4. Holden IRSC_Appendix_C_Amend003.pdf

PDF 4 MB Posted

Attached to
Holden Stewardship IRSC, Kaibab NF, Williams RD, R3 AZ Federal contract opportunity
Solicitation number
12363N22Q4070
Issued by
Department of Agriculture Forest Service

About this file

This solicitation is for a stewardship integrated resource service contract (IRSC) to perform fuels management services and timber stand improvement on the Kaibab National Forest in Williams, Arizona. Mandatory and optional service items include cutting, skidding, processing, decking, loading, and hauling approximately 1,365 acres of included timber off forest lands by August 31, 2025. Optional items also consist of slash removal from forest lands and timber stand improvement. A pre-bid site visit will take place on August 17, 2022. The contract will be awarded using best value tradeoff procedures as a firm fixed price commercial services agreement. Contractors must be actively registered in the System for Award Management to be considered for award.

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 3

Kaibab National Forest Williams Ranger District

Coconino County, Arizona

Hold

5.4 Road Maintenance Drawings and Specifications

SHEET NO. DESCRIPTION

1 Title Sheet

2 Table of Contents

3 General Notes

4 Road Length Tabulations

5-6 Road Maintenance Summary and Spec List

7 Road Maintenance Appraisal

8-14 Work Tabulations

15-19 Drawing Details and Maps

20-24 Road Maintenance T-Specs

Prepared By: ______________________________________________

Civil Engineer Date

Technical Review By: ______________________________________________

Project Team Leader Date

Project Satisfactory Meets

Management Area Direction: ______________________________________________

District Ranger Date

Reviewed and Approved

For Technical Adequacy: ______________________________________________

Forest Engineer Date

Project Approval for Inclusion In

Program of Work & Funding Availability: ______________________________________________

Forest Supervisor Date

8/2/2022

5.0 TRANSPORTATION FACILITIES

TABLE OF CONTENTS

5.2 Specified Roads

1. Title Sheet 0 Page(s)

2. Schedule of Items 0 Page(s)

3. Specified Roads List 0 Page(s)

4. Construction Drawings 0 Page(s)

5. Forest Service Supplemental Specifications 0 Page(s)

5.4 Road Maintenance

1. Title Sheet 1 Page(s)

2. Table of Contents 1 Page(s)

3. General Notes 1 Page(s)

4. Road Length Tabulations 1 Page(s)

5. Road Maintenance Summary and Spec List 2 Page(s)

6. Road Maintenance Appraisal 1 Page(s)

7. Work Tabulations Page(s)

8. Drawing Details and Vicinity Map 5 Page(s)

9. Road Maintenance T-Specs 5 Page(s)

General Notes:

1. All roads specified for surface blading shall comform to timber sale road maintenance.

2. Purchaser shall maintain all out-sloped drains and lead off ditches per specifications.

3. Berms of materials or other obstructions caused by maintenance operations shall be removed prior to th If, due to weather conditions or equipment breakdowns, berms or obstructions cannot be removed, they shall be signed as a hazard and visibly illuminated at night.

4. Contractor's equipment provided for the performance of the work shall be of the appropriate size, type, and number, and in good working condition, suitable for the work required. Operator's shall be competent and expierenced in the operation of the equipment. Equipment shall have safety signing and appertenances required by OSHA, such as rollover protection (rops), fire suppression devices, lights and slow-moving vehicle signs. The equipment used for blading shall be a diesel, tandem drive motor patrol of at least 150 horsepower. Grading equipment. Equipment must be capable of cutting, crowning, and shaping operations necessary to successfully perform the tasks.

ACRONYMS:

FSR Forest Service Road

MTC maintenance

ML maintenance level

MP mile post

CMP Corrugated Metal Pipe

ROAD LENGTH TABULATION MAINTENANCE

ROAD NO. MAINTENANCE LEVEL TERMINUS TO TERMINUS MILES

124 ML3 MP 1.68 MP 3.17 1.49

15(E) ML2 FSR 124 MP 0.45 0.45

130 ML1 FSR 124 MP 1.88 1.88

9181D ML2 FSR 15 FSR 9181DA 0.66

9183X ML1 FSR 9181D FSR 9183XA 0.45

9183XA ML1 FSR 9183X MP 0.83 0.83

1242C ML2 FSR 124 MP 0.06 0.06

51B ML1 Bearizona Blvd/MP 0.12 MP 0.31 0.19

Total 6.01

Optional Unit Roads

15(W) ML2 MP 1.26 MP 1.65 0.39

124Y ML2 FSR 124 MP 0.27 0.27

Total + Optional 6.67

Road Termini

Miles Road

ML

Applicable Pre-Haul Road Maintenance Specifications Remarks

From To T-803 T-804 T-805 T-806 T-809 T-810 T-811

124 MP 1.68 MP 3.17 1.49 ML3 P

15(E) FSR 124 MP 0.45 0.45 ML2 P

130 FSR 124 MP 1.88 1.88 ML1 P

9181D FSR 15 FSR 9181DA 0.66 ML2 P

9183X FSR 9181D FSR 9183XA 0.45 ML1 P

9183XA FSR 9183X MP 0.83 0.83 ML1 P

1242C FSR 124 MP 0.06 0.06 ML2 P

51B Bearizona Blvd MP 0.31 0.19 ML1 P Remove rock barrier at entrance

15(W) MP 1.26 MP 1.65 0.39 ML2 P Optional Item

124Y FSR 124 MP 0.27 0.27 ML2 P Optional Item

P = Purchaser Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party

Road Termini

Miles Road

ML

Applicable During Haul Road Maintenance Specifications Remarks

From To T-803 T-804 T-805 T-806 T-809 T-810 T-811

124 MP 1.68 MP 3.17 1.49 ML3 P

15(E) FSR 124 MP 0.45 0.45 ML2 P

130 FSR 124 MP 1.88 1.88 ML1

9181D FSR 15 FSR 9181DA 0.66 ML2 P

9183X FSR 9181D FSR 9183XA 0.45 ML1

9183XA FSR 9183X MP 0.83 0.83 ML1

1242C FSR 124 MP 0.06 0.06 ML2 P

51B Bearizona Blvd MP 0.31 0.19 ML1

15(W) MP 1.26 MP 1.65 0.39 ML2 P Optional Item

124Y FSR 124 MP 0.27 0.27 ML2 P Optional Item

P = Purchaser Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party

Page

Road Termini

Miles Road

ML

Applicable Post-Haul Road Maintenance Specifications Remarks

From To T-803 T-804 T-805 T-806 T-809 T-810 T-811

124 MP 1.68 MP 3.17 1.49 ML3 P

15(E) FSR 124 MP 0.45 0.45 ML2 P

130 FSR 124 MP 1.88 1.88 ML1 P Frontage Rd - to stay open

9181D FSR 15 FSR 9181DA 0.66 ML2 P

9183X FSR 9181D FSR 9183XA 0.45 ML1 P

9183XA FSR 9183X MP 0.83 0.83 ML1 P

1242C FSR 124 MP 0.06 0.06 ML2 P

51B Bearizona Blvd MP 0.31 0.19 ML1 P Replace rock barrier at entrance

15(W) MP 1.26 MP 1.65 0.39 ML2 P Optional Item

124Y FSR 124 MP 0.27 0.27 ML2 P Optional Item

P = Purchaser Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party

Road Work Descriptions For

NOTES:

1. In addition to the Specifications noted below, Road Maintenance Specification T-GEN is required for all road work on the Task Order. The T-GEN Specification addresses Equipment Specifications, Noxious Weeds, Traffic Control, and Bridge Maintenance.

2. All road maintenance work shall be done in accordance with attached Best Management Practices for Road Maintenance.

Road # FSR 124 Oper Maint. Level 3

Traveled Way Road Length: 1.49 mi

Mile post Work Description

1.68 Beginning of Project, MP 1.68 on FSR 124/COC-1, Begin T-803

MAINTENANCE BLADING pre, during, and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.

1.74 Maintain existing pullout on the right.

1.97 Protect in plac , insure 1-ft cover.

2.01 Maintain existing junction with FSR 1242C on the right.

2.08 Protect in place insure 1-ft cover.

2.15 -ft cover.

2.16 Maintain existing intersection on the right.

2.23 Maintain existing lead out on the right. Suitable material to be brought back onto the road.

2.35 Maintain existing intersection on the right.

2.47 Maintain existing junction with FSR 15 on the left.

2.71 Maintain existing junction with FSR 124Y on the right.

2.89 Maintain existing lead out on the right. Suitable material to be brought back onto the road.

2.94 Maintain existing intersection on the left.

2.99 Protect in place , insure 1-ft cover.

3.06 Maintain existing junction with FSR 3012 on the right.

3.15 Protect in place , insure 1-ft cover.

3.17 End of Project at MP 3.17 on FSR 124, End T-803 MAINTENANCE BLADING pre, during, and post haul.

Road # FSR 15 (E) Oper Maint. Level 2

Traveled Way 14 Road Length: 0.45 mi

Mile post Work Description 0.00

0.08 0.13 0.23

0.29 0.29

0.32

0.34

0.42 0.42

0.45 0.45

Beginning of Project, MP 2.48 on FSR 124/COC-1, Begin T-803 MAINTENANCE BLADING pre, during, and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.

Protect in place .

Maintain existing intersection on the right.

Maintain existing lead out on the right. Suitable material to be brought back onto the road.

Maintain existing junction with FSR 15B on the left.

Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.

Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.

Maintain existing lead out on the right. Suitable material to be brought back onto the road.

Maintain existing intersection on the right.

Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.

Maintain exisitng junction with FSR 9181D on the right.

End of Project at MP 0.454 on FSR 15, End T-803 MAINTENANCE BLADING pre, during, and post haul.

Road # FSR 130 Oper Maint. Level 1

Traveled Way Road Length: 1.88 mi

Mile post Work Description

0.00 Beginning of Project, MP 0.00 on FSR 124/COC-1, Begin T-803

MAINTENANCE BLADING pre and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.

0.06 Protect in place existing box culvert.

0.48 0.56 0.87 0.94 1.09 1.19 1.29

Protect in place existing CM .

Protect in place existing CMP.

Protect in place existing CMP.

Protect in place existing CMP.

Protect in place existing CMP.

Protect in place existing CMP.

Protect in place existing CMP.

1.35 1.39

1.56 1.88

Protect in place existing CMP.

Maintain existing rolling dip and lead outs. Suitable material to be brought back onto the road.

Protect in place existing Railroad Crossing.

End of Project at MP 1.88 on FSR 130, End T-803 MAINTENANCE BLADING pre and post haul.

Road # FSR 9181D Oper Maint. Level 2

Traveled Way Road Length: 0.66 mi

Mile post Work Description

0.00 Beginning of Project, MP 0.49 on FSR 15, Begin T-803 MAINTENANCE

BLADING pre, during, and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.

0.02 Maintain existing junction with FSR 9183X on the right.

0.13 Maintain existing rolling dip and lead out on the right. Suitable materal to be brought back onto the road.

0.15 Maintain existing rolling dip and lead out on the right. Suitable materal to be brought back onto the road.

0.17 Maintain existing rolling dip and lead out on the right. Suitable materal to be brought back onto the road.

0.28 Maintain lead out on the right. Suitable material to be brought back onto the road..

0.63 Maintain intersection on the left, 9181DA.

0.66 End of Project at MP 0.66 on FSR 9181D, End T-803 MAINTENANCE

BLADING pre, during, and post haul.

Road # FSR 9183X Oper Maint. Level 1

Traveled Way Road Length: 0.45 mi

Mile post Work Description

0.00 Beginning of Project, MP 0.02 on FSR 9181D, Begin T-803 MAINTENANCE

BLADING pre haul and T-811 CLOSING ROADS post haul. Maintain all existing drainage features, including those not listed, and existing road junctions.

Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures

0.45 Maintain existing junction with FSR 9183XA straight ahead.

0.45 End of Project at MP 0.45 on FSR 9183X, End T-803 MAINTENANCE

BLADING pre haul and T-811 CLOSING ROADS post haul.

Road # FSR 9183XA Oper Maint. Level 1

Traveled Way Road Length: 0.83 mi

Mile post Work Description

0.00 Beginning of Project, MP 0.05 on FSR 9181D, Begin T-803 MAINTENANCE

BLADING pre haul and T-811 CLOSING ROADS post haul. Maintain all existing drainage features, including those not listed, and existing road junctions.

Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures

0.33 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.

0.55 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.

0.55 Maintain existing junction with private property on the right.

0.71 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.

0.82 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.

0.83 End of Project at MP 0.84 on FSR 9183XA, End T-803 MAINTENANCE

BLADING pre haul and T-811 CLOSING ROADS post haul.

Road # FSR 1242C Oper Maint. Level 2

Traveled Way Road Length: 0.06 mi

Mile post Work Description 0.00

0.06 0.06

Beginning of Project, MP 2.01 on FSR 124/COC-1, Begin T-803 MAINTENANCE BLADING pre, during, and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.

Protect in place P.

End of Project at MP 0.06 on FSR 1242C, End T-803 MAINTENANCE BLADING pre, during, and post haul.

Road # FSR 51B Oper Maint. Level 1

Traveled Way Road Length: 0.19 mi

Mile post Work Description

0.12 Beginning of Project, MP 0.03 on Bearizona Blvd, Begin T-804 OPENING AND

MAINTAINING ROADS pre haul and T-811 CLOSING ROADS post haul.

Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.

0.31 End of Project at MP 0.31 on FSR 51B, End T-804 OPENING AND MAINTAINING ROADS pre haul and T-811 CLOSING ROADS post haul.

ROAD WORK DESCRIPTION OPTIONAL ITEM

Road # FSR 15 (W) Oper Maint. Level 2

Traveled Way Road Length: 0.39 mi

Mile post Work Description

1.26 Beginning of Project, MP 1.26 on FSR 15, Begin T-803 MAINTENANCE

BLADING pre, during, and post haul. Maintain all existing drainage features and existing road junctions. Protect in place all existing culverts, cattlegaurds, fences or other structures.

1.32 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.

1.39 Maintain existing lead out on the right. Suitable material to be brought back onto the road.

1.49 Maintain existing junction with FSR 9181DA on the right.

1.52 Maintain existing lead out on the right. Suitable material to be brought back onto the road.

1.55 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.

1.58 Maintain existing lead out on the right. Suitable material to be brought back onto the road.

1.60 Maintain existing lead out on the right. Suitable material to be brought back onto the road.

1.61 Maintain existing lead out on the right. Suitable material to be brought back onto the road.

1.63 Maintain existing rolling dip and lead out on the right. Suitable material to be brought back onto the road.

1.65 Maintain existing lead out on the right. Suitable material to be brought back onto the road.

1.65 End of Project at MP 1.65 on FSR 15, End T-803 MAINTENANCE BLADING pre, during, and post haul.

Road # FSR 124Y Oper Maint. Level 2

Traveled Way Road Length: 0.27 mi

Mile post Work Description 0.00

0.02 0.06

Beginning of Project, MP 2.71 on FSR 124, Begin T-803 MAINTENANCE BLADING pre, during, and post haul. Maintain all existing drainage features, including those not listed, and existing road junctions. Protect in place all existing culverts, cattleguards, fences, route markers, signs, or other structures.

Protect in place existing .

Maintain existing lead out on the left. Suitable material to be brough back onto the road.

0.20 Protect in place existing CMP, insure 1-ft of cover.

0.21 Maintain existing junction with FSR 124E on the left.

0.26 Maintain existing rolling dip and lead out on the left. Suitable material to be brought back onto the road.

0.27 End of Project at MP 0.27 on FSR 124Y, End T-803 MAINTENANCE

BLADING pre, during, and post haul.

124Y 15 (W)

Whispering Pines Trl

This product is reproduced from geospatial information prepared by the Kaibab National Forest. Geospatial information and GIS product accuracy may vary. Using GIS products for purposes other than those for which they were created may yield inaccurate or misleading results. Kaibab National Forest reserves the right to correct, update, modify or replace GIS products without notification.

0 0.25 0.5 0.75 10.125 Miles

Date Saved: 8/2/2022 Document Path: T:\FS\NFS\Coconino\Program\7100Engineering\GIS\KaitlynTighe\TS\Holden\Holden Sale Vicinity Map.mxd$

HOLDEN IRSC SALE VICINITY MAP

Williams Ranger District Legend

OptionalUnitRoads

ML3

OtherGovHaulRoutes

ML2

ML1

OPER_MAINT

1 - BASIC CUSTODIAL CARE (CLOSED)

2 - HIGH CLEARANCE VEHICLES

3 - SUITABLE FOR PASSENGER CARS

4 - MODERATE DEGREE OF USER COMFORT

5 - HIGH DEGREE OF USER COMFORT

Mandatory Cut Units

KAIBAB NATIONAL FOREST

SOUTHWEST REGION 3

Ü

WILLIAMS

I-40 WEST

TO ASH FORK

FSR 141 LOOP

TO US-64

US-64

TO VALLE

HISTORIC

ROUTE 66

I-40 EAST

TO FLAGSTAFF

COC-73

TO PERKINSVILLE

WILLIAMS

AIRPORT RD

124Y 15 (W)

Whispering Pines Trl

This product is reproduced from geospatial information prepared by the Kaibab National Forest. Geospatial information and GIS product accuracy may vary. Using GIS products for purposes other than those for which they were created may yield inaccurate or misleading results. Kaibab National Forest reserves the right to correct, update, modify or replace GIS products without notification.

0 0.15 0.3 0.45 0.60.075 Miles

Date Saved: 8/2/2022 Document Path: T:\FS\NFS\Coconino\Program\7100Engineering\GIS\KaitlynTighe\TS\Holden\Holden Sale Map.mxd$

HOLDEN IRSC SALE MAP

Williams Ranger District

KAIBAB NATIONAL FOREST

SOUTHWEST REGION 3

Ü

Legend

OptionalUnitRoads

ML3

ML2

ML1

OtherGovHaulRoutes

OPER_MAINT

1 - BASIC CUSTODIAL CARE (CLOSED)

2 - HIGH CLEARANCE VEHICLES

3 - SUITABLE FOR PASSENGER CARS

4 - MODERATE DEGREE OF USER COMFORT

5 - HIGH DEGREE OF USER COMFORT

Cut_Units

Mandatory Cut Units

Units 4-6

Units 18-25

Units 26-29, 31

Units 97, 100