Attachment 7 - Recovery Project - Replace Multi-Zone AHU Supply Ductwork and Controls Drawings Binder.pdf
PDF 55 MB Posted
- Attached to
- Duct Replacement and Cleaning
- Solicitation number
- 1232SA26Q0505
About this file
This is a technical drawings binder attachment for a Recovery Project focused on replacing multi-zone air handling unit (AHU) supply ductwork and associated controls at a federal facility in Kearneysville, West Virginia. The document serves as Attachment 7 to the RFQ and contains the design specifications and construction drawings necessary for bidders to understand the scope of duct replacement and cleaning work required under solicitation number 1232SA26Q0505.
The drawings binder provides the technical basis for the duct replacement project, detailing the multi-zone AHU system configuration, supply ductwork layout, control system modifications, and related mechanical specifications. Contractors responding to this Total Small Business Set-Aside must review these drawings during the mandatory site visit to accurately prepare their quotations. The technical drawings are essential for understanding the complexity and specifications of the HVAC system modifications, which directly impact labor estimates, material requirements, and project timeline assessments for this duct replacement and cleaning acquisition issued by the Department of Agriculture Agricultural Research Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .