Attachment 2 REV 1 Statement of Work.pdf

PDF 2 MB Posted

Attached to
Parking Lot Repair/Sealcoat in Marshfield, WI
Solicitation number
1232SA26Q0205
Issued by

About this file

This is a Statement of Work (SOW) for the Marshfield Parking Lot Repair and Sealcoat project at the USDA-ARS EIDMRU Lab in Marshfield, Wisconsin. The contractor must complete three primary work packages: (1) replacement of 825 square yards of deteriorated asphalt including saw cutting, removal and disposal of existing asphalt and 18 inches of subgrade material, installation of 10 inches of breaker run and 8 inches of compacted base course, and paving with WisDOT spec type MT58-28S asphalt mix compacted to 3.5 inches in two lifts with a tack coat; (2) crack filling and sealcoating of the remaining parking lot in good condition, including routing and filling asphalt cracks and seams between concrete and asphalt, followed by application of two coats of bio-based sealcoat product (such as BioSealcoat by Aexcel Corp.); and (3) paint striping of parking areas to match pre-existing configuration, including two handicapped spaces in the front lot, using bio-based striping paint (such as BioStripe by Aexcel Corp.).

The contractor must provide a comprehensive quote including all materials, labor, travel, deliveries, and bid bonding. Work must be conducted during normal business hours (7 a.m. to 5 p.m., Monday through Friday) unless otherwise scheduled in advance with facility staff. The contractor is required to notify USDA technical points of contact Matt Akins (715-391-3246) and Joe Hattamer at least one week before the anticipated start date to coordinate schedules. The work site is located at 2615 Yellowstone Drive, Marshfield, Wisconsin 54449. No government property or equipment will be furnished, and no special security requirements apply since all work is conducted outside the building. Key contractor personnel must include a technical representative to determine correct materials and staff responsible for implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Project: Marshfield Parking Lot Repair and Sealcoat

GENERAL INFORMATION

1.0 Scope of Work:

Replacement of 825 square yards of asphalt parking lot, and crack filling and sealcoating of remaining parking lot which in good condition, and parking space striping of entire parking lot at the USDA-ARS EIDMRU Lab in Marshfield, WI.

2.0 Background:

The EIDMRU Lab building parking lot is in need of crackfilling and sealcoating for the majority of the parking lot with replacement of some areas (825 square yards total) due to sinking and cracking.

The areas needing replacement will require excavation of those areas to remove and dispose of the existing asphalt and 18 inches of subgrade material prior to installation of 10 inches of new subgrade breaker run and 8 inches of compacted base course. The lot will be paved with WisDOT spec type MT58-28S asphalt mix compacted to 3.5 inches in two lifts. A tack coat will be used prior to the surface course.

The areas in good condition to be seal-coated will have all cracks routed and filled, and seams between concrete and asphalt routed and filled.

After the asphalt replacement and sealcoating is completed, the parking areas will be paint striped to match the pre-existing parking area strips.

CONTRACTOR REQUIREMENTS

3.0 Technical Requirements/Tasks:

Asphalt lot replacement area = 825 square yards Replacement incudes:

-Saw cutting of asphalt replacement area -Removal and disposal of removed asphalt -Removal and disposal of 18 inches subgrade material -Furnish and install 10 inches breaker run and 8 inches base course -Fine grading, watering, and compaction of base course material -Pave with WisDOT spec type MT58-28S asphalt mix compacted to 3.5 inches in two lifts. A tack coat must be used prior to installation of surface course.

Parking lot crackfilling and sealcoating -Route and fill asphalt cracks -Clean out and fill seams between asphalt and concrete -Apply 2 coats of sealcoat to entire area except replacement area -Sealcoat shall be a bio-based product such as BioSealcoat (Aexcel Corp.)

Parking lot paint striping -After replacement and sealcoating is complete, paint stripe parking areas similar to pre-existing parking lots including 2 handicapped areas in front lot -Striping paint shall be a bio-based product such at BioStripe (Aexcel Corp.)

-Quote must include a description of all materials and services to be provided as part of the package, including materials, labor, travel/deliveries, and bid bonding. If items deemed necessary in the above technical specifications are not included in the quote, the quote may not be reviewed.

4.0 Government Furnished:

No government property or equipment will be provided

5.0 Deliverables / Schedule:

The site of this work is at the USDA-ARS EIDMRU lab and office located at 2615

Yellowstone Drive, Marshfield, WI 54449.

All work at the site must be conducted during normal business hours of 7am and

5pm Monday through Friday unless scheduled in advance with facility staff.

Contractors must notify the USDA technical POCs (Matt Akins-715-391-3246) and

Joe Hattamer at least 1 week before anticipated start of the package implementation to ensure the plans work with the staff’s schedule, and coordinate work schedules around other building projects.

6.0 Travel:

Worksite location is the USDA-ARS EIDMRU lab and office located at 2615

Yellowstone Drive, Marshfield, WI 54449. All travel and delivery of materials to the site must be included in the quote.

7.0 Contractor’s Key Personnel:

Key personnel for the contractor include the technical representative to determine the correct materials, and the staff in charge of implementation.

8.0 Security Requirements:

No special security requirements will be needed for vendors working on the project at this location since all work will be completed outside the building.

Overhead pictures of work areas:

Crack filling and seal coating area

Asphalt repair area, approximate (yellow areas)

Asphalt replacement areas

Pictures of existing parking lot:

Attachment 2 Statement of Work
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
6.0 Travel:

USDA Marshfield asphalt repair sealcoat - SOW