Request for Quotation (RFQ)

View the file

Other files

File Type Posted
Amendment_03.pdf PDF
Amendment_02.pdf PDF
Amendment_01.pdf PDF
Attachment_1_-_Building_Locations.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION PAGE OF PAGES

(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING

1205M619Q0005 12/13/2018 942356 (See Section L.6) UNDER BDSA REG. 2 AND/OR DMS REG. 1 Not Rated

5a. ISSUED BY 6. DELIVER BY (Date) Mt. Baker-Snoqualmie National Forest 2930 Wetmore Ave., Suite 3A Everett, WA 98201-4067

(See Section F.2)

5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)

AREA CODE NUMBER 9. DESTINATION

Brian A. Johnson 425 783-6056 a. NAME OF CONSIGNEE

8. TO:

a. NAME b. COMPANY b. STREET ADDRESS

c. STREET ADDRESS c. CITY

d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5A ON OR

BEFORE CLOSE OF BUSINESS

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.

This request does not commit the Government to pay any costs incurred in the preparation of the

2:00 PM, January 11, 2019 submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT

PRICE

AMOUNT

(a) (b) (c) (d) (e) (f)

Building Structures Demolition

Mt. Baker-Snoqualmie National Forest (Multiple Ranger Districts)

Do Not Enter Prices Here

See Schedule of Items

Mail Quote to: USDA Forest Service Mt. Baker-Snoqualmie National Forest Attn: Brian A. Johnson, CO 2930 Wetmore Avenue, Suite 3A

E-mail to:

Everett, WA 98201-4067 brian.johnson3@usda.gov

Note: e-mail receipt of an Adobe (.pdf) file is the CO’s preferred method of receipt.

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF

a. NAME OF QUOTER SIGN QUOTATION QUOTATION

b. STREET ADDRESS 16. SIGNER

a. NAME (Type or print) b. TELEPHONE

c. COUNTY AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

Alert: A pre-quotation site visit is schedule for December 20. Refer to Section C for additional details.

RFQ No. 1205M619Q0005 Building Structures Demolition Page 1 of 134 mailto:brian.johnson3@usda.gov bajohnson03 Highlight

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

CAMP SILVERTON

BUILDING STRUCTURES DEMOLITION

MT. BAKER-SNOQUALMIE NATIONAL FOREST

GRANITE FALLS, WASHINGTON

(Snohomish County)

B.1 SCHEDULE OF ITEMS (Page 1 of 5)

BASE ITEMS #1

ITEM EST PAY UNIT TOTAL

NO. DESCRIPTION QTY UNIT PRICE PRICE

01 Demolition of Cabins 3.00 LS $_________ $_________ (Including Piers

Foundation)

02 Demolition of Bathroom 1.00 LS $_________ $_________ Building (Excluding

Concrete Slab)

03 Demolition of the Storage 1.00 LS $_________ $_________ Building (Including Concrete

Slab)

04 Demolition of Kitchen 1.00 LS $_________ $_________ Dinner Hall Building (Including Piers Foundation & Grease Tank)

05 Straw Bales 15.00 EA $_________ $_________

06 Seeding 30.00 LBS $_________ $_________

07 Backfill Materials 30.00 CY $_________ $_________

08 Topsoil 30.00 CY $_________ $_________

Base Items #1 Total Price: $_________

RFQ No. 1205M619Q0005 Building Structures Demolition Page 2 of 134

DARRINGTON COMPOUND

MT. BAKER-SNOQUALMIE NATIONAL FOREST

DARRINGTON, WASHINGTON

(Snohomish County)

B.1 SCHEDULE OF ITEMS (Page 2 of 5)

BASE ITEMS #2

ITEM EST PAY UNIT TOTAL

09 Demolition of Evidence 1.00 LS $_________ $_________ Locker Storage Building (Including Concrete Slab and One Power Pole)

10 Demolition of Pump House 1.00 LS $_________ $_________ Building (Including Concrete

Slab)

11 Seeding 20.00 LBS $_________ $_________

12 Backfill Materials 40.00 CY $_________ $_________

13 Top Soil 30.00 CY $_________ $_________

Base Items #2 Total Price: $_________

OPTION ITEMS

A Removal and Disposal of 1.00 EA $_________ $_________ Underground Heating Oil Tank (Approx. 600 Gal., Refer to Specs)

B Backfill Materials (Refer to Specs) 20.00 CY $_________ $_________

C Demolition of Seed Orchard 1.00 LS $_________ $_________ Building (Including Concrete

Slab) Option A Total Price: $__________

Option B Total Price: $__________

Option C Total Price: $__________

RFQ No. 1205M619Q0005 Building Structures Demolition Page 3 of 134

BAKER RIVER WORK CENTER

MT. BAKER-SNOQUALMIE NATIONAL FOREST

CONCRETE, WASHINGTON

(Skagit County)

B.1 SCHEDULE OF ITEMS (Page 3 of 5)

BASE ITEMS #3

ITEM EST PAY UNIT TOTAL

14 Demolition of Residence 1.00 LS $_________ $_________ Building (Including Septic Tank, Concrete Footing Foundation, Sidewalk and Asphalt Driveway)

15 Asbestos Material Remediation 1,180.00 SF $_________ $_________ (Entry Floor, Hallway and Bedroom Floor. See Attachment 4 Asbestos and Lead Paint Analysis)

16 Seeding 20.00 LBS $_________ $_________

17 Backfill Materials 150.00 CY $_________ $_________

18 Top Soil 20.00 CY $_________ $_________

Base Items #3 Total Price: $_________

RFQ No. 1205M619Q0005 Building Structures Demolition Page 4 of 134

GLACIER RESIDENCE

MT. BAKER-SNOQUALMIE NATIONAL FOREST

GLACIER, WASHINGTON

(Whatcom County)

B.1 SCHEDULE OF ITEMS (Page 4 of 5)

BASE ITEMS #4

ITEM EST PAY UNIT TOTAL

19 Demolition of Residence 1.0 SF $_________ $_________ Building (Including Septic Tank, Concrete Footing Foundation, and Sidewalk)

20 Asbestos Material Remediation 579.00 SF $_________ $_________ (Entry floor, Bathroom Floor, Living Room, Ceiling, Furnace Tape and Gasket)(See Attachment 4 Asbestos and Lead Paint Analysis)

21 Seeding 20.00 LBS $_________ $_________

22 Backfill Materials 190.00 CY $_________ $_________

23 Top Soil 20.00 CY $_________ $_________

Base Items #4 Total Price: $_________

RFQ No. 1205M619Q0005 Building Structures Demolition Page 5 of 134

B.1 SCHEDULE OF ITEMS (Page 5 of 5)

SUMMARY OF PRICES

Base Items #1 Total Price: $____________

Base Items #2 Total Price: $____________

Option A Total Price: $____________

Option B Total Price: $____________

Option C Total Price: $____________

Base Items #3 Total Price: $____________

Base Items #4 Total Price: $____________

Overall Quoted Price: $____________

B.2 CONSIDERATION FOR CONTRACT AWARD

To be considered for contract award the quoter must quote on all base and option items.

B.3 LUMP SUM (LS) QUANTITIES

These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, labor, and overhead to complete the job; they will not be measured.

RFQ No. 1205M619Q0005 Building Structures Demolition Page 6 of 134

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 PROJECT DESCRIPTION

This project entails the complete demolition of existing building structures. The work includes, but is not limited to: appliances, electrical, roofing, concrete foundations, concrete wall, trash, propane tank, heating oil tank, water tank, asbestos/lead paint removal, refrigerator and debris.

The contractor shall furnish all supervision, labor, materials, equipment, tools, transportation, travel expenses, supplies, etc. that are required to perform all elements identified in the Request for Quotation (RFQ).

C.2 BUILDING DEMOLITION LOCATIONS (Refer to Attachment 1)

Mt. Baker Ranger District:

Glacier Public Service Center 1094 Mt. Baker Hwy.

Glacier, WA 98244

Baker River Work Center 41382 State Route 20 Concrete, WA 98237

Darrington Ranger District:

Darrington Ranger Station Compound 1405 Emens Ave. N Darrington, WA 98241 (Darrington Seed Orchard Building is approx. 25 miles from Darrington Office Compound)

Verlot Public Service Center (PSC) 33515 Mountain Loop Highway Granite Falls, WA 98252 (Camp Silverton is approx. 9 miles east of the Verlot PSC)

C.3 PRE-QUOTE SITE VISIT

A pre-quote site visit will be held at the Baker River Building Residence #1000 on December 20, 2018 at 1000. If you will attend this site visit please contact Thomas Warter, Facilities Engineer, at

(425) 783-6082 or twarter@fs.fed.us.

C.4 POINTS OF CONTACT

For technical questions contact Thomas Warter, Facilities Engineer at telephone (425) 783-6082 or via e-mail at twarter@fs.fed.us. For contractual questions contact Brian A. Johnson, Contracting Officer, at (425) 783-6056 or via e-mail at brian.johnson3@usda.gov.

RFQ No. 1205M619Q0005 Building Structures Demolition Page 7 of 134 mailto:twarter@fs.fed.us mailto:twarter@fs.fed.us mailto:brian.johnson3@usda.gov

C.5 WORKING HOURS

All work shall be performed during business hours from 8:00 AM – 5:00 PM Monday - Friday. No work shall be performed on Saturday or Sunday unless approved in writing by the contracting officer.

C.6 APPLICABLE SPECIFICATIONS

The Standard Specifications and Special Project Specifications shown in the specification listing are applicable to this contract. All specifications not included in the specification listing, but referenced by listed specifications, are applicable. The Special Project Specifications shown on the specification listing are included.

C.7 DEMOLITION OF BUILDING STRUCTURES --- SUPPLEMENTAL GUIDANCE

Refer to Attachment 5 – Demolition of Building Structures for supplemental guidance.

RFQ No. 1205M619Q0005 Building Structures Demolition Page 8 of 134

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

RFQ No. 1205M619Q0005 Building Structures Demolition Page 9 of 134

SECTION E--INSPECTION AND ACCEPTANCE

E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/?q=browsefar

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (APR 1984) 52.246-1 Contractor Inspection Requirements (APR 1984) 52.246-4 Inspection of Services--Fixed-Price (AUG 1996)

RFQ No. 1205M619Q0005 Building Structures Demolition Page 10 of 134

SECTION F--DELIVERIES OR PERFORMANCE

F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

52.242-15 Stop-Work Order (AUG 1989) 52.242-17 Government Delay of Work (APR 1984)

F.2 AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1988)

The period of performance of this contract is from March 18, 2019 through June 30, 2019.

RFQ No. 1205M619Q0005 Building Structures Demolition Page 11 of 134

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 FAR 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

G.2 GOVERNMENT-FURNISHED PROPERTY (GFP)

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract: (No GFP identified at this time). This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

G.3 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:

1. Issue the Notice to Proceed / Stop-Work Order.

2. Approve Change Orders and Modifications.

3. Take Action to terminate the contract for default or Government convenience.

4. Make contract adjustments under the Differing Site Conditions clause.

RFQ No. 1205M619Q0005 Building Structures Demolition Page 12 of 134

5. Grant extensions of contract time.

6. Approve assignment of claims.

7. Make final decisions under the Disputes clause

8. Make final acceptance under the contract.

9. Make final decisions under the Stop-Work Order clause.

10. Make equitable adjustments.

11. Authorize change in amount of Payment Retention.

12. Approve subcontractors.

13. Approve payment with deductions or final payment.

14. Approve use and possession prior to completion.

15. Enforce the warranty provisions.

RFQ No. 1205M619Q0005 Building Structures Demolition Page 13 of 134

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,

AND IMPROVEMENTS ( FAR 52.236-9) (APR 1984)

(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workman, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by Contracting Officer.

(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the location of which are made know to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promtly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

H.2 USE OF PREMISES

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, written permission shall be obtained through the Contracting Officer. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor.

(b) Camping: No camping site is nearby.

H.3 ARCHAEOLOGICAL OR HISTORIC SITES (USDA 452.236-73) (FEB 1988)

If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

Attachment 6 is provided under Section J and shall be included as part of this solicitation and resultant contract:

• Forest Service Resource Protection Measures for Contract Camp Silverton Building

Removal – 2018

• NAGPRA Protocol for Inadvertent Discoveries of Human Remains and cultural items as specified by the Native American Graves Protection and Repatriation Act (NAGPRA) of

1990: PL 101-601; 25 U.S.C. 3001-3013

RFQ No. 1205M619Q0005 Building Structures Demolition Page 14 of 134

H.4 CONTROL OF EROSION, SEDIMENTATION AND POLLUTION (USDA 452.236-74)

(FEB 1988)

(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or near rivers, streams, and impoundments; or into natural or manmade channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

(c) Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

H.5 STORAGE AND STOCKPILING OF MATERIALS

Material shall be stored to assure the preservation of quantity and fitness for the work. Stored materials shall be located to facilitate their promt inspection. Sites on Forest Service administered land, approved by Forest Service, may be used for storage purposes and for the placing of Contractor's plant equipment. All storage sites provided by Forest Service shall be restored at Contractor's expense. Contractor shall be responsible for making arrangements for storage on other than Forest Service administered land.

H.6 EMERGENCY CONTROL (USDA 452.236-77) (NOV 1996)

(a) Contractor's Responsibility for Fighting Fire. (1) The Contractor, under the provision of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish, all fires on the work site other than those fires in use as a part of the work. (2) The contractor may be held liable for all damages and for all costs incurred by the Government for labor subsistence, equipment, supplies, and transportation deemed necessary to suppress a fire set or caused by the Contractor or the Contractor's agent or employees.

(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

(c) Contractor's Responsibility for Responding to Emergency. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.

H.7 FIRE PROTECTION REQUIREMENTS

The following fire requirements are attached in Section J and are applicable to this contract:

Attachment 9 – Fire Plan (R6-FS-6300-55)(2/84) Attachment 10 – Fire Protection and Suppression (R6-FS-6300-52)(5/97)

RFQ No. 1205M619Q0005 Building Structures Demolition Page 15 of 134

H.8 LANDSCAPE PRESERVATION

(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

(b) Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products onsite, appropriate preventive measures shall be taken to ensure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual states.

Servicing of all equipment shall be done only in the area approved by the Contracting Officer.

If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40CFR

112) including certification by a registered Engineer.

The Contractor will be required to make reasonable attempts to preserve the scenic and natural environment along this construction project.

(c) Trash and Refuse. The Contractor shall remove all of its own trash and refuse from the contract area. Material to be removed includes, but is not limited to; used engine oil, oil filters, oil cans, grease cartridges, camp refuse such as tin cans, paper, garbage, etc. This material must be removed to a State, County, or Municipality-designated solid waste disposal area.

H.9 BARRICADES, WARNING SIGNS, AND OTHER DEVICES

The contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, flaggers, pilot cars and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Barricades and other obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic. All operations shall conform to the current requirements and guidelines of the Occupational Safety and Health Administration (OSHA) and the Manual of Uniform Traffic Control Devices (MUTCD).

The contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points.

RFQ No. 1205M619Q0005 Building Structures Demolition Page 16 of 134

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.dm.usda.gov/procurement/policy/agar.html

52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-22 Alternative Line Item Proposal (JAN 2017)

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018)

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) (Applicable if contract exceeds $35,000) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.217-4 Evaluation of Options Exercised at Time of Contract Award (JUN 1988) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (JULY 2013)

52.222-3 Convict Labor (JUN 2003) 52.222-20 Contract for Materials, Supplies, Articles, and Equipment Exceeding $15,000

(MAY 2014)

52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEPT 2016) (Applicable if contract exceeds $10,000) 52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014) (Applicable if contract exceeds $15,000) 52.222-37 Employment Reports on Veterans (FEB 2016) 52.222-41 Service Contract Labor Standards (AUG 2018)

52.222-44 Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (MAY 2014)

52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017)

52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual)

52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (AUG 2018)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)

RFQ No. 1205M619Q0005 Building Structures Demolition Page 17 of 134 https://www.acquisition.gov/?q=browsefar http://www.dm.usda.gov/procurement/policy/agar.html Tiffany Taylor **NOTE**[USE IF CONTRACT REQUIRES PHYSICAL ACCESS TO GOV’T FACILITY OR INFORMATION SYSTEM]

52.232-1 Payments (APR 1984) 52.232-8 Discounts for Prompt Payment (FEB 2002)

52.232-9 Limitation on Withholding of Payments (APR 1984) 52.232-11 Extras (APR 1984) 52.232-16 Progress Payments (APR 2012)

52.232-23 Assignment of Claims (MAY 2014) 52.232-25 Prompt Payment (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-12 Cleaning Up (APR 1984) 52.237-2 Protection of Government Buildings, Equipment, and Vegetation (APR 1984) 52.243-1 Changes--Fixed-Price (AUG 1987)--Alternate I (APR 1984)

52.244-6 Subcontracts for Commercial Items (OCT 2018) 52.246-25 Limitation of Liability—Services (FEB 1997)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984) 52.249-4 Termination for Convenience of the Government (Services) (Short From) (APR 1984) 52.249-8 Default (Fixed-Price Supply and Service) (APR 1984)

52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.237-70 Loss, Damage, Destruction or Repair (FEB 1988)

452.237-75 Restrictions Against Disclosure (FEB 1988)

I.2 FAR 52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT (OCT 1997)

Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(a) The Schedule (excluding the specifications).

(b) Representations and other instructions.

(c) Contract clauses.

(d) Other documents, exhibits, and attachments.

(e) The specifications.

I.3 FAR 52.217-7 OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE

ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within [insert in the clause the period

RFQ No. 1205M619Q0005 Building Structures Demolition Page 18 of 134 of time in which the Contracting Officer has to exercise the option]. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

I.4 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES

(MAY 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.

This Statement is for Information Only:

It Is Not A Wage Determination.

Employee Class Monetary Wage--Fringe Benefits

Facilities Laborer GS-5/Step 5 $19.67 (Basic) / $29.51 (Overtime) Facilities Laborer GS-6/Step 5 $21.92 (Basic) / $32.88 (Overtime) Facilities Laborer GS-7/Step 5 $24.36 (Basic) / $36.54 (Overtime)

I.5 FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (SEPT 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—

(1) The product cannot be acquired—

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

RFQ No. 1205M619Q0005 Building Structures Demolition Page 19 of 134 http://uscode.house.gov/ http://uscode.house.gov/ http://www.biopreferred.gov/

(c) In the performance of this contract, the Contractor shall—

(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report not later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

I.6 FAR 52.228-16 PERFORMANCE AND PAYMENT BONDS-OTHER THAN

CONSTRUCTION (NOV 2006)

(Important Note: The awardee is only required to provide a Performance Bond; a Payment Bond is not required.)

(a) Definitions. As used in this clause-

“Original contract price” means the award price of the contract or, for requirements contracts, the price payable for the estimated quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) The Contractor shall furnish a performance bond (StandardForm1418) for the protection of the Government in an amount equal to 100 percent of the original contract price and a payment bond StandardForm1416) in an amount equal to ______ percent of the original contract price.

(c) The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within fourteen (14) calendar days, but in any event, before starting work.

(d) The Government may require additional performance and payment bond protection if the contract price is increased. The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bonds or to obtain additional bonds.

(e) The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register, or may be obtained from the:

U.S. Department of the Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/.

RFQ No. 1205M619Q0005 Building Structures Demolition Page 20 of 134 http://www.sam.gov/ http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://www.fms.treas.gov/c570/

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

The attachments to the Statement of Work/Specifications listed below are hereby made part of this solicitation and any resultant contract.

Attachment Attachment

No. Description Total Pages

1. Building Locations 6

2. Project Photos 11

3. Project Specifications 16

4. Asbestos and Lead Paint Analysis 05

5. Demolition of Building Structures 06

6. Camp Silverton Resource Protection Measures 08

7. Wage Determinations 33

• WD No. 2015-5523 (Whatcom)

• WD No. 2015-5531 (Skagit)

• WD No. 2015-5535 (Snohomish)

8. Experience Questionnaire 2

9. Fire Plan (R6-FS-6300-55)(2/84) 3

10. Fire Protection and Suppression (R6-FS-6300-52)(5/97) 7

RFQ No. 1205M619Q0005 Building Structures Demolition Page 21 of 134

Bellingham

Everett

Seattle

Tacoma

Arlington

Darrington

VICINITY MAP

Glacier Public Service Center

Baker River Work Center

Darrington Seed Orchard

Supervisor's Office

Enumclaw

Mt. Baker District

Darrington District

Skykomish District

Snoqualmie District

MT. RAINIER

NATIONAL PARK

Mt. Baker-Snoqualmie National Forest

North Bend

Sedro Woolley

Sheet 1 of 6

Camp Silverton

Darrington Ranger Compound

DARRINGTON DISTRICT RANGER

FACILITIES ENGINEER

FOREST ENGINEER

MT. BAKER DISTRICT RANGER

Attachment 1 - Building Locations

RFQ No. 1205M619Q0005 Building Structures Demolition Page 22 of 134

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Washington

AutoCAD SHX Text

CANADA

AutoCAD SHX Text

UNITED STATES

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

RECOMMENDED BY:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED BY:

B U

IL

D

IN

G

L E

G E

N D

213019082233

H W

Y

T O

G L

A C

IE

R

R E

SID

E

N C

E R

E

SID

E N

C E

R E

SID

E

N C

E R

E

SID

E N

C E

G L

A C

IE

R

PSC

R

E C

ST

O

R A

G E

C A

R

PE

N T

R Y

SH

O

P B

U N

K H

O U

SE

/O

FFIC

E

ST

O

R A

G E

SH

E

D R

E C

/FIR

E

/K

IT

C H

E N

G A

S &

ST

O R

A G

E

M T

. B A

K E

R R

A N

G E

R D

IST

R

IC

T

G L

A C

IE

R

PU

B

L

IC

SE

R

V

IC

E C

E N

T E

R

PU

B L

IC

R

E

ST

R O

O M

PA

IN

T

ST

O

R A

G E

H E

A T

H E

R M

E A

D O

W

S PSC

B U

IL

D

IN

G

D E

M O

L

IT

IO

N

1094 M T

. B A

K E

R H

Y W

G

L A

C

IE

R , W

A 98244

(IN

C

L U

D E

SE

PT

IC

SY

ST

E

M

RFQ No. 1205M619Q0005 Building Structures Demolition Page 23 of 134

AutoCAD SHX Text N

AutoCAD SHX Text R-6

AutoCAD SHX Text

PACIFIC NORTHWEST REGION

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text

FOREST SERVICE

AutoCAD SHX Text

U.S. DEPARTMENT OF AGRICULTURE

AutoCAD SHX Text

MT. BAKER-SNOQUALMIE NATIONAL FOREST

AutoCAD SHX Text Reviewed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Design

AutoCAD SHX Text Checked

AutoCAD SHX Text Project Name

AutoCAD SHX Text Forest

AutoCAD SHX Text of

AutoCAD SHX Text Scale

AutoCAD SHX Text Sheet Title

AutoCAD SHX Text Sheet

AutoCAD SHX Text Mt. BAKER RANGER DISTRICT

AutoCAD SHX Text

THOMAS TRAN WARTER

AutoCAD SHX Text

GLACIER PUBLIC SERVICE CENTER

AutoCAD SHX Text

MT. BAKER-SNOQUALMIE NF.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

BUILDING DEMOLITIONS

BUILDING DEMOLITION

RFQ No. 1205M619Q0005 Building Structures Demolition Page 24 of 134

RESIDENCE BUILDING

AutoCAD SHX Text

RESIDENCE/BUNKHOUSE

AutoCAD SHX Text

RESIDENCE/BUNKHOUSE

AutoCAD SHX Text

BUNKHOUSE

AutoCAD SHX Text

PUMPHOUSE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

%%UBUILDING LEGEND

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WAREHOUSE

AutoCAD SHX Text

GAS HOUSE

AutoCAD SHX Text

WAREHOUSE

AutoCAD SHX Text

STORAGE BUILDING

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SKAGIT RIVER

AutoCAD SHX Text

HWY 20

AutoCAD SHX Text

TO CONCRETE

AutoCAD SHX Text

RAILROAD TRACKS

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

4.5 MILES

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

AREA

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

FENCELINE

AutoCAD SHX Text %%uMT. BAKER RANGER DISTRICT

AutoCAD SHX Text

BAKER RIVER WORK CENTER

AutoCAD SHX Text R-6

AutoCAD SHX Text

PACIFIC NORTHWEST REGION

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text

FOREST SERVICE

AutoCAD SHX Text

U.S. DEPARTMENT OF AGRICULTURE

AutoCAD SHX Text

MT. BAKER-SNOQUALMIE NATIONAL FOREST

AutoCAD SHX Text Reviewed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Design

AutoCAD SHX Text Checked

AutoCAD SHX Text Project Name

AutoCAD SHX Text Forest

AutoCAD SHX Text of

AutoCAD SHX Text Scale

AutoCAD SHX Text Sheet Title

AutoCAD SHX Text Sheet

AutoCAD SHX Text Mt. BAKER RANGER DISTRICT

AutoCAD SHX Text

THOMAS TRAN WARTER

AutoCAD SHX Text

BAKER RIVER WORK CENTER

AutoCAD SHX Text

MT. BAKER-SNOQUALMIE NF.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING DEMOLITION

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

BUILDING DEMOLITIONS

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

DEMOLITION

AutoCAD SHX Text

41382 STATE ROUTE 20

AutoCAD SHX Text

CONRETE, WA 98237

AutoCAD SHX Text

(INCLUDE SEPTIC SYSTEM

AND DRIVEWAY)

23162317

D A

R R

IN

G

T O

N R

A N

G E

R D

IST

R

IC

T

D A

R R

IN

G

T O

N C

O M

PO

U

N D

B U

IL

D

IN

G

L E

G E

N D

R E

SID

E

N C

E R

E

SID

E N

C E

R E

SID

E

N C

E C

A R

PE

N

T R

Y

SH

O P

M E

N B

U N

K H

O U

SE

C

O E

D B

U N

K H

O U

SE

G

A R

A G

E G

A R

A G

E G

A R

A G

E M

A

IN

T E

N A

N C

E O

FFIC

E

L O

G

SC

A L

E B

L D

G D

A R

R

IN

G T

O N

O

FFIC

E

ST

O R

A G

E

PA

IN

T

ST

O

R A

G E

B L

D G

SIG

N

ST

O

R A

G E

FIR

E

W A

R E

H O

U

SE

G A

R A

G E

PO

L

E

ST

O R

A G

E W

E

ST

M A

IN

T

E N

A N

C E

SH

O

P E

Q U

IPM

E

N T

SH

E

D

SE

E D

O R

C H

A R

D B

A R

N

/ST

A B

L E

G A

S B U

IL

D

IN

G

T R

E E

C O

O L

E R

E V

ID

E

N C

E L

O C

K E

R

W A

SH

SH

E D

SH

E

L T

E R

PO

L

E

ST

O R

A G

E E

A

ST

1405 E M

E N

S A V

E . N

D A

R R

IN

G

T O

N , W

A 98241

B U

IL

D

IN

G

D E

M O

L

IT

IO

N

B U

IL

D

IN

G

D E

M O

L

IT

IO

N

U N

D E

R G

R O

U N

D O

IL

ST

O R

A G

E T

A N

K R

E M

O V

E A

N D

D

ISPO

SE

PO

W

E R

PO

L

E T

O B

E R

E M

O V

E D

RFQ No. 1205M619Q0005 Building Structures Demolition Page 25 of 134

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text Reviewed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Design

AutoCAD SHX Text

MT. BAKER-SNOQUALMIE NATIONAL FOREST

AutoCAD SHX Text

DARRINGTON COMPOUND

AutoCAD SHX Text Checked

AutoCAD SHX Text Sheet

AutoCAD SHX Text Project Name

AutoCAD SHX Text

AutoCAD SHX Text Forest

AutoCAD SHX Text

MT. BAKER-SNOQUALMIE NF.

AutoCAD SHX Text of

AutoCAD SHX Text Scale

AutoCAD SHX Text Sheet Title

AutoCAD SHX Text

DARRINGTON RANGER DISTRICT

AutoCAD SHX Text

AutoCAD SHX Text

BUILDINGS DEMOLITION

AutoCAD SHX Text

NOT TO SCALE

BUILDING DEMOLITIONS

D A

R R

IN

G

T O

N R

A N

G E

R D

IST

R

IC

T

V E

R L

O T

PU

B

L

IC

SE

R

V

IC

E C

E N

T E

R

B U

IL

D

IN

G

S D

E M

O L

IT

IO

N

C A

M

P SIL

V E

R T

O N

9 M

IL

E S E

A

ST

O F V

E R

L O

T

PSC

G R

A N

IT

E

FA

L

L S, W

A 98252

M O

U N

T A

IN

L

O O

P H Y

W

G E

N E

R A

T O

R

PU

M

P H O

U

SE

B A

T H

R O

O M

E Q

U

IPM

E N

T

R E

SO

U

R C

K

IT

C H

E N

CABIN

R U

C K

E R

C E

N T

E R

ST

O

R A

G E

B U

IL

D

IN

G

L E

G E

N D

B U

IL

D

IN

G

A N

D W

O O

D

SH

ED

A

LPIN

E

CA

BIN

CASCADE

C A

B

IN

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

33515 M O

U N

T A

IN

L

O O

P H W

Y

D O

N O

T R

E M

O V

E C

O N

C R

E T

E

SL

A B

D

ISC

O

N N

E C

T A

N D

C A

P A L

L U

T

IL

IT

IE

S L

IN

E

S A N

D

SE

PT

IC

SY

ST

E M

FO

FU

T U

R E

U

SE

ST

R

A W

B A

L E

B A

R R

IE

R

W

IT

H

2 - 42" ST

A K

E

S PE

R B

A L

E (C

U T

L O

O

SE

A N

D

SPR

E

O U

N D

A R

E A

A

FT

B

U

IL

D

IN

G D

E M

O L

IT

IO

N

K

IT

C H

E N

G R

E Y

W A

T E

R

G R

E A

SE

T

A N

K

RFQ No. 1205M619Q0005 Building Structures Demolition Page 26 of 134

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text Design

AutoCAD SHX Text Checked

AutoCAD SHX Text

MT. BAKER-SNOQUALMIE NATIONAL FOREST

AutoCAD SHX Text Reviewed

AutoCAD SHX Text Sheet

AutoCAD SHX Text Drawn

AutoCAD SHX Text Project Name

AutoCAD SHX Text

CAMP SILVERTON

AutoCAD SHX Text Forest

AutoCAD SHX Text of

AutoCAD SHX Text

AutoCAD SHX Text

MT. BAKER-SNOQUALMIE NF.

AutoCAD SHX Text Scale

AutoCAD SHX Text Sheet Title

AutoCAD SHX Text

DARRINGTON RANGER DISTRICT

AutoCAD SHX Text

AutoCAD SHX Text

BUILDINGS DEMOLITION

AutoCAD SHX Text

NOT TO SCALE

R R

IN

G

T O

N R

A N

G E

R D

IST

R

IC

T

1405 E M

E N

S A V

E N

U E

N O

R T

H

D A

R R

IN

G

T O

N

SE

E D

O R

C H

A R

D

PO

L E

B U

IL

D

IN

G

R

R

IN

G T

O N

, W A

98241

25 M

IL

E

S FR

O M

D A

R R

IN

G

T O

N R

A N

G E

R O

FFIC

RFQ No. 1205M619Q0005 Building Structures Demolition Page 27 of 134

E

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text Design

AutoCAD SHX Text Checked

AutoCAD SHX Text

MT. BAKER-SNOQUALMIE NATIONAL FOREST

AutoCAD SHX Text Reviewed

AutoCAD SHX Text Sheet

AutoCAD SHX Text Drawn

AutoCAD SHX Text Project Name

AutoCAD SHX Text

DARRINGTON SEED ORCHARD

AutoCAD SHX Text Forest

AutoCAD SHX Text of

AutoCAD SHX Text

AutoCAD SHX Text

MT. BAKER-SNOQUALMIE NF.

AutoCAD SHX Text Scale

AutoCAD SHX Text Sheet Title

AutoCAD SHX Text

DARRINGTON RANGER DISTRICT

AutoCAD SHX Text

AutoCAD SHX Text

POLE BUILDING DEMOLITION

AutoCAD SHX Text

NOT TO SCALE

PROJECT PHOTOS

Alpine Cabin Building #1 (Electrical to be removed)

Attachment 2 - Project Photos

RFQ No. 1205M619Q0005 Building Structures Demolition Page 28 of 134

Cascade Cabin Building #2 (Electrical to be removed)

RFQ No. 1205M619Q0005 Building Structures Demolition Page 29 of 134

Rucker Cabin Building #3 (Electrical to be removed)

RFQ No. 1205M619Q0005 Building Structures Demolition Page 30 of 134

Kitchen Building #4 and Wood Shed (electrical to be removed and water to be capped with valve box)

RFQ No. 1205M619Q0005 Building Structures Demolition Page 31 of 134

Bathroom Building #5 (Electrical and water to be removed; preserve concrete slab and septic Tank)

RFQ No. 1205M619Q0005 Building Structures Demolition Page 32 of 134

Equipment Storage Building #6 (electrical to be removed; 50-gallon diesel drum to be removed)

RFQ No. 1205M619Q0005 Building Structures Demolition Page 33 of 134

Form Pump House Building #1816 (all power currently disconnected)

RFQ No. 1205M619Q0005 Building Structures Demolition Page 34 of 134

Evident Locker Building #2620 (remove power pole (power currently disconnected))

RFQ No. 1205M619Q0005 Building Structures Demolition Page 35 of 134

Optional Item C - Darrington Seed Orchard Building #2376 (building located 25 miles from Darrington Ranger Station)

RFQ No. 1205M619Q0005 Building Structures Demolition Page 36 of 134

Baker River Work Center Residence Building #1000

RFQ No. 1205M619Q0005 Building Structures Demolition Page 37 of 134

Glacier PSC Residence Building #1097

RFQ No. 1205M619Q0005 Building Structures Demolition Page 38 of 134

SECTION 02 82 00

ASBESTOS MATERIAL REMEDIATION

1. PART 1 - GENERAL

1.01 SUMMARY

A. This section specifies the removal and disposal of asbestos-containing materials.

B. The materials to be removed are located in the bedroom, hallway, living room and bathroom floor of the residence.

1.02 RELATED SECTIONS

1.03 REFERENCES

A. Code of Federal Regulations (CFR):

1. 29 CFR 1910.1001 Occupational Safety and Health Act (OSHA)

2. 29 CFR 1910.20 General Safety and Health Provisions

3. 40 CFR 61 Subpart M U.S. Environmental Protection Agency

Regulations for Asbestos B. State Codes and Ordinances:

1. Those State and Local Codes, which regulate conduct of such work.

1.04 SUBMITTALS

A. Plan of Action.

1. The Contractor shall submit a detailed plan of the procedures they intend to use to comply with the regulations included in this specification. The plan shall include the location and layout of decontamination areas, the sequencing of asbestos work, the interface of trades involved in the performance of work, methods to be used to assure the safety of building occupants and visitors to the site, disposal plan including location of approved disposal site, sampling and testing, and a detailed description of the methods to be employed to control pollution. The plan must be approved by the Contracting Officer prior to commencement of work for conformance to these specifications.

2. Prepare and maintain onsite written demolition plans or method of operation

(WAC 296-155-775)

B. Contractor Qualification Information.

1. Record of experience qualifying the firm as a specialist in asbestos abatement shall be submitted with the bid. As a minimum, this shall include documentation of successful performance in asbestos removal including the name and address of the purchaser of the service, location of work performed, and a record of air monitoring as required by 29 CFR 1910.1001.

C. Certificates of Compliance.

1. Submit certification that vacuums, ventilation, and other equipment required to contain airborne asbestos fibers conform to Federal, State and Local regulations.

Attachment 3 - Project Specifications

RFQ No. 1205M619Q0005 Building Structures Demolition Page 39 of 134

2. Notify the local clean-air agency of the upcoming asbestos removal AND demolition 10 days prior to commencement of work, or in accordance with state regulations.

1.05 QUALITY ASSURANCE

A. Contractor Qualifications.

1. The Contractor shall be a firm of established reputation (or, if newly organized, whose personnel have previously established a reputation in the field) that is regularly engaged in and that maintain a regular force of workers skilled in asbestos abatement and shall have performed this work on previous projects.

2. The Contractor and their employees shall be licensed to remove asbestos material as required by the State.

1.06 REGULATORY REQUIREMENTS

A. The Contractor shall be responsible for obtaining approval for a waste disposal site in compliance with Section 61.25 of the EPA regulations.

B. The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and Local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site. The Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable Federal, State, and Local regulations.

C. Remove asbestos prior to demolition (WA DOL certification required) D. Designate and dispose of demolition debris in accordance with state regulations E. Asbestos Control Limits.

1. Inside Asbestos Work Area.

a. Air concentrations of asbestos shall not exceed an 8 hour time weighted average of 0.2 fibers (longer than 5 micrometers) per cubic centimeter of air. See 29 CFR 1910.1001.

2. Outside Asbestos Work Area.

a. Air concentrations of asbestos shall be maintained at an 8 hour time weighted average below 0.1 fiber (longer than 5 micrometers) per cubic centimeter of air. This applies to all areas in the building while work is in progress, except for the asbestos work area.

3. Final Clearance.

a. After final clean up, concentrations shall be below 0.01 fibers per cubic centimeters of air.

1.07 PROJECT CONDITIONS

A. Means of Egress.

1. Establish and maintain emergency and fire exits from the work area.

B. Use of Existing Facilities.

RFQ No. 1205M619Q0005 Building Structures Demolition Page 40 of 134

1. The Contractor may use electricity, water and sanitation facilities in the building for project use only without charge.

C. Access to Work Area.

1. Access to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.