Questions and Answers for SAM- 2.docx

DOCX document 26 KB Posted

Attached to
Concrete Slabs Federal contract opportunity
Solicitation number
12305B24Q0003
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Northeast Area

About this file

This document contains questions and answers regarding Solicitation Number 12305B24Q0003 for Concrete Slabs from the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Northeast Area. The solicitation requires the installation of 4-inch steel bollards set in concrete footers, as well as 6-inch concrete pads with turndowns around the perimeter ranging from 8 to 12 inches wide and 1.5 to 2.5 feet down. Compressive strength testing of the concrete will be required to be conducted by an approved independent testing company. Payment and performance bonds may be necessary depending on the value of the proposal.

View the file

Other files for this federal contract opportunity

Other files attached to Concrete Slabs, newest first.
File Type Posted
Amendment to RFQ Posted to SAM 12305B24Q0003 P0001.pdf PDF
Questions and Answers for SAM- 1.docx DOCX document
Wage Determination.pdf PDF
SF 1442 12305B24Q0003.pdf PDF
Statement of Work.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

November 17, 2023

Questions and Answers #2

1. What is the diameter size of the steel bollards?

ANSWER: 4”

1. Are we to provide compressive strength testing using an approved independent testing company?

ANSWER: Compressive strength testing is required.

1. Can you provide the wage scale with work classifications to be used on this project?

ANSWER: This is one of the attachments in the solicitation on SAM.gov.

1. Can you provide a list of attendees of the site meeting.

ANSWER: A list of attendees is not going to be shared.

1. What height is required for the new pads from existing grade?

ANSWER: 6 inches

1. What is the rise of new 3’ steps for each pad?

ANSWER: 6” ramp

1. What is the required size and attachment method for bollards?

ANSWER: 4” in concrete footing.

1. Any third party break testing required?

ANSWER: Break testing will be required.

1. Will the project require bonding?

ANSWER: If your proposal amount is above $35,000, but less than $150,000 the project will required alternate payment protections, which could include payment bond, An irrevocable letter of credit (ILC), or a tripartite escrow agreement. If your project is above $150,000 then payment and performance bonds will be required. FAR 28.102

1. Will the 6” pads have turndowns around the perimeter? Usually about 8” to 12” wide, and 1.5’ to 2.5’ foot down.

ANSWER: Turndown is required.

1. Are these steel bollards or surface mounted bollards? If steel bollards, would they want a concrete footer with it as well (always the case for steel bollards)?

ANSWER: Steel bollards in concrete footers.