Attach 3 Submittal Log Install Pole Barn for LTAR 17Jun24.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Pole Barn Construction for Long-Term Agricultural Research in Beltsville, MD
Solicitation number
12305B24R0042
Issued by

About this file

This document is a Submittal Log related to a federal contract opportunity for the design and construction of a 40'W x 80'L x 14'H pole barn for Long-Term Agricultural Research (LTAR) in Beltsville, MD.

The key details include: the project name, award date of June 17, 2024, and contract number. The submittal log lists various required submittals such as the stamped/sealed pole barn design, concrete, insulation, roll-up doors, entry door, sidelights, as-builts, and roof/wall panels. The status of each submittal is indicated as pending. The related federal contract opportunity is Solicitation Number 12305B24R0042 issued by the USDA Agricultural Research Service for the Pole Barn Construction for LTAR project. The contract has a base bid for the design and construction, plus an optional CLIN for electrical items. The project is a Total Small Business Set-Aside with a performance period of 180 days after the Notice to Proceed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SUBMITTAL LOGStatus
Pending
Project NamePole Barn for LTARAward Date17-Jun-24
Address10300 Baltimore AvenueProject Number
CityBeltsvilleStateMDZip20705Contract Number
Line Item NumberSubmittal NumberSubmittal DateSpecification Number Dwg NumberSpecification NameItem DescriptionType Of SubmittalStatusDate Approved/RejectedResubmittal Due DateRemarks
PIC
RNEOI
OSSR&N
DTSTTMF
UDRCAIO
CRUHTRFSRMR
TACEEEIAEAM
WTDMPCMCNA
DIIUEOAPOUT
ANOLNRTLRAI
TGNETTEEDLO
ASSSSSSSSSN
1Division 1GENERAL REQUIREMENTS
11.1 GENERAL INTENTIOND. Training Records of 10-hour OSHA courses for all project employees; 30-hour OSHA Training for supervisors.X
21.2 PROJECT COORDINATIONA. Construction Project ScheduleX
31.2 PROJECT COORDINATIONB. Contract Inspector's Daily ReportX
41.4 SAFETY SUBMITTALSA."Site Specific" Safety PlanX
61.4 SAFETY SUBMITTALSC. DAILY INSPECTION FORMX
121.5 CONSTRUCTION SECURITY REQUIREMENTSA. Security Plan (May be incorporated into Safety Plan)X
131.6 FIRE SAFETYB. Fire Safety Plan (May be incorporated into Safety Plan)X
13SOWMATERIAL SUBMITTALS
14SOW, paragraph 1.1.1STAMPED/SEALED POLE BARN DESIGNX
15SOW, paragraph 1.1.1.5CONCRETEX
16SOW, paragraph 1.1.1.4INSULATIONX
17SOW, paragraph 1.1.1.6ROLLUP DOORSX
18SOW, paragraph 1.1.1.6ENTRY DOORX
19SOW, paragraph 1.1.1.7SIDELIGHTSX
20SOW, paragraph 1.1.3AS-BUILTSX
22SOW, paragraph 1.1.3ROOF AND WALL PANELSXX
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55

File details come from the government source that posted it. Updated .