A002 Caldwell-Gold IRSC.pdf

PDF 238 KB Posted

Attached to
CALDWELL GOLD DISASTER RELIEF IRSC, Modoc NF, Big Valley & Double Head Ranger Districts, R5 CA
Solicitation number
12363N22Q4077
Issued by

About this file

This document package includes an amendment to a solicitation and related federal contract opportunity. The amendment modifies solicitation 12363N22Q4077 for a CALDWELL GOLD DISASTER RELIEF IRSC on the Modoc National Forest. The scope of work involves felling dead trees 3" to 40+" DBH and piling them for burning by the Forest Service or for utilization as biomass under a subject-to-agreement provision. The work will cover approximately 515 acres across the Caldwell and Gold fire areas and must be completed by October 31, 2024. The contract will be a firm fixed price commercial services contract awarded using best value tradeoff. Offerors must have an active SAM registration by the proposal due date to be eligible for consideration.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

002 09/2/2022 1074027

6. ISSUED BY CODE 363N 7. ADMINISTERED BY (If other than Item 6) CODE 9A08

USDA Forest Service Procurement & Property Services National Stewardship Contracting Branch Mark.Phillipp@usda.gov Nikki.Layton@usda.gov

USDA Forest Service MODOC National Forest Big Valley and Doublehead Ranger Districts Adin, CA 96006

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

X 12363N22Q4077

9B. DATED (SEE ITEM 11)

08/09/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. he hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment;

(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or

(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: 52.211.18 THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 1 and 2.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Solicitation 12363N22Q4077 - Amendment 002 Caldwell-Gold Disaster Relief STEWARDSHIP IRSC

Modoc National Forest - Big Valley and Doublehead Ranger Districts

Proposal Due Date 09/08/2022 is unchanged

**See page 2 for amendement details**

Except as provided herein, all terms and conditions of the documents referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

MARK T. PHILLIPP

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

mailto:Mark.Phillipp@usda.gov mailto:Nikki.Layton@usda.gov

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE 2 of 2

Amendment 002 Caldwell-Gold Disaster Relief Stewardship IRSC

Modoc National Forest Big Valley & Doublehead Ranger Districts

12363N22Q4077

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Contract Corrections:

1. Question-Are Caldwell interior unit 5 and Gold intertior 23 included? No these two units were dropped out of the project. Caldwell interior unit 5 and Gold interior unit 23 included?

2. Solicitation page 2 Schedule of Items will be replaced to reflect updated acres and units. Refer to Amendment 002 Attachment A. Bidders are to replace the Schedule of Items in the solicitation with the revised Schedule of Items provided in Attachment A. Offerors must use this schedule in order to be considered responsive. Changes will be shown in red text.

Gold Roadside unit 946 was dropped and removed from the Schedule of Items.

3. Appendix A pages 1 and 2 will be replaced by attached pages 1 and 2 (Amendment 002 Attachment B).

Mandatory Item 1:

Gold Roadside Units total will be revised from a total of 139 acres to 150 acres shown in red text.

Optional Item 2:

Gold Interior Units total will be revised from a total of 229 acres to 243 acres shown in red text.

4. Replaces Contract Area Maps (CAM) which had missing unit numbers. Updated CAM’s with water sources will be made available after award.

Caldwell Gold Stewardship IRSC Modoc National Forest Solicitation 12363N22Q4077 Big Valley & Double Head Ranger District

Amendment 002 Attachment A

GENERAL INFORMATION:

Refer to Provision 57 for instructions on preparing your technical proposal and pricing. Submit technical proposals and price proposals in separate documents, via email, to the individual shown in box 28 of page 1.

Bonds: Bid Bonds, Payment Bonds, and Performance Bonds are not required for this project.

All Contractors must be actively registered in the System for Award Management (SAM) (https://SAM.gov) to be eligible for award under this solicitation. If not actively registered by time of proposal evaluations, you will be found non-responsive. Registration in SAM is a free service – you do not need to pay to register in this system. If your registration is not active, you will not be considered for award.

***OFFERERS ARE TO REPLACE THE SCHEDULE OF ITEMS IN THE SOLICITATION

WITH THIS UPDATED SCHEDULE OF ITEMS TO BE CONSIDERED REPSONSIVE ***

SCHEDULE OF ITEMS

MANDATORY WORK ACTIVITIES:

ITEM

NO.

DESCRIPTION OF

MANDATORY WORK ACTIVITIES UNIT

ESTIMATED

QUANTITY

UNIT

PRICE TOTAL

Cut and Pile Fire Killed Roadside Trees Units Gold (304, 333, 346, 724, 846) (150 Acres) and Caldwell (401, 422, 428, 804) (376 Acres)

ACRE 526 $ $

Total All Mandatory Service Items

OPTIONAL WORK ACTIVITIES:

ITEM

NO.

DESCRIPTION OF

OPTIONAL WORK

ACTIVITIES UNIT

ESTIMATED

QUANTITY

UNIT

PRICE TOTAL

Cut and Pile Interior Units Units (Gold, 1 to 39) 243 Acres and (Caldwell, 1 to 9) 248 Acres

ACRE 491 $ $

3 Removal of TSA Products TONS $ $

Total All Optional Service Items $

TIMBER SUBJECT TO AGREEMENT PRICE SCHEDULE:

SPECIES PRODUCT QUANTITY UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

OFFER

(FLAT)

TOTAL

OFFER

Mix Conifer Biomass 43,483 TON $0.01 $ $

Mix Conifer Biomass TON $0.01 $ $ Total – All Products $

Page 1 of 2 Big Valley Ranger District

Amendment 002 Attachment B

APPENDIX A

TECHNICAL SPECIFICATIONS FOR SERVICE WORK ITEMS

SECTION I – DESCRIPTION OF WORK:

The objectives of this project are to rehabilitate and site preparation for future forests, reduce hazardous fuels in order to reduce the threat of catastrophic wildfire by accomplishing the following:

1. Cut and pile or remove dead hazard trees along the Forest Road system.

2. Cut and pile or remove dead trees from interior units.

3. Mechanically remove all fire killed trees to piles in the contract area to be burned by Forest Service personnel or chipped/removed from contract area.

4. Remove subject to agreement biomass or timber from the Contract Area.

SECTION II – WORK ITEMS

Mandatory Item 1: Cut and Pile Fire Killed Roadside Trees:

Gold Units (150 Total Acres) - 304 (18 ac), 333 (20 ac), 346 (85 ac), 724 (15 ac), 846 (12 ac), and Caldwell Units (376 Total Acres) - 401 (109 ac), 422 (65 ac), 428 (98 ac), 804 (104 ac)

1. All dead trees 3” DBH and greater that meet the following criteria and that are 1.5 times the tree height from the road shall be felled:

a. Dead (having no green needles).

b. Designated by COR/GTM by agreed to method.

c. Structurally damaged to the point that failure and/or tree mortality is imminent.

d. A probability of 0.7 (70%) will be used for determining trees for removal within designation by damage class Gold (1 to 39) and Caldwell (1 to 9) salvage units. A probability of 0.7 (70%) will be used for determining trees for removal within designation by damage class in roadside hazard Gold units (304, 333, 346, 724, 846) and Caldwell units (401, 422, 428,804) within 1.5 times tree height from the road edge.

2. All felled trees and downed trees 3.0” DBH and larger and within the treatment area (no more than 1.5 tree length from road edge) shall be skid or yarded to agreed upon landing locations to be piled (except as agreed to leave in place, designated contour felling areas for slope stabilization, and/or other sensitive areas identified during operations). Skidding operations shall adhere to C6.42# of Appendix B. Landing locations shall be on relatively flat ground for safe operations,

3. All contractor felled trees and previously felled/existing downed trees 3.0” DBH and larger shall be treated based on the following:

a. All trees 15.0” DBH and larger shall be piled/decked in whole tree or log form.

b. Sorting and processing of logs is not required unless products are being removed as TSA is being removed under Option Item #3.

c. All trees 3” DBH to 14.9”” DBH and other large woody fuels such as broken tops shall be treated as slash and piled for disposal and/or burning by FS or chipped. Piles may be located throughout the units and/or at landing locations.

d. Unless otherwise agreed, slash piles shall not be closer than 10 feet from the edge of decked merchantable logs or 20 feet from the drip line of any residual green tree. All piles shall be reasonable compact and free of soil, stumps and rocks to facilitate burning and shall be constructed

Page 2 of 2 Big Valley Ranger District

Amendment 002 Attachment B of such size and at such distance from trees so that burning shall not result in unnecessary damage to residual trees. Piles shall be located a distance of at least twice their height in feet from the outer edge of live tree crowns or snags. Piles shall be no less than 15 feet in height and 15 feet in diameter. Material extending three feet or more outside the edge of a pile shall be trimmed. An eight foot fuel break shall be cleared of all but fine material around each pile and an 18 inch wide fire line shall be cleared to mineral soil around the outer ring of the fuel break. Piles will be a target size of 15 feet in height and 15 feet in diameter where practicable and as compact as possible. Smaller piles can be constructed in areas of sparser material instead of scattering material. Small diameter tops shall be mixed with boles for efficient burning. Piles shall be reasonably free of dirt, stumps, and rocks.

e. Directional felling is required to protect forest resources and improvements.

All units shall include:

• cut trees include all dead trees greater than 3 inches DBH.

• Stumps shall be no higher than 12 inches from the ground.

• Do not enter equipment within areas to protect flagged with red and black striped flagging

• Do not damage powerlines, fences, culverts, cattle guards, survey monuments, stream courses or other improvements/sensitive features present within the project area.

• Do not cut any oak, aspen, or mountain mahogany.

• Mechanically cut/pile or remove 3” DBH and greater to be burned by Forest Service or decked/removed from contract area

All dead trees within 1.5 times tree height from the edge of the surface of the road will be cut/piled.

If the trees are cut and piled, all piles shall be compact and constructed to promote complete and efficient combustion. Piles shall be a minimum of 15 feet in height and diameter and constructed to maximize height instead of width. The edge of the piles shall be at least 15' from any leave tree.

"Flag and avoid" Equipment is not allowed to track into sites with red and black striped flagging, however equipment can reach into the site to cut and lift trees out of the site.

Optional Item 2: Cut and Pile Interior Units Gold Units (243 total Acres) - 1 (11 ac), 2 (1 ac), 3 (8 ac), 4 (8 ac), 5 (2 ac), 6 (4 ac), 7 (18 ac), 8 (10 ac), 9 (17 ac), 10 (9 ac), 11 (1 ac), 12 (8 ac), 13 (2 ac), 14 (14 ac), 15 (5 ac), 16(10 ac), 17(1 ac), 18(17 ac), 19 (2 ac), 20(5 ac), 21 (1 ac), 22 (7 ac), 24 (5 ac), 25 (4 ac), 26 (6 ac), 27 (1 ac), 28 (1 ac), 29 (2 ac), 30 (4 ac), 31 (16 ac), 32 (6 ac), 33 (1 ac), 34 (2 ac), 35 (1 ac), 36 (3 ac), 37 (16 ac), 38 (11 ac), 39(3 ac) and Caldwell Units (248 Acres) – 1 (152 ac), 2 (4 ac), 3 (17 ac), 4 (25 ac), 6 (11 ac), 7 (9 ac), 8 (17 ac), 9 (13 ac)

Unit boundaries have been designated with BLUE solid flagging and have been marked with ORANGE paint above and below stump height. Boundary trees are painted with a stump mark, one vertical stripe painted on the boundary tree facing into the treatment unit and a vertical stripe on each side of the same tree showing the direction the harvest unit boundary travels. Wildlife leave trees are marked with orange paint at DBH.

All dead trees shall be cut/piled: