This is a Requests for Information (RFI) document for federal solicitation 1232SA26Q1292 regarding the design and construction of a roof system for a container structure.

The Government seeks contractor proposals to design and construct a gable or hip-style roof over an existing container with a surrounding concrete moat. Contractors must provide design, rough drawings, shop drawings, and structural calculations stamped by a Hawaii-licensed engineer. The roof must be constructed using HPM 26-gauge corrugated metal roofing in Pattern 7 with exposed fasteners in Country Red color. Wood framing must be Grade 2 treated lumber, designed per contractor specifications. Roof attachment methods permitted include welding, drilling, and bolting to container corner castings, though fasteners cannot penetrate the inner lab wall. The roof pitch must be 3/12 gable style with water runoff directed away from sidewalks; gutters and downspouts are not allowed. Soffit closure must use 7/16" smart panel with continuous vinyl vent to prevent bird and pest entry. Critical restrictions include prohibition on penetrating the inner container lab roof and no contractor entry into the lab. Available utilities include water, electric, and restrooms. No prior site visit documentation, design drawings, wind speed specifications, or building code guidance were provided by the Government.

View the file

Other files

File Type Posted
Site Visit Sign-In 08242026.pdf PDF
SF30 - Amend 01.pdf PDF
SF-1442.pdf PDF
Statement of Work.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requests for Information Solicitation 1232SA26Q1292

Question 1: Are there any drawings, photographs, measurements, or information from the previous site visits available for the container and surrounding concrete moat?

Answer 1: No

Question 2: Is the contractor expected to design the roof, or will the Government provide construction drawings?

Answer 2: Contractors are expected to design gable and hip style roof, and provide a rough drawing

Question 3: Are contractor-prepared shop drawings or structural calculations required? If so, must they be stamped by a Hawaii-licensed engineer?

Answer 3: Yes

Question 4: What wind speed, wind exposure category, and building code should be used to design the roof and its connections?

Answer 4: N/A

Question 5: What methods are permitted for attaching the roof to the container? Are welding, drilling, bolting, or connections to the container’s corner castings allowed?

Answer 5: Welding, Drilling and bolting are allowed to casting corners. Other fasteners cannot penetrate inner lab wall.

Question 6: Does the Government require a gable roof or single-slope roof? What overhang is required?

Answer 6: Based off of gable roof at a 3/12 pitch, water run off must not hit sidewalk.

Question 7: Are gutters and downspouts required? If so, where should roof runoff be directed?

Answer 7: Gutters and downspouts are NOT ALLOWED.

Question 8: What are the required specifications for the corrugated metal roofing, including material, gauge, coating, profile, fasteners, and color?

Answer 8: HPM 26-gauge, Pattern 7, exposed fasteners, Country Red

Question 9: What are the required specifications for the wood framing, including lumber grade, treatment, member sizes, spacing, and structural connectors?

Answer 9: Grade 2 treated, per design from contractor

Question 10: What type of screen or closure material should be used to prevent birds and pests from entering the roof cavity?

Answer 10: 7/16” smart panel soffit, with continuous vinyl vent.

Question 11: Please identify the utilities available to the contractor and whether there will be a charge for their use.

Answer 11: Water, Electric, Restrooms

Requests for Information Solicitation 1232SA26Q1292

Question 12: Are there any APHIS quarantine, biosecurity, access, or operating restrictions that contractors must include in their pricing and work plan?

Answer 12: Cannot Penetrate inner container lab roof. Entry into the Lab is NOT ALLOWED.