Revised Attachment 4 LED Lights.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Replace Fluorescent Lights with LEDs (Brookings, SD) Federal contract opportunity
- Solicitation number
- 1232SA26Q0445
About this file
This is a revised attachment listing LED light replacement requirements for a USDA Agricultural Research Service facility in Brookings, South Dakota. The document provides a detailed inventory of fluorescent lighting fixtures to be replaced with LED equivalents across multiple building wings and rooms, organized by location and light type.
The attachment specifies requirements for 1,936 four-foot T-8 lamps, 14 eight-foot lamps, 142 can/recessed lights, and 7 sconce fixtures, totaling 2,111 light fixtures for replacement. Key specifications include 4-foot LED lamps rated at 14-17 watts with 4,100K color temperature. Site visit updates note that certain existing can lights already contain LEDs and should not be replaced, that 3 fixtures must remain configured as emergency lights, and that 8-foot lamps in the Shop area may be converted to 4-foot equivalents. The inventory covers diverse facility areas including laboratories, greenhouses, rearing chambers, offices, mechanical rooms, and support spaces across wings A, B, C, and D of the building complex.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers_1232SA26Q0445.pdf | ||
| FAR Text_52.225-9_52.225-10_52.222-90.docx | DOCX document | |
| SF30_1232SA26Q0445_0002.pdf | ||
| SF30_1232SA26Q0445_0001.pdf | ||
| Site Visit Sign In Sheet.pdf | ||
| Attachment 4 LED Lights List.xlsx | XLSX spreadsheet | |
| Attachment 1 SF1442 Solicitation Terms and Conditions_1232SA26Q0445.pdf | ||
| Attachment 2 Statement of Work.pdf | ||
| Attachment 3 DOL WD SD20260005_2026_01_16.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| T-8 Lamps; 4' | T-8 Lamps; 8' | Bulbs | Cans | Sconce | Notes | ||||
| Wing | Room | Name | Name | ||||||
| B | 32D | Cage | 23 | ||||||
| B | 32E | Soil Grinding | 10 | ||||||
| B | 32F | Soil Grinding | 2 | ||||||
| B | 32G | Soil Grinding | 2 | ||||||
| B | No # | Soil Grinding | 14 | ||||||
| B | 32C | Pass-through | 4 | ||||||
| B | 32A | Egg Wash | 8 | ||||||
| 32B | Storage | 1 | |||||||
| B | 32 | Head House | 48 | ||||||
| B | 29E | Black Lab | 24 | ||||||
| B | 29D | White Lab | 48 | ||||||
| B | 29C | Storage | 48 | ||||||
| B | 29A | Rest Room | 2 | ||||||
| B | 29 | Growth Chambers (Hallway) | 79 | ||||||
| B | 31 | Greenhouse (Hallway) | 4 | ||||||
| B | 31A | Greenhouse | 1 | ||||||
| B | 31B | Greenhouse | 1 | ||||||
| B | 31C | Greenhouse | 1 | ||||||
| B | 31D | Greenhouse | 1 | ||||||
| B | 30 | Greenhouse Hallway | 3 | ||||||
| 30A-F | Greenhouse Hallway | 1 | |||||||
| 30G | Greenhouse | 1 | |||||||
| 30H | Greenhouse | 1 | |||||||
| 30J | Greenhouse | 1 | |||||||
| B | 27B | Rearing | Receiving | 26 | |||||
| B | 27C | Rearing | Wash room | 8 | |||||
| B | 27G | Rearing | Cooridor | 20 | |||||
| B | 25O | Rearing | Blue Lab | 20 | |||||
| B | 27J | Rearing | Emergence | 4 | |||||
| B | 27I | Rearing | Emergence | 4 | |||||
| B | 27H | Rearing | Emergence | 4 | |||||
| B | 25I | Rearing | 2 | ||||||
| B | 25H | Rearing | 2 | ||||||
| B | 27L | Rearing | Growth Chambers | 28 | |||||
| B | 27A | Rearing | Insect Ball Room | 22 | |||||
| B | 25 | Rearing | Hallway | 10 | |||||
| B | 25D | Rearing | Janitor | 1 | |||||
| B | 25C | Rearing | Rest Room | 1 | |||||
| B | 25B | Rearing | Shower | 1 | |||||
| B | 25A | Rearing | Lockers | 2 | Revised | ||||
| B | 25E | Rearing | Orange Lab | 34 | Revised | ||||
| B | 25G | Rearing | Storage | 4 | Revised | ||||
| B | 25F | Rearing | Storage (Diet Prep) | 12 | Revised | ||||
| B | 28 | Rearing | Mech Room | 12 | Revised | ||||
| B | 27 | Rearing | Hallway | 2 | Revised | ||||
| B | 26 | Rearing | Office | 4 | Revised | ||||
| B | 3 | Rearing | Comm Room 3 | 2 | Revised | ||||
| B | 24 | Rearing | Office | 10 | Revised | ||||
| B | 22 | Mech Room | 12 | Revised | |||||
| B | 21 | Hallway | 21 | Revised | |||||
| B | 20 | Old Generator | 8 | Revised | |||||
| A | 18 | Cold Room | 4 | ||||||
| A | 17 | Storage | 4 | ||||||
| A | 16 | Pekarcik | 6 | ||||||
| A | 15 | Nielson | 6 | ||||||
| A | 14 | Safety | 6 | ||||||
| A | 9 | Comm Room II | 4 | ||||||
| A | 19 | Insect Holding Lab | 36 | ||||||
| A | 19A | Insect Holding Lab | 4 | ||||||
| A | 13A | Storage | 2 | ||||||
| A | 13 | Pekarcik Lab | 42 | ||||||
| A | 11 | Lab | 42 | ||||||
| A | 10 | Break Room | 21 | ||||||
| A | 10A | Break Room | 2 | ||||||
| A | No # | RO Down (Below Brk Rm) | 14 | ||||||
| A | 38C | Safe | 6 | ||||||
| A | 38D | Storage | 6 | ||||||
| A | 38A | Admin Area | 48 | ||||||
| A | 38E | Schneider | 15 | ||||||
| A | 38F | Coomes | 12 | ||||||
| A | 36 | Mail Room | 18 | 16 | |||||
| A | 38G | McCuin | 12 | ||||||
| A | 37 | Hallway | 24 | ||||||
| A | 39 | Entry Way (East) | 4 | ||||||
| D | 1 | North Entry | 0 | 4 | Removed 4 Cans - these are LED | ||||
| D | Men's Rest Room | 6 | 14 | ||||||
| D | Women's Room | 6 | 14 | ||||||
| D | 4 | Hallway | 0 | 8 | Removed 15 Cans - these are LED | ||||
| D | 6 | Custodian | 2 | ||||||
| A | 33 | Custodian | 2 | ||||||
| A | 34 | Rest Room | 2 | 6 | |||||
| A | 35 | Rest Room | 2 | 6 | |||||
| A | 40 | Roeder Lab | 42 | ||||||
| A | 40A | Storage | 4 | ||||||
| A | 41A | Storage | 6 | ||||||
| A | 41 | Roeder Lab | 36 | ||||||
| A | 41A | Office | 6 | ||||||
| A | 42 | Common Equip Room | 12 | ||||||
| A | 43 | IT | 6 | ||||||
| A | 44 | Schneider Lab | 42 | ||||||
| A | 44A | Storage | 4 | ||||||
| A | 44B | Sutradhar Office | 6 | ||||||
| A | 45 | Student Office | 6 | ||||||
| A | 47 | Daniels Office | 6 | ||||||
| A | 49 | Roeder Office | 6 | ||||||
| A | 48 | lab | 42 | ||||||
| A | 48A | Storage | 4 | ||||||
| A | 50 | Hessler Lab | 42 | ||||||
| A | 50A | Storage | 4 | ||||||
| A | 51 | Beckendorf Office | 6 | ||||||
| A | 52 | Hessler Office | 6 | ||||||
| A | 53 | Office | 6 | ||||||
| A | 54 | Lab | 42 | ||||||
| A | 54A | Storage | 2 | ||||||
| A | 54B | Storage | 2 | ||||||
| A | 55 | Maint Mech Office | 6 | ||||||
| A | 56 | Comm Room 1 | 4 | ||||||
| A | 57 | Mechanical | 12 | ||||||
| A | 58 | Electrical | 6 | ||||||
| A | 59 | Hallway | 2 | 2 | |||||
| C | 59, 60, 71 | Hallway | 0 | Removed 15 cans, these are LED | |||||
| C | 61 | Neupane Office | 9 | ||||||
| C | 62 | Yin Office | 9 | ||||||
| C | 63 | Vacant | 9 | ||||||
| C | 64 | Custodian | 2 | ||||||
| C | 65 | Lehman Office | 9 | ||||||
| C | 66 | Osborne Office | 9 | ||||||
| C | 67 | Vacant Office | 9 | ||||||
| C | 68 | Men's Room | 8 | 6 | |||||
| C | 69 | Women's Room | 8 | 6 | |||||
| C | 70 | Growth Chambers | 6 | ||||||
| C | 72 | Lab | 52 | ||||||
| C | 73 | Vacant Office | 12 | ||||||
| C | 74 | Plant Phys Lab | 68 | ||||||
| C | 75 | Lahr Office | 12 | ||||||
| C | 76 | Gibson Office | 12 | ||||||
| C | 77 | Yin Lab | 52 | ||||||
| C | 78 | Hallway | 12 | 7 | Updated to 7 Cans | ||||
| C | 82A | Agro Lab | 28 | ||||||
| C | 80 | Wagner Office | 12 | ||||||
| C | 82 | Common Soils Lab | 48 | ||||||
| C | 81F | Storage | 2 | ||||||
| C | 81E | Storage | 2 | ||||||
| C | 81D | Storage | 2 | ||||||
| C | 81C | Storage | 2 | ||||||
| C | 81B | Storage | 2 | ||||||
| C | 81A | Storage | 2 | ||||||
| C | No # | Roof Access | 14 | ||||||
| C | 89 | Common Equip Room | 12 | ||||||
| C | 88 | Cold Room | 4 | ||||||
| C | 90 | Hallway | 12 | ||||||
| C | 83 | Student Office | 12 | ||||||
| C | 82B | Soil Science Lab | 32 | ||||||
| C | 84 | Soil Prep | 24 | ||||||
| C | 86 | Soil Micro Lab | 64 | ||||||
| C | 87 | Nichols Office | 12 | ||||||
| C | Foyer | 6 | |||||||
| Chem Storage | 5 | ||||||||
| Shop | Gator spot | 20 | |||||||
| Shop | Main | 6 | 14 | ||||||
| Shop | Rest Room | 2 | |||||||
| Shop | Breezeway to Car Stalls | 4 | |||||||
| Seed Storage | Main | 16 | |||||||
| Seed Storage | Cooler | 12 | |||||||
| Seed Storage | Seed house lab | 12 | |||||||
| Seed Drying | Boiler Room | 2 | 1 | Updated # of 4 foot lamps | |||||
| Seed Drying | Drying Rooms | 8 |
Totals 1936 14 142 7 12
| Total | 2111 | ||
| 4/17/2026 Site Visit Updates | |||
| 1. Updated Can lights on the list that are already LED | |||
| 2. Updated B25A to B20, those lamps are 4 foot, not 8 foot | |||
| 3. In the Shop, may convert the 8 foot lamps to 4 foot lamps | |||
| 4. There are 3 lights that are considered emergency lights. Those need to continue to be configured as emergency lights | |||
| 5. Watts: 4 foot lamps can be 14 to 17 watts | |||
| 6. Light color: 4,100 K |