REVISED Schedule of Items--B
Project: Chatt-Oconee ERFO Reconstruction FSR 32C-MP 0.35
Item No. Item Description Method of Measure
Est Qty
Pay Unit Unit Price Amount
15101 Mobilization L.S.Q. 1 L.S. XXXX $_____________
15713 Soil Erosion & Pollution Control, Type Silt Fence & Sediment Traps
L.S.Q. 1 L.S. XXXX $_____________
20425 Drainage Excavation, Type Rolling Drain Dip & Site Finish Grading
A.Q. 1 Each XXXX $_____________
20426 Drainage Excavation, Type Blind Drain Site Preparation
L.S.Q. 1 L.S. _________ $_____________
20701 Earthwork Geosynthetics, Type Separation Class 1 Woven, Type D
A.Q. 366 S.Y. _________ $_____________
25102 Placed Riprap, Class 4 A.Q. 329 Ton _________ $_____________
30202 4-Inch Minus Aggregate Base, Georgia DOT Gradation #4, Compaction Method 1
A.Q. 165 Ton _________ $_____________
30208 1-Inch Minus Surface Aggregate, Georgia DOT, GAB Gradation, Compaction Method 1
A.Q. 92 Ton _________ $_____________
61805 Keyed-In-Place Precast Concrete Barriers (Jersey Barriers) for Stabilization/Protection of Streambank
A.Q. 8 Each _________ $_____________
Total Base Items: $_____________
Project: Chatt-Oconee ERFO Reconstruction FSR 70-MP 3.30
Item No. Item Description Method of Measure
Est Qty Pay Unit Unit Price Amount
15101 Mobilization L.S.Q. 1 L.S. XXXX $____________
15713 Soil Erosion & Pollution Control, Type Silt Fence & Sediment Traps
L.S.Q. 1 L.S. XXXX $____________
20417 Embankment Construction, Compaction Method C
C.Q. 260 C.Y. _________ $____________
21201 Linear Grading C.Q. 0.14 Mile _________ $____________
25105 Keyed Riprap, GDOT Class 1 A.Q. 1389 Ton _________ $____________
30208 1-Inch Minus Surface Aggregate, Georgia DOT, GAB Gradation, Compaction Method 1
A.Q. 300 Ton _________ $____________
60708 Cleaning Culverts In Place A.Q. 1 Each XXXX $____________
Total Base Items: $_____________
Total Schedule B: $_____________
REVISED Schedule Total
Total of Schedule A: ______________
Total of Schedule B: ______________
Contract Total A + B: ______________
Note: The government intends to award 1 contract for both Schedules. Vendors MUST quote both schedules.