REVISED Schedule of Items--A
Project: Chatt-Oconee ERFO Reconstruction FSR 44-MP 2.49
Item No. Item Description Method of Measure
Est Qty
Pay Unit Unit Price Amount
15101 Mobilization L.S.Q. 1 L.S. XXXX $_____________
15713 Soil Erosion & Pollution Control, Type Silt Fence & Sediment Traps
L.S.Q. 1 L.S. XXXX $_____________
20701 Earthwork Geosynthetics, Type Separation Class 1 Woven, Type D
A.Q. 370 S.Y. _________ $_____________
21201 Linear Grading C.Q. 0.06 Mile _________ $_____________
25102 Placed Riprap, GDOT Class 1 A.Q. 346 Ton _________ $_____________
25105 Keyed Riprap, GDOT Class 1 A.Q. 193 Ton _________ $_____________
30202 4-Inch Minus Aggregate Base, Georgia DOT Gradation #4, Compaction Method 1
A.Q. 346 Ton _________ $_____________
30208 1-Inch Minus Surface Aggregate, Georgia DOT, GAB Gradation, Compaction Method 1
A.Q. 129 Ton _________ $_____________
60201 24" Pipe Culvert, Type Galvanized Steel, 0.064" Thickness, Compaction Method 2
A.Q. 108 L.F. _________ $_____________
Total Base Items: $_____________
Project: Chatt-Oconee ERFO Reconstruction FSR 44-MP 6.80
Item No. Item Description Method of Measure
Est Qty Pay Unit Unit Price Amount
15101 Mobilization L.S.Q. 1 L.S. XXXX $____________
15713 Soil Erosion & Pollution Control, Type Silt Fence & Sediment Traps
L.S.Q. 1 L.S. XXXX $____________
20425 Drainage Excavation, Type Rolling Drain Dip & Site Finish Grading
A.Q. 2 Each _________ $____________
21201 Linear Grading C.Q. 0.08 Mile _________ $____________
30202 4-Inch Minus Aggregate Base, GeorgiaDOT Gradation #4, Compaction Method 1
A.Q. 438 Ton _________ $____________
30208 1-Inch Minus Surface Aggregate, Georgia DOT, GAB Gradation, Compaction Method 1
A.Q. 218 Ton _________ $____________
Total Base Items: $_____________
Total Schedule A: