AMEND 01_06032020.pdf
PDF 264 KB Posted
- Solicitation number
- 12168120B0001
About this file
This document is an amendment to a solicitation for construction services for the Green Mountain and Finger Lakes National Forests Supervisor's Office site. The amendment provides responses to vendor questions, extends the response due date to July 17, 2020 at 4:30 PM EST, and clarifies project scope details. The construction project involves site work including grading, utilities installation, and finish work around existing buildings, but does not include building construction. The Forest Service is the contracting agency. This is a total small business set-aside with a NAICS code of 238910 and size standard of $16.5 million. Vendors must have an active SAM registration to be eligible to respond.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 3_07282020.pdf | ||
| AMEND 2_07142020.pdf | ||
| 12168120B0001_05072020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
AMENDMENT 01: Questions and Answers and Extension for receipt of bids.
North East Acquisition Team 4 Farm Colony Drive Warren PA 16365
See block 6.
12168120B0001
06/03/2020
05/07/2020
Solicitation: 12168120B0001
Date: 3 June 2020
AMENDMENT 1:
QUESTIONS AND ANSWERS:
1. QUESTION: I was wondering if this project was going to require third party construction materials testing and which party would be responsible for it if needed.
RESPONSE: See Section 01 4000 Quality Assurance & Control Requirements of the Specifications, paragraph 1.1.B.1: “The Contractor is solely responsible for coordinating and executing all sampling and testing.”
2. QUESTION: I was wondering if CAD drawings are available for this project?
RESPONSE: Yes. The existing conditions and proposed grading files may be requested via email. The files will be sent to a requesting vendor via email.
3. QUESTION: An Electrical subcontractor asked the following question in order to find out what the utility company charge will be: A load sheet as to how much power they are predicting to use with motor sizes & AC load, along with what voltages they are looking for.
RESPONSE:
For primary service, see note 3 under “under “Utility & excavation” sheet C1.01.
3. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION, ACQUISITION,
AND
INSTALLATION OF PRIMARY ELECTRICAL SERVICE CONDUCTOR AND
EQUIPMENT
IN CONJUNCTION WITH GREEN MOUNTAIN POWER. THIS SHALL INCLUDE
BUT NOT
BE LIMITED TO THE FOLLOWING ITEMS.
a. PADMOUNT THREE PHASE 12.5kV, 120/208V TRANSFORMER
b. THREE PHASE 15kV PRIMARY CONDUCTOR FROM UTILITY POLE TO
TRANSFORMER
c. TRANSFORMER VAULT
d. POLE RISER
e. UNDERGROUND CONDUIT
f. GMP INSTALLATION AND INSPECTION FEES
For secondary services to cold storage building, see sheet E1.01 leader note to conduit
SECONDARY ELECTRICAL SERVICE SIZE CONDUCTOR FOR 100AMP, THREE
PHASE 120/208V SERVICE. CONFIRM VOLTAGE/LOAD REQUIREMENT WITH
COR PRIOR TO INSTALLATION
For secondary services to office building, see sheet E1.01 leader note to conduit
SECONDARY ELECTRICAL SERVICE SIZE CONDUCTOR FOR 400AMP, THREE
PHASE 120/208V SERVICE. CONFIRM VOLTAGE/LOAD REQUIREMENT WITH
COR PRIOR TO INSTALLATION
4. QUESTION: We are bidding the above mentioned project and we would like to get CAD files for the project, especially for the existing conditions (C1.02) and proposed grading (C3.01). We want this files for doing a better earthwork study.
RESPONSE: Reference question and response #2 included in this amendment.
5. QUESTION: What is the status of Phase 2?
RESPONSE: Phase 2 is in the planning and design phase.
6. QUESTION: Will Phase 2 occur simultaneously with Phase 1?
RESPONSE: Phase 2 will start after the completion of Phase 1. The phases are not planned to occur simultaneously.
7. QUESTION: We are bidding this project and I was wondering about a pre-bid meeting? The bid documents are a bit confusing. One part sates there isn’t going to be a pre-bid meeting but another part seems to suggest that there will be a meeting?
RESPONSE: As stated in the solicitation: There is no pre-bid meeting for this project. The Directions to site are included in the attached plans and the site is accessible without notice to the Government. Bidders are urged and expected to inspect the site where the work will be performed. Reference solicitation.
Reference solicitation provision 52.236-27 Site Visit (Construction). (FEB 1995). Site is open and available to conduct site visits. Contact is not necessary to visit the site, but if assistance is needed contact the Contracting Officer identified as the POC on page 1 of this solicitation.
8. QUESTION: we would like to get CAD files for the project, especially for the existing conditions (C1.02) and proposed grading (C3.01).
RESPONSE: Reference question and response #2 included in this amendment.
9. QUESTION: Is there any restrictions for a “Large business” to provide a proposal? We were told on other projects that we are too large and not able to bid.
RESPONSE: In accordance with solicitation clause 52.219-6 Notice of Total Small Business Set-Aside (MAR 2020), this Invitation for Bid (IFB) is a total small business set-aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected. The NAICS applicable to this acquisition is 238910 with a size standard of $16.5M.
10. QUESTION: Is this job limited to only the site work? If so are we to leave the building area at subgrade only?
RESPONSE: The project does not include the buildings on the site. See Sheet C4.01 for the phasing plan and work limits around each building. Sheet C4.01 specifies the work within these limits. See Note 1 on Sheet C4.01 for the finish grades in the building areas.
11. QUESTION: We currently have a DUNS # Is there any further requirement to be registered @ sam.gov?
RESPONSE: A contractor must be registered in www.sam.gov in order to submit an offer on this project. THIS IS A FREE REGISTRATION. The SAM website has a tab at the top called “Help” with resources to assist contractors in registering in SAM to be eligible for federal contract award.
12. QUESTION: The following was a comment from Green Mountain power: GMP doesn’t put any underground manholes in for primary. All Primary cable junctions, need to be above ground terminal boxes.
RESPONSE: Underground manholes along the primary service lines have been incorporated for ease of wire pulling only and are not intended as cable junctions. If GMP does not require these manholes, they can be omitted under project change order https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fsam.gov%2F&data=02%7C01%7C%7Cb913686ee3194d16f6cd08d8032ff0b8%7Ced5b36e701ee4ebc867ee03cfa0d4697%7C0%7C0%7C637262851722391293&sdata=dXBskb6LsvlUZGWOeagOu%2FxNjLECEIoNkndArNrblzQ%3D&reserved=0 http://www.sam.gov/
CHANGES:
1. The solicitation due date is hereby changed as follows:
FROM: 11 June 2020 at 4:30 PM (EST)
TO: 17 July 2020 at 4:30 PM (EST)
(End of Amendment 1)
File details come from the government source that posted it. Updated .