Questions and Answers for 1232SA26Q0238.docx

DOCX document 21 KB Posted

Attached to
Security Camera System- Fayetteville, AR
Solicitation number
1232SA26Q0238
Issued by

About this file

This is a Questions and Answers document for RFQ 1232SA26Q0238, a security camera system acquisition for the USDA-ARS facility in Fayetteville, Arkansas. The facility encompasses 100,039 square feet and requires installation of 19 new 2MP dome cameras (16 standard domes and 1 mini dome) integrated with the existing Avigilon Version 8 system already onsite. The mini dome camera will be installed in a location where camera size is a concern, while specific mounting types (pendant versus wall mounts) will be determined by vendors in their quotes. Avigilon Smart Licenses for Version 8 are required for each new camera. The existing infrastructure, including POE network ports and server capacity, will be utilized for the new cameras, with specific camera locations and floor plans to be provided after contract award. The third floor does not require new cameras.

The Q&A document clarifies that this is a new requirement with no incumbent contractor, and that video analytics are not needed as analytics functionality can be provided through servers rather than cameras. No budget has been established for this acquisition, and there is no specified data retention requirement. This is a Total Small Business Set-Aside under the Department of Agriculture Agricultural Research Service, classified under NAICS code 334512 with a small business size standard of 650 employees. All responsible sources may submit quotations, with evaluation criteria and solicitation terms detailed in the referenced attachment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for 1232SA26Q0238

1. Do you know the square footage of the building? 100,039 sq ft

2. Is there a budget you already have in mind for this? That information is not available.

3. Is there an incumbent? This is a new requirement.

This is a new requirement. Cameras will need to be integrated with existing system.

4. Confirm you need video analytics. We represent ISS and they can do anything that is needed. The analytics are on servers not on cameras so we can present any camera available on the market. We’d probably propose Axis cameras for this solution.

We do not need analytics.

5. Current version of Avigilon software (ACC7 or Unity 8)?

Aviligon Version 8, already onsite

6. Do you need licenses and smart plans for each of the new cameras?

Yes, Avigilon Smart Licenses for Version 8

7. Is there a drawing that can be provided that shows camera locations?

These will be provided upon award of the contract.

8. Is the entire area drop tile ceiling?

Raceway and drop ceilings

9. Is there sufficient POE network ports on the current system to accommodate the new cameras?

Yes

10. Can we get a floor plan of the facility with existing equipment (including headend) and the new camera locations marked?

Specific locations will be determined after awarding the contract

11. Can you provide a list of the existing equipment? Avigilon Version 8 is currently onsite

12. Floor Plan I was given shows 17 cameras, but the SOW shows 19. Can we get an updated floor plan? Specific locations for the other cameras will be determined after the contract is finalized

13. Need verification that the 3rd floor does not need new cameras? 3rd floor does not need cameras

14. The SOW states the need for one 2MP Mini Dome camera. Where is this camera being installed? SOW has 16 other 2MP regular domes, so I'm trying to understand the need for this one. Mini-dome is needed is location where size of camera is a concern.

15. What Cameras are being mounted on the Pendants, and what cameras are getting the Wall Mounts? Please provide the appropriate mount for the camera quoted.

16. Does the USDA/UArk have a server big enough to connect 19 new cameras, or do we need to quote a new one? Current infrastructure will be utilized.

17. How many days of retention do they need? N/A

File details come from the government source that posted it. Updated .