Attach 3 Submittal Log Install Pole Barn for LTAR 17Jun24.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- 12305B24R0042
About this file
This document is a Submittal Log related to a federal contract opportunity for the design and construction of a 40'W x 80'L x 14'H pole barn for Long-Term Agricultural Research (LTAR) in Beltsville, MD.
The key details include: the project name, award date of June 17, 2024, and contract number. The submittal log lists various required submittals such as the stamped/sealed pole barn design, concrete, insulation, roll-up doors, entry door, sidelights, as-builts, and roof/wall panels. The status of each submittal is indicated as pending. The related federal contract opportunity is Solicitation Number 12305B24R0042 issued by the USDA Agricultural Research Service for the Pole Barn Construction for LTAR project. The contract has a base bid for the design and construction, plus an optional CLIN for electrical items. The project is a Total Small Business Set-Aside with a performance period of 180 days after the Notice to Proceed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SUBMITTAL LOG | Status |
| Pending |
| Project Name | Pole Barn for LTAR | Award Date | 17-Jun-24 | |||||
| Address | 10300 Baltimore Avenue | Project Number | ||||||
| City | Beltsville | State | MD | Zip | 20705 | Contract Number |
| Line Item Number | Submittal Number | Submittal Date | Specification Number Dwg Number | Specification Name | Item Description | Type Of Submittal | Status | Date Approved/Rejected | Resubmittal Due Date | Remarks | |||||||||||
| P | I | C | |||||||||||||||||||
| R | N | E | O | I | |||||||||||||||||
| O | S | S | R | & | N | ||||||||||||||||
| D | T | S | T | T | M | F | |||||||||||||||
| U | D | R | C | A | I | O | |||||||||||||||
| C | R | U | H | T | R | F | S | R | M | R | |||||||||||
| T | A | C | E | E | E | I | A | E | A | M | |||||||||||
| W | T | D | M | P | C | M | C | N | A | ||||||||||||
| D | I | I | U | E | O | A | P | O | U | T | |||||||||||
| A | N | O | L | N | R | T | L | R | A | I | |||||||||||
| T | G | N | E | T | T | E | E | D | L | O | |||||||||||
| A | S | S | S | S | S | S | S | S | S | N | |||||||||||
| 1 | Division 1 | GENERAL REQUIREMENTS | |||||||||||||||||||
| 1 | 1.1 GENERAL INTENTION | D. Training Records of 10-hour OSHA courses for all project employees; 30-hour OSHA Training for supervisors. | X | ||||||||||||||||||
| 2 | 1.2 PROJECT COORDINATION | A. Construction Project Schedule | X | ||||||||||||||||||
| 3 | 1.2 PROJECT COORDINATION | B. Contract Inspector's Daily Report | X | ||||||||||||||||||
| 4 | 1.4 SAFETY SUBMITTALS | A. | "Site Specific" Safety Plan | X | |||||||||||||||||
| 6 | 1.4 SAFETY SUBMITTALS | C. DAILY INSPECTION FORM | X | ||||||||||||||||||
| 12 | 1.5 CONSTRUCTION SECURITY REQUIREMENTS | A. Security Plan (May be incorporated into Safety Plan) | X | ||||||||||||||||||
| 13 | 1.6 FIRE SAFETY | B. Fire Safety Plan (May be incorporated into Safety Plan) | X | ||||||||||||||||||
| 13 | SOW | MATERIAL SUBMITTALS | |||||||||||||||||||
| 14 | SOW, paragraph 1.1.1 | STAMPED/SEALED POLE BARN DESIGN | X | ||||||||||||||||||
| 15 | SOW, paragraph 1.1.1.5 | CONCRETE | X | ||||||||||||||||||
| 16 | SOW, paragraph 1.1.1.4 | INSULATION | X | ||||||||||||||||||
| 17 | SOW, paragraph 1.1.1.6 | ROLLUP DOORS | X | ||||||||||||||||||
| 18 | SOW, paragraph 1.1.1.6 | ENTRY DOOR | X | ||||||||||||||||||
| 19 | SOW, paragraph 1.1.1.7 | SIDELIGHTS | X | ||||||||||||||||||
| 20 | SOW, paragraph 1.1.3 | AS-BUILTS | X | ||||||||||||||||||
| 22 | SOW, paragraph 1.1.3 | ROOF AND WALL PANELS | X | X | |||||||||||||||||
| 23 | |||||||||||||||||||||
| 24 | |||||||||||||||||||||
| 25 | |||||||||||||||||||||
| 26 | |||||||||||||||||||||
| 27 | |||||||||||||||||||||
| 28 | |||||||||||||||||||||
| 29 | |||||||||||||||||||||
| 30 | |||||||||||||||||||||
| 31 | |||||||||||||||||||||
| 32 | |||||||||||||||||||||
| 33 | |||||||||||||||||||||
| 34 | |||||||||||||||||||||
| 35 | |||||||||||||||||||||
| 36 | |||||||||||||||||||||
| 37 | |||||||||||||||||||||
| 38 | |||||||||||||||||||||
| 39 | |||||||||||||||||||||
| 40 | |||||||||||||||||||||
| 41 | |||||||||||||||||||||
| 42 | |||||||||||||||||||||
| 43 | |||||||||||||||||||||
| 44 | |||||||||||||||||||||
| 45 | |||||||||||||||||||||
| 46 | |||||||||||||||||||||
| 47 | |||||||||||||||||||||
| 48 | |||||||||||||||||||||
| 49 | |||||||||||||||||||||
| 50 | |||||||||||||||||||||
| 51 | |||||||||||||||||||||
| 52 | |||||||||||||||||||||
| 53 | |||||||||||||||||||||
| 54 | |||||||||||||||||||||
| 55 |
File details come from the government source that posted it. Updated .