RFIs .pdf
PDF 98 KB Posted
- Attached to
- Quarantine Facility HVAC Replacement Federal contract opportunity
- Solicitation number
- 1232SA26Q1226
About this file
This document is a Questions and Answers (Q&A) file for Solicitation 1232SA26Q1226 related to HVAC unit replacement at a facility.
The project involves replacing an existing ground-mounted Trane HVAC unit (Model# YHC072A3RMA07F10…600, S/N 208100013L) positioned on a 55"x 93" concrete pad. The replacement unit must connect to the existing duct system through modifications and transitions only, with no replacement of the building's existing ductwork required. The existing exhaust fan should remain and be tied into the new unit's return air ductwork if functional, and the existing housekeeping pad should be reused if feasible. The contractor is responsible for removal and disposal of the existing HVAC unit and exhaust fan. Equipment movement will utilize forklift rather than crane or other lifting equipment. No concrete pad alterations or hold-down brackets are needed. Duct cleaning of reused ducts is recommended if possible, with TAB leak testing limited to new ductwork only and confirmation testing required for proper equipment functioning. The new unit will connect to a Micro-Grow greenhouse control system, which is outside the contract scope. Site access requires coordination with the Contracting Officer's Representative (COR) beyond standard government-issued photo ID. Work hours are flexible and can be adjusted to suit contractor needs. No temporary cooling, pre- and post-TAB, fused disconnect replacement, or existing DDC/BMS systems are involved.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 - Amend 01.pdf | ||
| Picture8.png | PNG image | |
| Picture2.png | PNG image | |
| Picture3.png | PNG image | |
| Picture4.png | PNG image | |
| Picture6.png | PNG image | |
| Picture7.png | PNG image | |
| Picture1.png | PNG image | |
| Picture5.png | PNG image | |
| Picture9.png | PNG image | |
| Picture10.png | PNG image | |
| Site Visit Sign-In Sheets.pdf | ||
| Specifications.pdf | ||
| SF-1442.pdf | ||
| Statement of Work.pdf | ||
| Wage Determination.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests for Information Solicitation 1232SA26Q1226
Question 1: Can photographs of the existing rooftop unit and surrounding roof area be provided?
Answer 1: The unit is at ground level ground on a 55”x 93” concrete pad. Photos attached.
Question 2: Please provide existing unit nameplate/model information.
Answer 2: Manf. Trane, Model# YHC072A3RMA07F10…600, S/N 208100013L
Question 3: Please provide existing roof curb dimensions.
Answer 3: N/A
Question 4: Please provide the approximate roof/building height.
Answer 4: N/A
Question 5: Please provide roof access information.
Answer 5: N/A
Question 6: Are any mechanical or roof drawings available?
Answer 6: No.
Question 7: Please provide supply and return duct/plenum dimensions, if available.
Answer 7: Unknown, but included pictures may give some indication.
Question 8: Please provide any known crane access or staging restrictions.
Answer 8: None
Question 9: Is a properly sized curb adapter acceptable for the replacement unit?
Answer 9: May not be needed, see question #1 answer.
Question 10: Please confirm the physical location and elevation of the existing HVAC unit identified as PREC-1, including whether it is roof-mounted, grade-mounted, or otherwise elevated.
Answer 10: Unit will be ground mounted, no elevation.
Question 11: Please also confirm whether crane or other lifting/rigging equipment will be required for removal of the existing unit and placement of the replacement unit.
Answer 11: Units should be able to be moved/positioned using a forklift.
Question 12: Please confirm that the required supply and return plenum work is limited to the modifications/transitions necessary to connect the replacement unit to the existing duct system, rather than replacement of the existing building ductwork.
Answer 12: Confirmed
Question 13: Please advise if there are any specific requirements for site access beyond a government-issued photo ID, such as advance registration, escorts, or PPE requirements.
Answer 13: Please coordinate visit with COR.
Question 14: Please clarify whether the Contractor or WRRC is responsible for the removal and disposal of the existing HVAC unit.
Answer 14: Contractor is responsible for cleanup, including disposal.
Question 15: Is the fused disconnect included in the scope to be replaced?
Answer 15: No
Question 16: Is there an interlock between the exhaust fan and the HVAC unit?
Answer 16: Unknown
Question 17: Is the HVAC unit controlled by local or BMS? If BMS, please provide the manufacturer and version.
Answer 17: HVAC unit will be connected to a Micro-Grow greenhouse control system. This is outside the contract scope.
Question 18: Will temporary cooling be required?
Answer 18: No.
Question 19: Will the unit specified required alteration to the existing concrete pad? If so, will this be included in the scope?
Answer 19: Should not.
Question 20: Will the new unit require hold down bracket to be secured to the concrete pad?
Answer 20: No
Question 21: What are the working hours?
Answer 21: Work hours can be adjusted to suit contractor’s needs.
Question 22: What is the extent of duct cleaning required?
Answer 22: Would be good to have any reused ducts cleaned, if possible.
Question 23: Is there a detail for the flashing that is required for the ductwork?
Answer 23: Unknown. See photos.
Question 24: Is any Pre and post-TAB required?
Answer 24: No, except to the extent required to confirm proper functioning of the new equipment.
Question 25: Please confirm the extent of the TAB leak testing is on the new ductwork only.
Answer 25: Yes.
Question 26: What is to be done with the existing exhaust fan?
Answer 26: Contractor is responsible for disposal of replaced equipment.
Question 27: Is the existing exhaust fan to remain and be tied back into the new unit return air ductwork?
Answer 27: If functional
Question 28: What is the existing control sequence for the exhaust fan and AHU?
Answer 28: Unknown.
Question 29: Is the existing ductwork sizing to remain and tied back into the new RTU?
Answer 29: Yes
Question 30: Please confirm the existing housekeeping pad is to remain and be reused.
Answer 30: If feasible.
Question 31: Is there an existing controls contractor or company? If so, please provide their contact information.
Answer 31: There is no existing controls contractor. HVAC unit will be connected to a stand-alone Micro-Grow greenhouse control system.
Question 32: Is there an existing DDC or BMS system?
Answer 32: No