C04_Attachment 3 - B1 and B80 - Sheet 3 of 17 Revised 7-16-26.docx
DOCX document 219 KB Posted
- Attached to
- Roof Leak Repairs Bldg. 1 and Bldg. 80
- Solicitation number
- 1232SA26Q0884
About this file
This is an attachment to a Request for Quotation (RFQ) that provides scope and work descriptions for roof leak repairs. Solicitation 1232SA26Q0884, issued by the Department of Agriculture Agricultural Research Service, seeks quotations for Roof Leak Repairs at Buildings 1 and 80 located in Stoneville, MS. The acquisition is a Total Small Business Set-Aside with a size standard of $19M under NAICS code 238160 (Roofing Contractors).
Building 1, the subject of this particular attachment, encompasses a footprint of 239 feet by 175 feet including lower levels, with a five-story tower section measuring 239 feet by 55 feet and a smaller penthouse area of approximately 68 feet by 46 feet. The scope of work includes roof leak repairs based on findings from a 2024 Toland-Mizell Investigative Study conducted to identify building envelope leak sources and recommend countermeasures to eliminate water penetration. Specific work includes applying sealant mastic to fourteen roof drains at Building 1, with drain locations illustrated in an accompanying diagram. The full investigative report is available for inspection by interested contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Roof Leak Repairs Page 3 of 177
1. SCOPE AND OBJECTIVES
1.1. DESCRIPTION OF WORK - The following descriptions of work contain excerpts from a 2024 Toland-Mizell Investigative Study that was conducted to identify the sources of building envelope leaks and to suggest countermeasures to eliminate water penetration. The full report is available for inspection.
Building 1
Building 1 covers a footprint that measures overall 239 feet by 175 feet including lower levels. A tower portion is located at the northern extent of the overall footprint that measures 239 feet by 55 feet and is five stories in height, plus a smaller penthouse area that measures approximately 68 feet by 46 feet.
Roof drains are shown below and will require sealant mastic for (14) drains.
Building 1 Roof Drain Locations image1.emf
File details come from the government source that posted it. Updated .