Questions and Answers.pdf
PDF 156 KB Posted
- Attached to
- Deep Cleaning in Fargo, North Dakota
- Solicitation number
- 1232SA26Q1321
About this file
This document is a Questions and Answers (Q&A) file clarifying requirements for a USDA laboratory cleaning contract. The work involves HEPA vacuuming and decontamination of Buildings 5 and 6 following roof replacement work that dislodged dust and debris into active laboratory spaces.
Key operational clarifications include: contractors must lift sufficient acoustical ceiling tiles in-place to access and vacuum top surfaces, with no requirement to remove all tiles; no lifts or scaffolding are necessary as standard ladders suffice for all heights; USDA personnel will protect and move sensitive laboratory equipment prior to cleaning, though contractors must cover exposed benches and equipment; the performance period is 30 calendar days from Notice to Proceed (the September 20–November 20 date range was an estimate only). Contractors will have unfettered access to facility water, electrical outlets, and on-site waste disposal containers (dumpsters) for project-generated waste. The debris is classified as non-hazardous cellulous material and paint dust (not lead-based), eliminating hazardous waste handling requirements. Contractors will not be liable for damage to ceiling tiles from normal handling or pre-existing wear. Work hours must accommodate both regular business hours (8:00 AM–4:30 PM, Monday–Friday) and after-hours/weekend performance, with contractors expected to bid both scenarios. Security clearance processing has been eliminated due to project timeline constraints; instead, a USDA escort will oversee all on-site activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Site Visit Location.png | PNG image | |
| Sol_1232SA26Q1321.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Does HEPA vacuuming the “top side of ACT” require the contractor to lift/remove and replace individual acoustical ceiling tiles throughout all affected areas?
Not all affected areas have ceiling tiles. For those areas with ceiling tiles, the expectation is that a sufficient number of tiles will be lifted to gain access for vacuuming of top side of tiles. In this scenario, not all tiles are lifted but all tiles will be vacuumed. This accomplishes access but also diminishes debris falling from disturbance.
2. Are there any height/access conditions that require lifts or scaffolding rather than ordinary ladders, particularly for exposed mechanical piping and overhead surfaces?
No heights which should necessitate a lift or scaffolding. A site visit will provide the best answer to this question.
3. Will USDA personnel identify, protect/move, or otherwise prepare sensitive laboratory equipment before cleaning, or should the contractor include all equipment covering/protection materials and labor in the price?
USDA personnel will move/protect or otherwise prepare sensitive equipment prior to scheduled cleaning. It should be expected to cover exposed benches, and equipment.
4. The solicitation shows a performance period of September 20 through November 20, but the SOW says the work must be completed within 30 days after the Notice to Proceed. Can you please clarify how much time the contractor will actually have to complete the work?
Please refer to the “30 days after notice to proceed”. The date span was an estimate for when work was expected to be completed.
1. Access to Utilities and On-Site Waste Disposal (SOW Section 4.0): SOW Section 4.0 states that Government Furnished Property/Equipment is "Not applicable". Could the Government please clarify if the contractor will be granted access to facility water and electrical outlets necessary to operate HEPA-filtered vacuum systems and floor cleaning equipment? Additionally, will the contractor be permitted to utilize on-site USDA waste disposal containers (dumpsters) to dispose of collected ceiling dust, spent HEPA filters, and contaminated cleaning wipes, or must the contractor arrange for off-site hauling and disposal of all project-generated waste?
Yes, there will be unfettered access to outlets, waste bins and dumpsters.
2. Hazardous Material and Debris Classification (SOW Section 2.0): SOW Section 2.0 indicates that roof replacement work dislodged materials and caused dust to fall into active laboratory spaces. Has any environmental testing been performed on this dislodged dust to confirm the absence of hazardous materials (such as asbestos, lead, or silica)?
Please clarify if this debris is classified as hazardous waste, as this directly impacts the required personal protective equipment (PPE), disposal licensing, and the mandatory Service Contract Labor Standards (SCLS) wage classifications.
This is not hazardous waste. It is cellulous material and paint dust (not lead based paint).
3. Acoustic Ceiling Tile (ACT) Handling and Breakage Liability (SOW Section 3.0, Task B): Task B.1 requires HEPA vacuuming the exposed top-side surfaces of ACT.
Because ceiling tiles are inherently fragile and prone to crumbling during handling, please clarify if the contractor is contractually or financially responsible for replacing any tiles that are damaged due to pre-existing wear or normal handling during the lifting and cleaning process. Furthermore, does the Government expect the tiles to be completely extracted from the ceiling grid for vacuuming, or vacuumed in-place by lifting?
No, the contractor will not be liable for replacement of ceiling tiles. Yes, please lift-in-place for vacuuming.
4. Hours of Performance and On-Site Access Constraints (SOW Section 8.0): Since Buildings 5 and 6 house active laboratory spaces with sensitive experiments, please clarify the permitted on-site working hours. Is work expected to be performed during standard business hours (8:00 AM – 4:30 PM, Monday through Friday), or will the cleaning crew be restricted to after-hours, weekends, or federal holidays to minimize operational disruption to scientific staff?
Please provide bids based on “regular business hours” and after-hour weekend.
5. Background Clearance Processing Timeline vs. Period of Performance (SOW Sections 8.0 & 11.0): SOW Section 8.0 requires all personnel to clear USDA security checks, while Section 11.0 mandates a strict 30-calendar-day period of performance from the Notice to Proceed (NTP). Given that federal background screenings can take several weeks to process, will the Government delay issuing the NTP until all on-site subcontractor personnel have successfully cleared security, or will the 30-day performance clock be paused during the security clearance processing period?
The process is too lengthy for this project, so there will be no need for cumbersome security clearance and instead there will be a USDA escort who shall oversee on-site activities
File details come from the government source that posted it. Updated .