4. Holden IRSC_Appendix_C_Amend003.pdf
PDF 4 MB Posted
- Attached to
- Holden Stewardship IRSC, Kaibab NF, Williams RD, R3 AZ Federal contract opportunity
- Solicitation number
- 12363N22Q4070
- Issued by
- Department of Agriculture Forest Service
About this file
This solicitation is for a stewardship integrated resource service contract (IRSC) to perform fuels management services and timber stand improvement on the Kaibab National Forest in Williams, Arizona. Mandatory and optional service items include cutting, skidding, processing, decking, loading, and hauling approximately 1,365 acres of included timber off forest lands by August 31, 2025. Optional items also consist of slash removal from forest lands and timber stand improvement. A pre-bid site visit will take place on August 17, 2022. The contract will be awarded using best value tradeoff procedures as a firm fixed price commercial services agreement. Contractors must be actively registered in the System for Award Management to be considered for award.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 3
Kaibab National Forest Williams Ranger District
Coconino County, Arizona
Hold
5.4 Road Maintenance Drawings and Specifications
SHEET NO. DESCRIPTION
1 Title Sheet
2 Table of Contents
3 General Notes
4 Road Length Tabulations
5-6 Road Maintenance Summary and Spec List
7 Road Maintenance Appraisal
8-14 Work Tabulations
15-19 Drawing Details and Maps
20-24 Road Maintenance T-Specs
Prepared By: ______________________________________________
Civil Engineer Date
Technical Review By: ______________________________________________
Project Team Leader Date
Project Satisfactory Meets
Management Area Direction: ______________________________________________
District Ranger Date
Reviewed and Approved
For Technical Adequacy: ______________________________________________
Forest Engineer Date
Project Approval for Inclusion In
Program of Work & Funding Availability: ______________________________________________
Forest Supervisor Date
8/2/2022
5.0 TRANSPORTATION FACILITIES
TABLE OF CONTENTS
5.2 Specified Roads
1. Title Sheet 0 Page(s)
2. Schedule of Items 0 Page(s)
3. Specified Roads List 0 Page(s)
4. Construction Drawings 0 Page(s)
5. Forest Service Supplemental Specifications 0 Page(s)
5.4 Road Maintenance
1. Title Sheet 1 Page(s)
2. Table of Contents 1 Page(s)
3. General Notes 1 Page(s)
4. Road Length Tabulations 1 Page(s)
5. Road Maintenance Summary and Spec List 2 Page(s)
6. Road Maintenance Appraisal 1 Page(s)
7. Work Tabulations Page(s)
8. Drawing Details and Vicinity Map 5 Page(s)
9. Road Maintenance T-Specs 5 Page(s)
General Notes:
1. All roads specified for surface blading shall comform to timber sale road maintenance.
2. Purchaser shall maintain all out-sloped drains and lead off ditches per specifications.
3. Berms of materials or other obstructions caused by maintenance operations shall be removed prior to th If, due to weather conditions or equipment breakdowns, berms or obstructions cannot be removed, they shall be signed as a hazard and visibly illuminated at night.
4. Contractor's equipment provided for the performance of the work shall be of the appropriate size, type, and number, and in good working condition, suitable for the work required. Operator's shall be competent and expierenced in the operation of the equipment. Equipment shall have safety signing and appertenances required by OSHA, such as rollover protection (rops), fire suppression devices, lights and slow-moving vehicle signs. The equipment used for blading shall be a diesel, tandem drive motor patrol of at least 150 horsepower. Grading equipment. Equipment must be capable of cutting, crowning, and shaping operations necessary to successfully perform the tasks.
ACRONYMS:
FSR Forest Service Road
MTC maintenance
ML maintenance level
MP mile post
CMP Corrugated Metal Pipe
ROAD LENGTH TABULATION MAINTENANCE
ROAD NO. MAINTENANCE LEVEL TERMINUS TO TERMINUS MILES
124 ML3 MP 1.68 MP 3.17 1.49
15(E) ML2 FSR 124 MP 0.45 0.45
130 ML1 FSR 124 MP 1.88 1.88
9181D ML2 FSR 15 FSR 9181DA 0.66
9183X ML1 FSR 9181D FSR 9183XA 0.45
9183XA ML1 FSR 9183X MP 0.83 0.83
1242C ML2 FSR 124 MP 0.06 0.06
51B ML1 Bearizona Blvd/MP 0.12 MP 0.31 0.19
Total 6.01
Optional Unit Roads
15(W) ML2 MP 1.26 MP 1.65 0.39
124Y ML2 FSR 124 MP 0.27 0.27
Total + Optional 6.67
Road Termini
Miles Road
ML
Applicable Pre-Haul Road Maintenance Specifications Remarks
From To T-803 T-804 T-805 T-806 T-809 T-810 T-811
124 MP 1.68 MP 3.17 1.49 ML3 P
15(E) FSR 124 MP 0.45 0.45 ML2 P
130 FSR 124 MP 1.88 1.88 ML1 P
9181D FSR 15 FSR 9181DA 0.66 ML2 P
9183X FSR 9181D FSR 9183XA 0.45 ML1 P
9183XA FSR 9183X MP 0.83 0.83 ML1 P
1242C FSR 124 MP 0.06 0.06 ML2 P
51B Bearizona Blvd MP 0.31 0.19 ML1 P Remove rock barrier at entrance
15(W) MP 1.26 MP 1.65 0.39 ML2 P Optional Item
124Y FSR 124 MP 0.27 0.27 ML2 P Optional Item
P = Purchaser Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party
Road Termini
Miles Road
ML
Applicable During Haul Road Maintenance Specifications Remarks
From To T-803 T-804 T-805 T-806 T-809 T-810 T-811
124 MP 1.68 MP 3.17 1.49 ML3 P
15(E) FSR 124 MP 0.45 0.45 ML2 P
130 FSR 124 MP 1.88 1.88 ML1
9181D FSR 15 FSR 9181DA 0.66 ML2 P
9183X FSR 9181D FSR 9183XA 0.45 ML1
9183XA FSR 9183X MP 0.83 0.83 ML1
1242C FSR 124 MP 0.06 0.06 ML2 P
51B Bearizona Blvd MP 0.31 0.19 ML1
15(W) MP 1.26 MP 1.65 0.39 ML2 P Optional Item
124Y FSR 124 MP 0.27 0.27 ML2 P Optional Item
P = Purchaser Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party
Page
Road Termini
Miles Road
ML
Applicable Post-Haul Road Maintenance Specifications Remarks
From To T-803 T-804 T-805 T-806 T-809 T-810 T-811
124 MP 1.68 MP 3.17 1.49 ML3 P
15(E) FSR 124 MP 0.45 0.45 ML2 P
130 FSR 124 MP 1.88 1.88 ML1 P Frontage Rd - to stay open
9181D FSR 15 FSR 9181DA 0.66 ML2 P
9183X FSR 9181D FSR 9183XA 0.45 ML1 P
9183XA FSR 9183X MP 0.83 0.83 ML1 P
1242C FSR 124 MP 0.06 0.06 ML2 P
51B Bearizona Blvd MP 0.31 0.19 ML1 P Replace rock barrier at entrance
15(W) MP 1.26 MP 1.65 0.39 ML2 P Optional Item
124Y FSR 124 MP 0.27 0.27 ML2 P Optional Item
P = Purchaser Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party
Road Work Descriptions For
NOTES:
1. In addition to the Specifications noted below, Road Maintenance Specification T-GEN is required for all road work on the Task Order. The T-GEN Specification addresses Equipment Specifications, Noxious Weeds, Traffic Control, and Bridge Maintenance.
2. All road maintenance work shall be done in accordance with attached Best Management Practices for Road Maintenance.
Road # FSR 124 Oper Maint. Level 3
Traveled Way Road Length: 1.49 mi
Mile post Work Description
1.68 Beginning of Project, MP 1.68 on FSR 124/COC-1, Begin T-803
MAINTENANCE BLADING pre, during, and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.
1.74 Maintain existing pullout on the right.
1.97 Protect in plac , insure 1-ft cover.
2.01 Maintain existing junction with FSR 1242C on the right.
2.08 Protect in place insure 1-ft cover.
2.15 -ft cover.
2.16 Maintain existing intersection on the right.
2.23 Maintain existing lead out on the right. Suitable material to be brought back onto the road.
2.35 Maintain existing intersection on the right.
2.47 Maintain existing junction with FSR 15 on the left.
2.71 Maintain existing junction with FSR 124Y on the right.
2.89 Maintain existing lead out on the right. Suitable material to be brought back onto the road.
2.94 Maintain existing intersection on the left.
2.99 Protect in place , insure 1-ft cover.
3.06 Maintain existing junction with FSR 3012 on the right.
3.15 Protect in place , insure 1-ft cover.
3.17 End of Project at MP 3.17 on FSR 124, End T-803 MAINTENANCE BLADING pre, during, and post haul.
Road # FSR 15 (E) Oper Maint. Level 2
Traveled Way 14 Road Length: 0.45 mi
Mile post Work Description 0.00
0.08 0.13 0.23
0.29 0.29
0.32
0.34
0.42 0.42
0.45 0.45
Beginning of Project, MP 2.48 on FSR 124/COC-1, Begin T-803 MAINTENANCE BLADING pre, during, and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.
Protect in place .
Maintain existing intersection on the right.
Maintain existing lead out on the right. Suitable material to be brought back onto the road.
Maintain existing junction with FSR 15B on the left.
Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.
Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.
Maintain existing lead out on the right. Suitable material to be brought back onto the road.
Maintain existing intersection on the right.
Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.
Maintain exisitng junction with FSR 9181D on the right.
End of Project at MP 0.454 on FSR 15, End T-803 MAINTENANCE BLADING pre, during, and post haul.
Road # FSR 130 Oper Maint. Level 1
Traveled Way Road Length: 1.88 mi
Mile post Work Description
0.00 Beginning of Project, MP 0.00 on FSR 124/COC-1, Begin T-803
MAINTENANCE BLADING pre and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.
0.06 Protect in place existing box culvert.
0.48 0.56 0.87 0.94 1.09 1.19 1.29
Protect in place existing CM .
Protect in place existing CMP.
Protect in place existing CMP.
Protect in place existing CMP.
Protect in place existing CMP.
Protect in place existing CMP.
Protect in place existing CMP.
1.35 1.39
1.56 1.88
Protect in place existing CMP.
Maintain existing rolling dip and lead outs. Suitable material to be brought back onto the road.
Protect in place existing Railroad Crossing.
End of Project at MP 1.88 on FSR 130, End T-803 MAINTENANCE BLADING pre and post haul.
Road # FSR 9181D Oper Maint. Level 2
Traveled Way Road Length: 0.66 mi
Mile post Work Description
0.00 Beginning of Project, MP 0.49 on FSR 15, Begin T-803 MAINTENANCE
BLADING pre, during, and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.
0.02 Maintain existing junction with FSR 9183X on the right.
0.13 Maintain existing rolling dip and lead out on the right. Suitable materal to be brought back onto the road.
0.15 Maintain existing rolling dip and lead out on the right. Suitable materal to be brought back onto the road.
0.17 Maintain existing rolling dip and lead out on the right. Suitable materal to be brought back onto the road.
0.28 Maintain lead out on the right. Suitable material to be brought back onto the road..
0.63 Maintain intersection on the left, 9181DA.
0.66 End of Project at MP 0.66 on FSR 9181D, End T-803 MAINTENANCE
BLADING pre, during, and post haul.
Road # FSR 9183X Oper Maint. Level 1
Traveled Way Road Length: 0.45 mi
Mile post Work Description
0.00 Beginning of Project, MP 0.02 on FSR 9181D, Begin T-803 MAINTENANCE
BLADING pre haul and T-811 CLOSING ROADS post haul. Maintain all existing drainage features, including those not listed, and existing road junctions.
Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures
0.45 Maintain existing junction with FSR 9183XA straight ahead.
0.45 End of Project at MP 0.45 on FSR 9183X, End T-803 MAINTENANCE
BLADING pre haul and T-811 CLOSING ROADS post haul.
Road # FSR 9183XA Oper Maint. Level 1
Traveled Way Road Length: 0.83 mi
Mile post Work Description
0.00 Beginning of Project, MP 0.05 on FSR 9181D, Begin T-803 MAINTENANCE
BLADING pre haul and T-811 CLOSING ROADS post haul. Maintain all existing drainage features, including those not listed, and existing road junctions.
Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures
0.33 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.
0.55 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.
0.55 Maintain existing junction with private property on the right.
0.71 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.
0.82 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.
0.83 End of Project at MP 0.84 on FSR 9183XA, End T-803 MAINTENANCE
BLADING pre haul and T-811 CLOSING ROADS post haul.
Road # FSR 1242C Oper Maint. Level 2
Traveled Way Road Length: 0.06 mi
Mile post Work Description 0.00
0.06 0.06
Beginning of Project, MP 2.01 on FSR 124/COC-1, Begin T-803 MAINTENANCE BLADING pre, during, and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.
Protect in place P.
End of Project at MP 0.06 on FSR 1242C, End T-803 MAINTENANCE BLADING pre, during, and post haul.
Road # FSR 51B Oper Maint. Level 1
Traveled Way Road Length: 0.19 mi
Mile post Work Description
0.12 Beginning of Project, MP 0.03 on Bearizona Blvd, Begin T-804 OPENING AND
MAINTAINING ROADS pre haul and T-811 CLOSING ROADS post haul.
Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.
0.31 End of Project at MP 0.31 on FSR 51B, End T-804 OPENING AND MAINTAINING ROADS pre haul and T-811 CLOSING ROADS post haul.
ROAD WORK DESCRIPTION OPTIONAL ITEM
Road # FSR 15 (W) Oper Maint. Level 2
Traveled Way Road Length: 0.39 mi
Mile post Work Description
1.26 Beginning of Project, MP 1.26 on FSR 15, Begin T-803 MAINTENANCE
BLADING pre, during, and post haul. Maintain all existing drainage features and existing road junctions. Protect in place all existing culverts, cattlegaurds, fences or other structures.
1.32 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.
1.39 Maintain existing lead out on the right. Suitable material to be brought back onto the road.
1.49 Maintain existing junction with FSR 9181DA on the right.
1.52 Maintain existing lead out on the right. Suitable material to be brought back onto the road.
1.55 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.
1.58 Maintain existing lead out on the right. Suitable material to be brought back onto the road.
1.60 Maintain existing lead out on the right. Suitable material to be brought back onto the road.
1.61 Maintain existing lead out on the right. Suitable material to be brought back onto the road.
1.63 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.
1.65 Maintain existing lead out on the right. Suitable material to be brought back onto the road.
1.65 End of Project at MP 1.65 on FSR 15, End T-803 MAINTENANCE BLADING pre, during, and post haul.
Road # FSR 124Y Oper Maint. Level 2
Traveled Way Road Length: 0.27 mi
Mile post Work Description 0.00
0.02 0.06
Beginning of Project, MP 2.71 on FSR 124, Begin T-803 MAINTENANCE BLADING pre, during, and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.
Protect in place existing .
Maintain existing lead out on the left. Suitable material to be brough back onto the road.
0.20 Protect in place existing CMP, insure 1-ft of cover.
0.21 Maintain existing junction with FSR 124E on the left.
0.26 Maintain existing rolling dip and lead out on the left. Suitable material to be brought back onto the road.
0.27 End of Project at MP 0.27 on FSR 124Y, End T-803 MAINTENANCE
BLADING pre, during, and post haul.
124Y 15 (W)
Whispering Pines Trl
This product is reproduced from geospatial information prepared by the Kaibab National Forest. Geospatial information and GIS product accuracy may vary. Using GIS products for purposes other than those for which they were created may yield inaccurate or misleading results. Kaibab National Forest reserves the right to correct, update, modify or replace GIS products without notification.
0 0.25 0.5 0.75 10.125 Miles
Date Saved: 8/2/2022 Document Path: T:\FS\NFS\Coconino\Program\7100Engineering\GIS\KaitlynTighe\TS\Holden\Holden Sale Vicinity Map.mxd$
HOLDEN IRSC SALE VICINITY MAP
Williams Ranger District Legend
OptionalUnitRoads
ML3
OtherGovHaulRoutes
ML2
ML1
OPER_MAINT
1 - BASIC CUSTODIAL CARE (CLOSED)
2 - HIGH CLEARANCE VEHICLES
3 - SUITABLE FOR PASSENGER CARS
4 - MODERATE DEGREE OF USER COMFORT
5 - HIGH DEGREE OF USER COMFORT
Mandatory Cut Units
KAIBAB NATIONAL FOREST
SOUTHWEST REGION 3
Ü
WILLIAMS
I-40 WEST
TO ASH FORK
FSR 141 LOOP
TO US-64
US-64
TO VALLE
HISTORIC
ROUTE 66
I-40 EAST
TO FLAGSTAFF
COC-73
TO PERKINSVILLE
WILLIAMS
AIRPORT RD
124Y 15 (W)
Whispering Pines Trl
This product is reproduced from geospatial information prepared by the Kaibab National Forest. Geospatial information and GIS product accuracy may vary. Using GIS products for purposes other than those for which they were created may yield inaccurate or misleading results. Kaibab National Forest reserves the right to correct, update, modify or replace GIS products without notification.
0 0.15 0.3 0.45 0.60.075 Miles
Date Saved: 8/2/2022 Document Path: T:\FS\NFS\Coconino\Program\7100Engineering\GIS\KaitlynTighe\TS\Holden\Holden Sale Map.mxd$
HOLDEN IRSC SALE MAP
Williams Ranger District
KAIBAB NATIONAL FOREST
SOUTHWEST REGION 3
Ü
Legend
OptionalUnitRoads
ML3
ML2
ML1
OtherGovHaulRoutes
OPER_MAINT
1 - BASIC CUSTODIAL CARE (CLOSED)
2 - HIGH CLEARANCE VEHICLES
3 - SUITABLE FOR PASSENGER CARS
4 - MODERATE DEGREE OF USER COMFORT
5 - HIGH DEGREE OF USER COMFORT
Cut_Units
Mandatory Cut Units
Units 4-6
Units 18-25
Units 26-29, 31
Units 97, 100
File details come from the government source that posted it. Updated .