAR 52.222-8 Payrolls and Basic Records (JUL 2021) FAR 52.246-21 Warranty of Construction (MAR 1994) *1-year warranty applies to all construction work
I.12 FAR 52.228-1 BID GUARANTEE (SEP 1996) (DEVIATION MAY 2023)
The required bid guarantee amount is 20% of the total offer value of all Mandatory and Optional road reconstruction pay items: 6(a-t) and 13(a-g). The bid guarantee must be submitted electronically with the offer.
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
RFP Section J Excerpts The following attachments are made a part of this solicitation and any resultant contract.
# TITLE Pgs
1 Appendix A – Performance Work Statement for Service Items 22
2 Appendix B – Timber Removal Specifications - Scaled 24
3 Appendix C – Road Maintenance Specifications 39
Appendix D - 4a: BCLH IRSC PHASE 1 - FS Supplemental Specifications Road Reconstruction 4b: BCLH IRSC PHASE 1 – Signed Road Reconstruction Plans
5 Willamette National Forest Commercial Road Rules December 2016 14 https://www.usda.gov/sites/default/files/documents/far-class-deviation-eliminate-hard-copy-original-documents-signatures-notarization-seals-bonds-other-seals.pdf
6 Contract Area Map (CAM) 1
Tree Removal Guideline Maps (Maps have been uploaded to sam.gov in a zip files due to size. A Grid Map Locator has also been provided to orient each map into the overall landscape.)
8 Burn Severity Map 1
9 Burn Severity Table 1
10 Small Fuels Treatment Photo Series 3
11 Forestry Services – SCA Wage Determination #1977-0079 Revision #78 dated 12/23/2024 4
12 Highway Construction – Davis-Bacon Wage Decision #OR20250001 Dated 4/11/2025 24 13 Shape Files n/a
RFP Section L Excerpts
L.5 INSTRUCTIONS FOR SUBMISSION OF OFFERS AND OTHER INFORMATION
(a) General Instructions
The offer must include a technical proposal and price proposal. Each of the parts shall be separate and complete so that evaluation of one may be accomplished independently from evaluation of the other. The technical proposal must not contain reference to price/cost; however, resource information (such as data concerning labor hours and categories, materials, subcontracts, etc.) must be contained in the technical proposal so that the contractor's understanding of the statement of work may be evaluated. The price proposal shall be submitted using the solicitation forms; aside from the aggregated logging costs and delivered product values associated with Mandatory Item 1 and Optional Item 8, no breakdown of unit prices is required.
Offerors are cautioned that sufficient and detailed information must be presented in their technical proposals to enable the Government to evaluate their proposals fully in accordance with the evaluation and award criteria contained herein. The Government is not obligated to ask for additional information and in the absence of required information, the proposal shall be rated deficient.
Offerors may, at their discretion, submit alternate proposals or proposals which deviate from the requirement;
provided, that an offeror also submit a proposal for performance of the work as specified in this solicitation. Any "alternate" proposal may be considered if overall performance would be improved or not compromised, and if it is in the best interest of the Government. Alternate proposals, or deviations from any requirement of this RFP, must be clearly identified.
The Government will evaluate proposals in accordance with the evaluation criteria set forth in Section M of this
RFP.
Offerors shall submit their proposal(s) electronically to the Issuing Office (karen.ruklic@usda.gov). It is the vendor’s responsibility to ensure delivery of all required documents by the date and time set for receipt of offers. All proposals shall include:
(1) One copy of the completed, signed Standard Form 33 (blocks 12-18 completed).
(2) One copy of the price proposal - Section B, Schedules of Items with all blocks completed. All
Mandatory and Optional Items must be priced. Timber Product Removal Price Schedule and Timber Subject to Agreement Price Schedule with all blocks completed. Offers (Flat) must meet or exceed the Minimum Acceptable Offer Amounts.
(3) One copy of Section K completed. There is no need to return the entire solicitation, just the applicable mailto:karen.ruklic@usda.gov provisions in that section.
(4) Acknowledgement of solicitation amendments (if any). This can be accomplished by completing section 14 on the SF-33 or by submitting the signed SF-30(s) from https://sam.gov with your price proposal.
(5) Scanned copy of fully executed Bid Guarantee (Standard Form 24 and Power of Attorney). See I.12 for specific requirements.
(6) One copy of the technical proposal responsive to all Evaluation Criteria.
(b) Technical Proposal -The technical proposal must present sufficient information to reflect a thorough understanding of the requirements and a detailed description of the organization, techniques, and procedures for achieving the objectives of the specifications and the project. Proposals that merely paraphrase the requirements of the Government's specifications or use such phrases as "will comply" or "standard techniques will be employed" will be considered unacceptable and will not be considered further. As a minimum, address the following evaluation criteria and provide the following information:
(1) Technical Approach
(i) Work Activity Plan. Clearly describe how you and/or your subcontractors will meet the project objectives while minimizing resource damage and ensuring a safe working environment. Include an explanation about how you have determined this approach, and what coordination will occur between the various operations. Limit your description to 2 pages.
(ii) Method. Describe the method or combination of methods you plan to utilize to accomplish the Mandatory and Optional Work Items. Please limit this narrative to 4 pages. Include responses to each of these end results, specifications, and objectives:
• How will operations implement and accomplish the identification, cutting and removal from NFS land (when applicable) of fire killed and damaged trees?
• How will roadside small fuels be treated?
• Describe how product will be sold or otherwise disposed of.
• Detail if and/or how non-traditional methods of disposal and/or beneficial reuse, such as air curtain burners, carbonizers, or biochar production may be used. If a non-traditional disposal method is proposed, describe the product type/size planned for each disposal type with an estimated tonnage.
• Provide a Quality Control Plan that details how operations will be implemented to assure that the work performed will meet or exceed contract requirements.
The QCP shall specify:
How quality will be monitored and reported to the Contracting Officer and the COR to assure the performance standards are met, including plot numbers and plot size and types, and sample design (units with spacing)?
How work will be inspected if plots will not be used (visual inspection)? What type of equipment will be used to inspect?
What personnel will perform the quality control? Indicate whether persons who will conduct inspections will have other responsibilities (supervision, production work, etc.)?
How will the work be supervised?
• Provide a Safety Plan that details how operations will be implemented to mitigate safety concerns.
The Safety Plan shall at a minimum specify:
Describe how your operations will safeguard worker and government employee safety.
What specific safety measures will be implemented and how will they be reported to the Contracting Officer and the COR to assure mitigations are in place?
What training shall be provided to employees and what resources will be available to them in the event of an emergency?
• How will operations accomplish the relocation of fish logs to the three designated locations?
• How will operations implement and accomplish road maintenance and road reconstruction work within the schedule constraints?
• How will operations be performed to protect natural resources and protected improvements located within the project area?
• For large businesses only – provide a Draft Small Business Subcontracting Plan. Refer to Section I: 52.216-9 Small Business Subcontracting Plan provided in full text for requirements.
(iii) Equipment. Describe the equipment you will use to accomplish the Mandatory and Optional Work Items. Include make and model of proposed equipment as well as equipment specifications if needed to demonstrate that the equipment will meet performance requirements. Please limit this information to 1 page.
(iv) Key Personnel. List the names and proposed duties of key personnel who will be assigned to the various work items of the project including, at a minimum, the overall Project Manager, Logging Supervisor, Construction Site Superintendent, and individual sub-managers (such as individuals supervising sub-contractors). In addition, describe the crew(s) to be utilized. Limit this response to no more than 2 pages.
(v) Timing. Provide a general plan for the sequence of work, including an estimated start date and completion date for both the Mandatory and Optional work items. Provide estimated daily production rates to complete hazard tree treatments with the period of performance. Address all Section F completion deadlines and restrictions. Please limit this information to no more than 2 pages.
(2) Relevant Past Performance - Submit past performance information for both the Offeror and any proposed major subcontractors. OFFERORS SHOULD PROVIDE ONLY THE INFORMATION LISTED BELOW. Performance information will be requested from references provided and other known clients. Limit your response to no more than 3 pages.
Names, addresses, emails, and telephone numbers of principal officials in charge of the project who are familiar with your performance.
Contract Numbers and the agency/company or individuals contracting the work.
Brief descriptions of work and Key Personnel utilized.
The size (dollar value and acreage/miles treated) and location of the work.
If applicable, provide information on problems encountered on the contracts listed and disclose accidents/incidents that occurred along with corrective actions taken to resolve the problems.
List and describe similar project work currently in progress or completed by your firm and proposed major subcontractors in the last 3 years. Experience with implementation and successful accomplishment of Designation x Prescription treatments should be noted within the past 5 years.
Address past work specifically related to the work items shown in the Schedule of Items.
(3) Benefit to Local Community – For the purposes of this solicitation, “local” is identified as Lane, Linn and Marion counties. Contractor, subcontractor, and employee locations for determination of “local” will be based on primary business/home address.
(i) Describe how you will recruit and utilize local labor, including the hiring or training of local residents as employees or as subcontractors. Describe efforts to retain, expand and create employment or training opportunities in the local community.
(ii) Describe how and to what degree materials, supplies, lodging, meals, or incidentals would be purchased within the local community.
(iii) Describe how any materials removed from Forest Service lands would be marketed;
specifically, detail to which enterprises the timber products will be sold or otherwise disposed of in the local community or elsewhere. Describe contributions to the development of biomass energy, integrated utilization, and/or value-added products for an existing market or emerging market (if applicable).
(c) Price Proposal - To fulfill the Government’s price proposal requirements, offerors shall provide unit prices (where applicable) and total amounts in the Schedules of Items in Section B of the solicitation.
Offerors must provide prices for all Mandatory Work Activities and a corresponding offer within the Timber/Product Removal Price Schedule for Mandatory Item 1 product removal. Offerors shall also provide prices for all Optional Work Items and offers for the product that may be removed via Timber Subject to Agreement (TSTA) if Optional Items 8 and/or 15 are awarded or other TSTA is removed. The un-estimated TSTA corresponds with product that may be removed from SMAs, as a result of small fuels treatments or as a by-product of construction work.
**Offerors shall also provide logging costs and delivered product values associated with Mandatory Item 1 and Optional Item 8. This data shall be used for government review purposes only, is considered proprietary, will not be made public, and will not be incorporated into the awarded contract.
Appendix A Excerpts
SECTION II – WORK ITEMS
SECTION II – WORK ITEMS
The following requirements apply to work items 1-3, 8-10 and 14. The general yarding specifications also apply to work item 15.
1. GENERAL FELLING AND YARDING SPECIFICATIONS
• Notwithstanding Appendix B, provisions B6.41, B6.411, B6.5 and B6.61, felling objectives shall be accomplished in accordance with the requirements detailed below.
• To protect streams and streambanks from damage, trees that are adjacent to Riparian Reserves should be felled away from, or parallel to, the Riparian Reserve.
• Within Riparian Reserves, fall trees larger than 16 inches in diameter into stream channels but do not block the inlet or outlet of a culvert or create a road side hazard.
• Fuel and other petroleum products must be stored and refueling must occur at least 150 feet from any stream or other waterbody.
• Mechanized equipment used for felling and/or yarding are allowed outside of the road prism on slopes less than 30%. Equipment is allowed to traverse short pitches (less than 250 feet) on vegetated slopes of less than 45% to access benches or plateaus.
• Ground based equipment is only allowed to operate outside of the road prism on designated skid trails.
Skid trails shall be placed a minimum of 50 feet apart, not exceed 15 feet wide with an average width no greater than 12 feet, and ground-based equipment will make no more than three passes per trail.
• Off-road yarding operations will achieve full-suspension of logs to the maximum extent possible and will maintain a minimum of one-end suspension when transporting logs along trail corridors.
• Ground-based equipment shall not operate within 200 feet of bogs or wetlands.
• Ground-based equipment shall not operate within 30 feet of any perennially wet areas.
• Skidding logs down roadways is prohibited.
• Cut stumps to a maximum height of 12 inches, or 1/3rd of stump diameter.
• Yarding and decking operations (i.e., log loader) must avoid blocking drainage features (i.e., ditch lines, cross drain culverts, stream crossings) to the maximum extent possible. Log decks shall not be placed in ditch lines or within 100 feet of a defined stream course (i.e., showing annual scour).
• Where slopes do not allow for decking off the road on the uphill side, decking is to occur on the downhill side of the road, off the road. “High Stumping” is required to allow logs to be decked on the downhill side in a safe manner. After logs are removed, cut stumps off at 12 inches and leave the “high stump” on the ground.
• Whole tree yarding is required.
Phase 1
Estimated Acres below 30% slope by unit inclusive of Mandatory Pay Items 1, 2, & 3
Unit Total Unit Size (Acres) Acres <30% Slope Percentage of Total
Unit Size <30% Slope
LH-11 149 66 44%
LH-11A 21 6 29%
LH-11B 105 29 28%
LH-11BA 30 8 27%
LH-56 18 14 78%
LH-56A 26 8 31%
LH-57 48 21 44%
LH-58 141 65 46%
LH-59 75 36 48%
LH-60 33 14 42%
LH-61 2.4 1 42%
TOTAL 648.4 268 41%
Estimated Acres below 30% slope by unit inclusive of Optional Pay Items 8, 9, 10 & 15
Unit Total Unit
Size (Acres)
Acres <30% Slope
Percentage of Total Unit Size
<30% Slope
LH-12 82 28 34%
LH-12A 24 14 58%
LH-12B 1 1 100%
LH-56B 15 8 53%
LH-56C 45 18 40%
LH-56D 81 38 47%
LH-56E 29 9 31%
LH-57A 11 6 55%
LH-58A 2 1 50%
LH-58B 3 2 67%
LH-58C 2 1 50%
LH-59A 1 1 100%
LH-60A 5 2 40%
LH-65 8 6 75%
LH-9 65 21 32%
LH-9A 4 1 25%
LH-62 30.3 9 31%
TOTAL 349.3 166 48%
The following requirements apply to work items 1-3, 8-10 and 14. The general removal specifications also apply to work item 15.
2. CUTTING AND REMOVAL SPECIFICATION FOR HAZARD TREES
DESIGNATION BY PRESCRIPTION. Within Subdivision(s) or cutting unit(s) Mandatory: LH-11,…